9 Feb, 20041 MEG Software Status -for the coming review committee- Question from A.Blondel Our answer Schedule and Man power MEG Software Group.

Slides:



Advertisements
Similar presentations
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Advertisements

MEG-Review Feb MEG Software Group MEG Software Status Framework for MC, Schedule, DC reconstruction update and Discussion on a ROOT-based offline.
O. Stézowski IPN Lyon AGATA Week September 2003 Legnaro Data Analysis – Team #3 ROOT as a framework for AGATA.
A. Baldini PSI July 04 General Introduction Work done in the past 4 months presented in the individual sub-detectors talks: highlights Construction is.
Simulation / Reconstruction Working group Toby Burnett University of Washington Jan 2000 T.
Software parallel session summary MICE collaboration meeting INFN, Frascati 27/6-05.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
BESIII Offline Software Overview Weidong Li & Yajun Mao BESIII Collaboration Meeting, Beijing 12 January 2006.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
19 July 2005Fabrizio Cei1 Status and Perspectives of MEG software Fabrizio Cei INFN & University of Pisa On behalf of the MC/Offline group MEG Review Meeting.
06/15/2009CALICE TB review RPC DHCAL 1m 3 test software: daq, event building, event display, analysis and simulation Lei Xia.
Shuei MEG review meeting, 2 July MEG Software Status MEG Software Group Framework Large Prototype software updates Database ROME Monte Carlo.
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
PHENIX Simulation System 1 July 7, 1999 Simulation Progress and ROOT-in-PISA Charles Maguire Vanderbilt University July ‘99 Software Meeting.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
As of 28 Juni 2005Getting Starged with GEM - Shuei Yamada 1 Getting Started with GEM Shuei YAMADA ICEPP, University of Tokyo What is GEM? Before you start.
GlueX Software Status April 28, 2006 David Lawrence, JLab.
26 Jan, MEG Software Status Framework for MEG MC, Unification of LargePrototype/beam test, Schedule and DC reconstruction MEG Software Group.
The BESIII Offline Software Weidong Li Institute of High Energy Physics, Beijing Workshop on the cooperation of PRC-US in HEP 16 June 2006.
14 February 2007Fabrizio Cei1 INFN and University of Pisa PSI Review Meeting PSI, 14 February 2007 Status of MEG Software.
BESIII MC Release notes & planned development Dengzy, Hem, Liuhm, Youzy, Yuany Nov. 23, 2005.
SoLID simulation Zhiwen Zhao Uva SoLID Collaboration Meeting 2011/6/2 1.
5 May 98 1 Jürgen Knobloch Computing Planning for ATLAS ATLAS Software Week 5 May 1998 Jürgen Knobloch Slides also on:
R.T. Jones, Newport News, May The GlueX Simulation Framework GEANT4 Tutorial Workshop Newport News, May 22-26, 2006 R.T. Jones, UConn Monte Carlo.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
24/06/03 ATLAS WeekAlexandre Solodkov1 Status of TileCal software.
RICH SIMULATION USING GEANT4 S.EASO, RAL OBJECTIVES OF THE SIMULATION. CURRENT STATUS AND PLANS. INTEGRATION WITH LHCb SOFTWARE. SUMMARY.
Heather Kelly PPA Scientific Computing Apps LAT was launched as part of the Fermi Gamma-ray Space Telescope on June 11 th 2008.
Detector Simulation Presentation # 3 Nafisa Tasneem CHEP,KNU  How to do HEP experiment  What is detector simulation?
20 September 2005Fabrizio Cei1 Status and Perspectives of MEG Software Fabrizio Cei INFN & University of Pisa INFN Scientific Committee I Napoli, 20 September.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
1 NaI calibrationneutron observation NaI calibration and neutron observation during the charge exchange experiment 1.Improving the NaI energy resolution.
Particle Identification at BESIII Kanglin He April 23, 2007, Amsterdam.
SoLID simulation Zhiwen Zhao UVa 2011/03/25 1. GEMC, written by Maurizio Ungaro, used for CLAS12 2.
27 June 2006 Shuei YAMADA, MEG PSI 1 MEG Software Status and Prospects MEG Software group.
Overview of the experiment Collaboration (about 30 physicists at this meeting) Budget Realistic schedule and general status (few words) of each sub-detector.
Mokka, main guidelines and future P. Mora de Freitas Laboratoire Leprince-Ringuet Ecole polytechnique - France Linear collider Workshop 2004, Paris.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
PMT Calibration R.Sawada 7/Jan/2007. Time calibration Method was talked at the previous meeting. The problems which was shown before were because I used.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
TOF Reconstruction, Calibration & Test-beam Simulation Jiang Linli 2005/6/1 (13th BES Annual Meeting )
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Detector SimOOlation activities in ATLAS A.Dell’Acqua CERN-EP/ATC May 19th, 1999.
Proposal for the MEG Offline System Assisi 9/21/2004Corrado Gatto General Architecture Computing Model Organization & Responsibilities Milestones.
M. Brooks, 28-Mar-02 Heavy/Light meeting 1 Muon Analysis Work Getting Code ready for first data pass - DONE Get ready for second pass on DSTs - muon identification.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
Peter Križan, Ljubljana Dec 7, 2007 Mini WS, SLAC Peter Križan University of Ljubljana and J. Stefan Institute Simulations for SuperBelle SuperB computing.
BES III Software: Beta Release Plan Weidong Li 19 th October 2005.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, MEG Collaboration meeting Feb. 10th, 2004.
Alex Howard, Imperial College Slide 1 July 2 nd 2001 Underground Project UNDERGROUND PROJECT – Overview and Goals Alex Howard Imperial College, London.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
MAUS Status and Plans Chris Rogers, ASTeC, Rutherford Appleton Laboratory.
Migration of reconstruction and analysis software to C++
Software development status in Rome
Stress tests for CLAS12 software
Liquid Xenon Detector for the MEG Experiment
SoLID Simulation Zhiwen Zhao 2016/08/27.
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
Muon Group Software Report
Trigger operation during 2007 run
Presentation transcript:

9 Feb, MEG Software Status -for the coming review committee- Question from A.Blondel Our answer Schedule and Man power MEG Software Group

9 Feb, Question from A.Blondel Give a common goal to be achieved by the next review; “I have appreciated the presentation of the offline software team, with a team leader etc... As promised I come forth with the question: could you give us -- and yourself -- a common goal to be achieved with that software in time for the next review?”

9 Feb, The Answer MC unified framework –With double option: Tokyo or Pisa –Test on reduced number of PMTs Large Prototype MC unification –CEX beam test –Same offline package for DATA & MC Event Display –Initially GEANT3

9 Feb, MC Framework - the MC unified framework (with the double option: Tokyo or Pisa) of the final detector should be ready (or almost ready) for the next meeting at PSI; therefore, the test on reduced number of PMTs could be done in the separate programs and in the unified framework as check;

9 Feb, MC Framework for MEG(1) Unified framework with double option: –Tokyo or Pisa code, Framework based on: –Fortran 77, –CERNLIB, –ZEBRA, –GEANT3, Distributed via CVS.

9 Feb, MC Framework for MEG(2) Tree structure & skeleton … ready; Materials & tracking medium … merged; Event generator … stand alone & built-in; DC, TC, Magnet and B field … merged; ZEBRA structure … in progress; Scintillation photon tracking … in progress.

9 Feb, To be done: MEG MC Merge Liq. Xe Geometry; Test w/ reduced number of PMT in Liq. Xe; Digitization for all the sub detectors; Full reconstruction program; Offline database… ODB? Separate database (e.g.PostgreSQL, MySQL, etc.)?

9 Feb, Lproto CEX beam test - the same work will be done for the Large Prototype MC, probably in time for the October beam test; the Large Prototype data and MC will be analyzed with the same offline package;

9 Feb, LProto CEX beam test MC merge into the new framework … just finished. –Common output format for DATA/MC; –Scintillation photon tracking in Liq. Xe … Full ray tracing or geometrical tracking; –Reflection on the PMT quartz window … Fresnel or total reflection; –Scintillation light spectrum … Monochromatic, Gaussian, Basov et.al, etc. –Rayleigh scattering/absorption in Liq. Xe.

9 Feb, To be done: beam test NaI response simulation; LiH target and Vessel simulation; Phase space simulation for  0 ; Offline database … ODB? Separate database (e.g. PostgreSQL, MySQL, etc.)?

9 Feb, Event Display - the MC event display in the unified framework will be written by using GEANT3, while for the general event display (useful for on-line also) the final decision will be taken later.

9 Feb, Schedule & Man Power (1) Present a realistic schedule by the review committee –By when will each sub detector part be ready? e.g. Is the DC simulation ready by the coming DC beam test? –Assignment?

9 Feb, Schedule & Man Power (2) Liq Xe … G.Signorelli, S.Yamada Drift Chamber … F.Cei, H.Nishiguchi Timing Counter … P.Cattaneo Target/Beam … P.-R. Kettle Magnet … W.Ootani Trigger … D.Nicolo