Nilam Cyclone – Southern Region Grid operation. Nilam Cyclone Forecast.

Slides:



Advertisements
Similar presentations
A 90 Day Plan. Product Volume =2000PV Makes You a Director 500 PV 3 & PV You 250 You PV.
Advertisements

Space Weather & EU-FP7 Meeting
Frankfurt (Germany), 6-9 June 2011 The Test and Installation of Medium Class(22.9kV) Hybrid type Fault Current Limiter in KEPCO Grid Wonjoon Choe Jungwook.
North Mankato Load Serving study Xcel Energy Great River Energy.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
DC-DC Converters (choppers) The objective is to convert a fixed DC voltage to a variable DC voltage It is possible to step up and step down voltage.
ETA and GFS Validation (Southeastern Mexico) John M. Dickens RSIS/CPC.
Harmonic Distortion on the CHESF Transmission Grid Caused by: –TV Receivers) Harmonic Distortion Measurements - 230kV Substation - During World Cup Soccer.
Norman W. Garrick Transportation Forecasting What is it? Transportation Forecasting is used to estimate the number of travelers or vehicles that will use.
02/08/2015Regional Writing Centre2 02/08/2015Regional Writing Centre3.
© ABB Group August 7, 2015 | Slide 1 Variable Shunt Reactors Optimize Transmission Systems Dr. Claes Bengtsson, Global Product Manager, Reactors. PowerGen.
Solution MGMT E st Quarter Forecast for the Fourth Year.
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
Module on Computation of PoC Transmission Charges
Electricity and the Grid SPH4C. Power Recall that the power delivered to a circuit or consumed by a load is:
Measuring the Current and Voltage of a 820 Ω Resistor Setting for Multimeter = 200 mA DC Measure Voltage in 2 V increments up to 20 V.
Khoo Yihan | Chua Cong Yang | Park Seong Jin.  Electricity is generated in power stations at 11000V to 33000V and then stepped up to V by transformers.
Light Sources Input IEC delegation to GRE to OVIG, 19,20 June 2007 GRE-OVIG-Working Paper No (1 st session of the GRE Informal Group on Operating.
Jeopardy Maps Continents and Oceans Place Characteristics RegionsSources Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
Year-Round Air Quality Forecasting -- Outreach Plan Debbie Stackhouse EPA Office of Air Quality Planning and Standards
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
Tecport E beam Evaporator Evaporated thin films Process parameters.
Transportation Investment Act: HENRY COUNTY PROJECTS Atlanta Regional Commission Board Meeting March 28, 2012 Chairman Elizabeth “B.J.” Mathis Henry County.
Scatter plot of minimum pressure and maximum azimuthal wind for Atlantic and Eastern Pacific tropical cyclones ( Hurricane Isaac 2012 [red]).
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
© Oxford University Press 2011 IP The National Grid: Power transmitted The National Grid: Power transmitted.
Overall National Grid Development: Constraints & Options
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
Aug, 2005 THE US BLACKOUT AUGUST 14, Aug, 2005 NORTH AMERICAN GRID INTER-CONNECTS THE INDIAN GRID AT PRESENT IS ALSO SIMILAR WITH THE SOUTHERN REGION.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
13 th ALADIN Workshop, Prague, November 24 th -28 th Coupling frequencies in ALADIN/Hrn8 domain Stjepan Ivatek-Šahdan Meteorological and Hydrological.
1 The Asian-Australian Monsoon System: Recent Evolution, Current Status and Prediction Update prepared by Climate Prediction Center / NCEP November 12,
Fasten your seatbelts we ’ re off on a cross country road trip!
NATIONAL CHILDREN SCIENCE CONGRESS ACADEMIC COMMITTEE.
END GAME Sample Game Ask.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Which network parameters are interesting
Modular Multilevel Converter for Wind Energy Storage Systems
Director, Transmission Services
AgeLOC TR90 LTO.
RfG Implementation Fault Ride Through
The World Cup Soccer and Harmonic Distortion Paulo F Ribeiro
Burst Test Test-Bed LHC120A-10V 4 Quadrant Converter: Burst Tests
Presented by: paul konz, P.E. jeff martin jonathan belanger
INITIAL ENVIRONMENT ASSESSMENT REPORT (IEAR)
Computer simulations: the virtual physics laboratory
BEPCII RF POWER SOURCE AND INPUT COUPLER
Power Recall that the power delivered to a circuit or consumed by a load is:
SMART TRANSMISSION GRID 1. Smart Transmission System Wide application of HVDC/ FACTS Wide Area Monitoring & Protection New Technologies: Substation Automation.
Experiences from Major Smart Grid Demonstrators
A Trip To Atlanta Georgia
POWER GRID INTERCONNECTIONS IN CHINA
500 nm WRITE VOLTAGE 0 V.
Tropical cyclones movement
Plans for the LHC BGI simulations
October 2014 Star Data Prior to the C.A.F.E. Reading Initiative these were the results attained.
APPLICATION OF ROTO PUMPS IN
TWU Curatio Club September 16th & 17th 2015
Physics – 3/17/16 Discuss snap circuits
SOCIAL STUDIES UNIT #1 Political and Physical Regions of Canada
Specials Calendar- Group A
Specials Calendar- Group B
Calculus M 31 October 2011.
Middle School Advanced Band All High School Bands
Presentation transcript:

Nilam Cyclone – Southern Region Grid operation

Nilam Cyclone Forecast

SR Grid Condition: on 31 st October 2012 at 09:09 Hrs

SR Grid Condition: on 31 st October 2012 at 17:09 Hrs All reactors taken into service to control over voltage, even voltages are High

on 31 st October 2012 at 18:04 Hrs 220kV Lines at ETPS and Kilpauk tripped and 220kV lines at Siruseri and KITS park also tripped

on 31 st October 2012 at 18:04 Hrs 400kV Vijayawada-Nellore-2 and 400kV Nellore-Almatti DC line tripped on over voltage

on 31 st October 2012 at 19:51 Hrs 400kV Chittur-Sriperumbudur Tripped on Over voltage