1.2 MW LBNE Horns Cory F. Crowley Fermi National Accelerator Lab September 25, 2014 9 th International Workshop on Neutrino Beams and Instrumentation Cory.

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

Target chase, decay and absorber cooling for LBNE A. Marchionni, Fermilab 8th International Workshop on Neutrino Beams & Instrumentation CERN, November.
Introduction to Plasma-Surface Interactions Lecture 6 Divertors.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
UNIT 13 : HEAT 13.1 Thermal Conductivity 13.2 Thermal Expansion.
September 24-25, 2003 HAPL meeting, UW, Madison 1 Armor Configuration & Thermal Analysis 1.Parametric analysis in support of system studies 2.Preliminary.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
NuMI Horn Construction and Testing
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
NBI CNGS Horns Status Presented by Sandry Wallon 1 NBI 2003 – KEK, Japan 7-11 nov CNGS Horns : Status 8 nov
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.
NUMI Transmission Line (TL), Remote Clamp & TL Block Review WBS Power Supply System Level 3 Manager Nancy Grossman FNAL February 26, 2002.
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
Apex Target Marco Oriunno, April 23, Design and fabrication by: Marco Oriunno, Dieter Walz, Jim McDonald, Clive Field, Douglas Higginbotham, and.
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
NUMI Transmission Line (TL) Review: Design Details TL through Block & Beyond Design/Status Bill Boettinger FNAL April 23, 2003.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Status Update of Ongoing Efforts for NuMI Horn 1 Stripline Redesign and Horn Change Out Kris E. Anderson All Experimenter’s Meeting 06-Jul-2015.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
NuMI NBI03 November 7-11, 2003 FNAL thin beam windows Jim Hylen / FNAL Page 1 FNAL experience with thin beam windows Issue is: Survival of window in high.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
NUMI Transmission Line (TL) Review WBS Power Supply System Transmission Line (TL) Review Nancy Grossman FNAL April 23, 2003.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
Calculation of Beam loss on foil septa C. Pai Brookhaven National Laboratory Collider-Accelerator Department
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Welding Inspection and Metallurgy
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
J-PARC neutrino experiment Target Specification Graphite or Carbon-Carbon composite cylindrical bar : length 900mm, diameter 25~30mm The bar may be divided.
NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 1 NuMI Target Status, Testing, Support Module At NBI’02: Beam test results of Medium.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
High Intensity Beam Test of Beryllium for Target and Beam Window Applications Presented by: Brian Hartsell Contributors: Kavin Ammigan, Patrick Hurh NBI.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
LBNE Remote Handling Conceptual Design Issues for ORNL Collaboration Kick-off Meeting at ORNL 1/6/2010.
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
NuMI horn stripline failure, analysis, and recovery or The Case of the Cracked Stripline P. Hurh* Fermilab April *On behalf of Target Systems.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
LBNE Target Pile & Decay Pipe Cooling Andy Stefanik and Ang Lee – Fermilab September 25, 2014.
Status of the FAIR pbar target: Target handling study (M. Helmecke)
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Beamline for the LBNE Project Heidi Schellman for the LBNE collaboration.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
New nTOF target: Design Issues
Coupled thermal-structural FEA of AS tooling for brazing of manifolds to disk stack R. Raatikainen, F. Rossi
Development of a low material endplate for LP1 and ILD
News and brief overview of Beamline plans for the next few months
EUROnu Beam Window Studies Stress and Cooling Analysis
Overview of mechanical design & construction
Cryomodule Assembly Plan
Presentation transcript:

1.2 MW LBNE Horns Cory F. Crowley Fermi National Accelerator Lab September 25, th International Workshop on Neutrino Beams and Instrumentation Cory Crowley NBI 20141

Current Configuration 1. Position in LBNF Target Hall 2. Horn Requirements 3. Conductor Design Manufacturing Considerations 1. Conductor Fabrication 2. Welding Design 1. Horn Subsystems 2. Ancillary Components Support Structures 1. Module Design 2. Cooling Needs 1.2 MW Horn 1 Analysis Power Supply Additional Studies: Horn 1 Stripline, Horn 2, Horn 2 Stripline Conclusion Outline Cory Crowley NBI 20142

Horns sit downstream of the NuMI style target and carrier, supported by modules which rest on steel crossbeams. The target will be inserted into the inner conductor of Horn 1, which is followed by Horn 2 further down the beamline. These disposable components are top- loaded and sit level as opposed to NuMI / NOvA where the entire target hall follows the beamline angle. - Will help with ease of assembly as opposed to sitting at a steeper angle. - Allows for easier movement of shielding and robust, newly designed alignment mechanisms Position in LBNF Target Hall Target Horn 1 Horn 2 Cory Crowley NBI 20143

Horn Systems - Requirements Horn systems must have connections that are able to be made or unmade remotely - Necessary for remote handling operations. -Possible horn repairs or decommissioning require access to major fasteners & components. Design for long-term reliability - Must provide reliable operation for at least 2 years or 30 million pulses due to spare production capacity restraints. -All materials must withstand a radioactive, corrosive environment, at elevated temperatures. Derived production parameters - Must use radiation-hard materials. -Inner conductors must utilize electroless nickel plating for increased fatigue life and corrosion resistance. -Outer conductors & brackets must utilize Type III Hard-coat anodizing for corrosion resistance. Aluminum Stainless Steel Titanium Alumina ceramics Zirconia ceramics Cory Crowley NBI 20144

Conductor Design Two-horn focusing system. Geometrical shape of Horn 1 & 2 conductors are identical to the NuMI / NOvA horn design. LBNE Horn 1 LBNE Horn 2 660cm NuMI / NOvA Horn designs have an extensive operational history. Conductor and subsystem designs have been validated over millions of pulses. Allows significant cost savings over redesigning and prototyping a new horn system. Cory Crowley NBI 20145

Conductor Design Cont. Horn 1 has a double-paraboloid inner conductor, with the upstream parabola surrounding the target, followed by the downstream parabola after the neck region. Target must fit in horn with adequate clearance so as to not touch the inner conductor during operation. Optimal clearance is ~2mm. Horn 2 layout follows that of Horn 1, although the inner and outer conductors have slightly thicker walls due to their size, and lessened effects from beam heating compared to Horn 1. Inner Conductor, 2 mm Wall Target Ceramic Insulator Outer Conductor 0.33m Outer Diameter, 16 mm Wall Neck Cory Crowley NBI 20146

Our experience is that outer conductors are generally straightforward to fabricate and can be trouble free if proper attention is given during production. Inner conductor segments can be problematic depending upon optics requirements and/or physics constraints. - Large, thin walled designs have a tendency to spring after machining and can be impossible to assemble. - Generally conductor wall thickness will be tied to the required diameter. - Horn 1 I.C. thickness is 2mm based on a diameter range of ~ 3cm - 20cm, while Horn 2 I.C thickness is 3mm based on a diameter range of 10cm – 60cm. - Resistive heating from current pulse also contributes to designed thickness. Manufacturing Considerations – Conductor Fabrication Cory Crowley NBI 20147

Manufacturing Considerations – Welding Current Capabilities: - With in-house CNC TIG welding, we are able to achieve circularity and concentricity of ±0.015” (~.5mm), with voids <0.010” (.25mm). - Must utilize clean handling & tight tolerances to control internal weld porosity. - These steps can yield a NAS 1514 Class 1 Weld. Thoughts for future designs: - Minimizing number or complexity of conductor segments can significantly reduce welding & straightening time. - Long, slender horns will require more support rings & thicker weld regions. Cory Crowley NBI 20148

Horn Subsystems Experiences and technologies from NuMI / NOvA Horns will be implemented. Hanger to remotely plug into module Water manifolds Water tank & horn assembly supports Support clamps for water tank and manifold mounting points All subsystems have had a very good operational record. Minor issues with the water manifolds and striplines were experienced early in NuMI. - Electrical breaks - Stripline hardware FNAL designed & fabricated electrical breaks have been used for several years without failure. Revised stripline fabrication to use higher quality, corrosion resistant hardware. Cory Crowley NBI 20149

Ancillary Components Belleville Spring Washers Zirconia Ceramic 6061-T6 Al Support Struts Crosshair placement and design will remain the same. - Horn 2 crosshairs might need to be upgraded to beryllium due to energy deposition and / or temperature & stress concerns Horn Crosshairs Spider Supports Cory Crowley NBI

Module mainframes and Stripline blocks require radiation labyrinths Necessary for dose rate reduction and technician protection while servicing Horn Support Structures The horn support structures will be the primary interface between the horns and all other systems. Target Chase Instrumentation Cooling Water Electrical Supply Shielding Blocks Cory Crowley NBI

Stripline block will be derived from NuMI / NOvA design. Will require replaceable fan or ductwork assembly to provide cooling air to enclosed conductors Horn Support Structures Cont. Horizontal adjustment mechanisms will allow fine tuning to the pitch of both horns. These will move the entire module with horns attached. Allows very ridged connection between horn and module mating points. Vertical adjustment mechanisms located on upstream and downstream end walls will allow yaw for both horns. Motor and reduction gearbox must drive a screw to complete this. Screw material will be primarily INVAR 36 for thermal stability. Cory Crowley NBI

Internal heating from beam energy deposition and heat absorption from internal shielding “T” Blocks will cause horn alignment problems if the module is left un-cooled. INVAR 36 vertical support rods are only meant to attenuate expansion. There will still need to be active cooling. This will certainly be a problem at 2.3 MW, and is believed to be a concern at 1.2 MW. Our current plan is to have modules cooled from the start of operation for any beam power. Understanding where support structure hot spots are is essential to determining module cooling panel & manifold placement. Module EDEP Must ensure minimal connections / welds, as each is a possible failure point. Modules are designed for the life of the facility, and need to built accordingly. Must consider possible hot handling work for repairs if needed. Cory Crowley NBI

It was understood early on that 1.2 MW operation of a NuMI / NOvA Horn 1 was a potential issue due to the existing design limits. - Temperature (Must stay below 100 C). - Fatigue life of inner conductor (Need to reach 30 million pulses or higher). Horn 1 Analysis Driving factors for operating temperature, stresses, and the resultant fatigue life are beam heating and resistive (joule) heating. - Beam energy deposition could not be lowered due to target design requirements. - Resistive heating from the NOvA power supply with a pulse width of 2.3ms would cause high temperatures and premature failure. It was thought (and later verified) that we would be able to keep horn current at 230kA, if we were able to reduce the current pulse width to 0.8ms. - Drawback is that new power supply is required. Cory Crowley NBI

The first step: - Find a conservative heat transfer coefficient for the horn analysis. Horn 1 Analysis Cont. Model spray pattern Build test assembly Apply results to analysis Discovered that additional cooling would be required for the outer conductor. Will need to increase flow rates from existing design to meet cooling needs. Cory Crowley NBI

Analysis was set up for both 120 GeV and 80 GeV operation, varying only energy deposition and cycle time. *Ang Lee and Zhijing Tang from FNAL Studied 4 scenarios: - Normal operation (beam & current pulse). - Test stand operation (current pulse only). - Horn off operation (beam pulse only). - Cyclic operation (normal running for 1 minute, horn off for 10 seconds & repeat). Horn 1 Analysis Cont. Pulse Parameters For 120 GeV Horn peak current, I (kA)230 Half-sine current pulse length, t (ms)0.8 Cycle time, T (s)1.2 Protons Per Spill7.5E+13 Pulse Parameters For 80 GeV Horn peak current, I (kA)230 Half-sine current pulse length, t (ms)0.8 Cycle time, T (s)0.9 Protons Per Spill7.5E s – 1.2s * Analysis work was performed independently, on 2 separate machines with 2 separate models to verify results. Cory Crowley NBI

fddfd Horn 1 Analysis Cont. Primary areas of concern: Largest temperature increase can be seen at neck region as expected. Steady state temperature of 59 C and maximum transient temperature of 75 C is acceptable. Aluminum creep becomes an issue at 100 C. Instantaneous temperature rise of 30 C creates the high alternating stress that is of concern for fatigue life. Cory Crowley NBI

Component stresses were evaluated, as was equivalent stress. Equivalent stress is the highest stress for all areas of concern, and therefore was used in the fatigue life calculation for a conservative analysis. Fatigue life was calculated with the Goodman Equation Horn 1 Analysis Cont. Assuming a 6061-T6 aluminum fatigue strength of 14KSI (from BPVC), and an ultimate strength of 45KSI, safety factors could be calculated. Calculated safety factors were then reduced due to: - Welded regions (cut S.F. by 50%) - Corrosion concerns (cut S.F. by another 25%) Cory Crowley NBI

Horn 1 Analysis Cont. 120 GeV operation will be the most demanding due to beam energy deposition. NuMI / NOvA style horns must keep pulse width as low as possible to reduce resistive heating while not creating high voltage problems. Minimum Safety Factor (S.F.) of 2.5 is acceptable with stringent quality control. Will continue to improve QA processes Cory Crowley NBI

Current NOvA power supply was designed to provide a pulse width of roughly 2.3ms with a maximum current of 240kA. Although it can provide sufficient horn current, the pulse width cannot be modified, and therefore a new supply is required for LBNF Horns. This is due to the excessive resistive heating caused by the long pulse width. - A current pulse longer than.8ms will reduce fatigue life of the horns to an unacceptable level. - Conversely, a shorter current pulse will introduce high voltage concerns. We still need to complete a high voltage potential test to at least 4kV Power Supply The existing design plan is to build a new power supply, with Horn 1 and 2 wired in series, which provides the following benefits: - Can use a single power supply - Requires a single set of controls - Peak current occurs at the same time for both horns. - Ensures identical current across horns. Building a new power supply is a calculated trade off as opposed to redesigning Horn 1. * Specific inquiries can be answered by Ken Bourkland, FNAL Cory Crowley NBI

Horn 1 stripline model has been generated and is currently being modified for analysis. Analysis will focus on operational temperatures & stresses, with a thorough vibration study using knowledge obtained from test stand pulsing of spare NOvA horn 1 (PH1-05). It is critical to understand stripline vibration at both 120 GeV and 80 GeV. Repetition rates are faster than NOvA and we have confirmed that not all frequencies have rung out even at the current rep rate of 1.33 seconds. Stripline Studies Stripline labyrinth is also a concern due to enclosed geometry. This must be cooled to sufficiently remove resistive heat, as well as radiated heat from energy deposition in the stripline block. The modules will be cooled, however the stripline block is not. We need to do an analysis to identify if thermal expansion will cause issues with the connection between the labyrinth stripline and the horn stripline. Cory Crowley NBI

Conductor model has been generated and is being prepared for analysis. The NuMI / NOvA Horn 2 is a very robust design, utilizing large conductor segments with large cross sectional areas. Resistive heating is not much of a concern on Horn 2. It is of primary concern what effects the beam energy deposition has on the inner & outer conductor. - Will the O.C. need to be thinned? - Could reduce wall thickness from 1” (25mm) to 3/4” (19mm) or 5/8” (16mm); similar to NOvA Horn 1. Additional Studies – Horn 2 Does it experience the same effects? Cooling profile and resistive heating is different which could be significant. What is the primary stress? Where is the primary stress? Must study same operating conditions as Horn 1 (120 GeV & 80 GeV). Stripline study will have to be replicated as well due to slight design differences from Horn 1. Cory Crowley NBI

Analysis shows that a NuMI / NOvA style horn 1 can successfully meet the operational requirements of the LBNF beamline for 1.2 MW. - We have a comfortable current limit of 230 kA, with a pulse width of 0.8ms. - Modified NuMI style graphite target design works well with the horn and does not produce unacceptable levels of beam energy deposition into the horn conductors. A thorough study is needed on the effects of a 1.2 second & 0.9 second repetition rate on the horn 1 and 2 stripline design. The horn 2 analysis will begin shorty and we do not anticipate any results that would indicate it needs to be significantly redesigned. We will wait to see if the outer conductor wall thickness needs to be reduced until all results are in. Horn support modules are progressing in design and are well defined at the conceptual level. Work will continue on preliminary design, primarily encompassing a temperature and deformation analysis to understand alignment issues, and modeling of utilities and supports to accept a 2.3 MW Horn 1. Conclusion ANY QUESTIONS? Cory Crowley NBI