Jin Huang M.I.T. For Transversity Analysis Meeting Sept 10, JLab.

Slides:



Advertisements
Similar presentations
Jin Huang PhD Candidate, MIT For MENU 2010 May 31, Williamsburg.
Advertisements

Run Plan Document E04-007: Threshold Pion Production.
Jin Huang Los Alamos National Lab.  Cited from March collaboration Meeting EC group Internal Communication Jin Huang 2 Preshower ID power drop significantly.
EH1 (AD 1&2, IWS, OWS) PMT Jul. 30 – Aug. 20 RollingGain Calibration Summary Zhe Wang (BNL) and Qing He (Princeton) Aug. 22, 2011.
A Package For Tracking Validation Chris Meyer UC Santa Cruz July 6, 2007.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
Review of PID simulation & reconstruction in G4MICE Yordan Karadzhov Sofia university “St. Kliment Ohridski” Content : 1 TOF 2 Cerenkov.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Algorithms and Methods for Particle Identification with ALICE TOF Detector at Very High Particle Multiplicity TOF simulation group B.Zagreev ACAT2002,
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
Forward Detectors and Measurement of Proton-Antiproton Collision Rates by Zachary Einzig, Mentor Michele Gallinaro INTRODUCTION THE DETECTORS EXPERIMENTAL.
Short Range Correlations E07006 Run coordinator report SRC-E07006.pdf SRC-E07006.pptx.
BigBite Wire Chamber Test Xin Qian Duke University Feb 20th For TRANSVERSITY Collaboration Wire chamber Gas Cerenkov Shower system Scintillator Magnetic.
Jin Huang M.I.T. For Transversity Collaboration Meeting Sept 24, JLab.
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Jin Huang PhD Candidate, MIT For Hall A Collaboration Meeting June 10, JLab.
LOGO The η -mass measurement with the Crystal Ball at MAMI A. Nikolaev for the Crystal MAMI and A2 Collaborations Helmholtz Institut für Strahlen-
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
October 14, 2004 Single Spin Asymmetries 1 Single Spin Asymmetries for charged pions. Overview  One physics slide  What is measured, kinematic variables.
Hongyu Fu, Trigger group The Monte Carlo for Trigger Design of BES3 Scintillating Fibre BEMC Outline: Introduction to BES3 Scin-fibre BEMC Trigger.
BigCal Reconstruction and Elastic Event Selection for GEp-III Andrew Puckett, MIT on behalf of the GEp-III Collaboration.
Two Density-based Clustering Algorithms L. Xia (ANL) V. Zutshi (NIU)
Jin Huang M.I.T. For Transversity Analysis Meeting Jun 18, JLab.
7 May 2009Paul Dauncey1 Tracker alignment issues Paul Dauncey.
BigCal Calibration E04-108& Wei Luo Lanzhou University, China January 2008 Hall C Users Meeting.
NEMO3 analysis and SuperNEMO development Benjamin Richards D14.
PID simulations Rikard Sandström University of Geneva MICE collaboration meeting RAL.
Jin Huang M.I.T. For Transversity Collaboration Meeting Mar 26, JLab.
Jin Huang, Xin Qian For Transversity Analysis Meeting May 3, 2010.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
Jin Huang M.I.T. For Transversity Analysis Meeting Jul 02, JLab.
Jin Huang M.I.T. For Transversity Collaboration Meeting Jan 29, JLab.
1 M2-M5 Efficiency and Timing checks on 7TeV beam data Alessia, Roberta R.Santacesaria, April 23 rd, Muon Operation
DN/d  and dN/dp T analysis status Gabor Veres for the working group QCD meeting, Jan 12, 2010.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
Tomas Hreus, Pascal Vanlaer Overview: K0s correction stability tests Jet-pt correction closure test Study of Strangeness Production in Underlying Event.
MINOS Coll Meet. Oxford, Jan CC/NC Data Cross Checks Thomas Osiecki University of Texas at Austin.
Layer00 Efficiency Studies Stephen Levy, UChicago.
Development of a pad interpolation algorithm using charge-sharing.
T585 analysis status 2005/12/02 HIDEYUKI SAKAMOTO This analysis was done by RUN# (+1.0 GeV/c normal beam run) For the problem of small light yield.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Jin Huang M.I.T. For Transversity Analysis Meeting Feb08, JLab.
Analysis of    production ► Data taking ► Reaction identification ► Results for double polarization observable F ► Summary Based on data taken in the.
QWG Sept 20-22, Jundong Huang Indiana University 1 DØ Quarkonium Production at DØ Jundong Huang Indiana University Quarkonium Workshop FermiLab September.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
Transversal calibration of Geiger Cells
MICE Collaboration Meeting
SANE Cherenkov - Bigcal Efficiency Update
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
Jin Huang Los Alamos National Lab
Simulation Updates on PVDIS EC
Status of the TOF Detector
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Individual Particle Reconstruction
The time-of-flight reconstruction & calibration
Energy Calibration with Compton Data
SOS Cerenkov Purpose: provide PID for NA Cerenkov efficiency studies
Contents First section: pion and proton misidentification probabilities as Loose or Tight Muons. Measurements using Jet-triggered data (from run).
Programs for the calibration of TOF measurement with the new pulser
Current status Minjung Kim
Study of MDC tuning.
BESIII TOF Digitization
SEM: Step by Step In AMOS and Mplus.
Zhiwen Zhao,UVa for EC group
Presentation transcript:

Jin Huang M.I.T. For Transversity Analysis Meeting Sept 10, JLab

Transversity Analysis Meeting Jin Huang 2

 On BigBite side, normal Coinc Timing using track information to ◦ Selecting Scintillator Hit ◦ Calculating Path length correction  Tracking-Free Coinc Timing needed for ◦ Study no-track events (a lot) ◦ Study photon-like event on BigBite and its asym.  Calculated by ◦ Matching Largest Total Shower hit to Scintillator hits ◦ Calculating Path length base on shower/scint hit position Transversity Analysis Meeting Jin Huang 3

 With Pion PID Cut on HRS  No Cut on BigBite Side  Background Higher : 2ns period pulse Transversity Analysis Meeting Jin Huang 4

 With Proton PID Cut on HRS  No Cut on BigBite Side  Proton Peak Aligned to 0ns Transversity Analysis Meeting Jin Huang 5

 Fit of TF CT VS good production/ref cell Run  10% of run replayed  Stable Cross Running period Transversity Analysis Meeting Jin Huang 6 HRS Retiming Problem

Transversity Analysis Meeting Jin Huang 7 Matched PS/Sh Cluster All 0 Track Events Matched PS/Sh Cluster All 0 Track Events Event With valid TF CT Events with Cluster Event With valid TF CT Events with Cluster

Transversity Analysis Meeting Jin Huang 8

 Scintillator are used to calculate CTs  Its data quality never checked  Although CT is shown to be stable Double check CT could unveil microscopic problems  Checked with Production 3 / Skimmed Root Files, All runs ◦ All ADC/TDC mean value/RMS vs runs ◦ Track Timing Matching Efficiency Transversity Analysis Meeting Jin Huang 9

 L1A Problems ◦ Solved  Drop~10chan for all period ◦ Why?  Left PMT #4 ADC break from ◦ Should be little effect to CT Transversity Analysis Meeting Jin Huang 10

Transversity Analysis Meeting Jin Huang 11

 TDC checked with T5 Cut ◦ Retiming Problems Solved  Matching Efficiency to Track ◦ Low Eff During Retiming Problem Period ◦ Seeing two L1A problem Period Transversity Analysis Meeting Jin Huang 12

Transversity Analysis Meeting Jin Huang 13

Transversity Analysis Meeting Jin Huang 14

Transversity Analysis Meeting Jin Huang 15

 Low ADC during Retiming Problem Period?  HV Change in Jan (Recalibrated in DB)  Bar 10 loose cable,  Random Gain Drop Around 5450? ◦ Most run with low statistic Transversity Analysis Meeting Jin Huang 16

Transversity Analysis Meeting Jin Huang 17

Transversity Analysis Meeting Jin Huang 18

 TDC is stable ◦ Two Timing Adjustment, Automatically taken care of during CT calculation  Matching Eff. To Tracks ◦ Low Matching Eff. at beginning of running? ◦ 0 Hit Effeciency ~ 5640 : F1 TDC DMA transfer terminated by unknown BUS Error ve/ html ve/ html Transversity Analysis Meeting Jin Huang 19

Transversity Analysis Meeting Jin Huang 20

Transversity Analysis Meeting Jin Huang 21

 Scintillator is generally stable  Few problems listed above  Double check again after pass 4 Transversity Analysis Meeting Jin Huang 22

Transversity Analysis Meeting Jin Huang 23

Transversity Analysis Meeting Jin Huang 24

Transversity Analysis Meeting Jin Huang 25

Transversity Analysis Meeting Jin Huang 26

Transversity Analysis Meeting Jin Huang 27