Christopher Melson Department of Civil and Architectural Engineering University of Wyoming
Jesse Creel Penstock Design Rebecca Miller Powerhouse Layout Justin Stark Intake Structure Design Fred Ogden, Ph.D., P.E., P.H. Project Mentor Murray Schroeder, P.E., WWC Engineering
Problem Description Select an appropriate location in Wyoming for a small-scale hydropower plant Site Selection Site Considerations ⟡ Water Rights ⟡ Environmental Impacts ⟡ Historical and Cultural Issues ⟡ Construction Considerations
Design Elements ⟡ Intake Structure ⟡ Penstock ⟡ Turbine/Generator ⟡ Powerhouse ⟡ Tailrace Economic Analysis
Selection Criteria ⟡ Net available head ⟡ Flow rate ⟡ Length of penstock ⟡ Land use and accessibility ⟡ Distance to substation
Old Lingle Power Plant ⟡ Pros: Existing infrastructure Near substation Located on D.O.E. land Short penstock Predictable flow ⟡ Cons: Water rights issues Demolition costs
Old Lingle Power Plant ⟡ Constructed in the early 1920’s ⟡ Decommissioned in April 1956 Ft. Laramie Canal ⟡ Currently used for irrigation ⟡ Trapezoidal earth channel ⟡ 1470 cfs maximum capacity ⟡ Water diverted from North Platte River via Whalen Diversion Dam
(Source: Bureau of Reclamation)
(Source: Google Earth)
Original permit allocated 150 cfs After decommissioning, associated water rights converted from power to irrigation purposes Proposal ⟡ Present design to Goshen Irrigation District ⟡ Use original permitted flow rate ⟡ 10 month operating period
Water Rights ⟡ 150 cfs flow rate Topography ⟡ 105 ft of head ⟡ 832 ft penstock
Front View
Plan View
Icing concerns ⟡ Plastic coating on steel surfaces Side View
4.25 ft inner diameter ⟡ Bureau of Reclamation chart 0.5 in wall thickness ⟡ 3 equations solved simultaneously ⟡ Originally inches, changed for water hammer protection Water Hammer ⟡ More economical to increase wall thickness than to build surge tank 4.33 ft of head loss ⟡ Darcy-Weisbach
Saddle Support System ⟡ Soil bearing analysis Saddle spacing ⟡ Visual Analysis ⟡ Spacing determined by deflection < 0.2 in
Turbine Selection ⟡ Small Francis spiral turbine ⟡ Specific speed: rpm ⟡ Runner diameter: 4.5 ft Plant Configuration ⟡ Horizontal turbine arrangement ⟡ Directly coupled three-phase synchronous generator (Source: Tridentes Energy)
Floor Plan
South Perspective
Southeast Elevation
Feasibility dependent on: ⟡ D.O.E. Grant ⟡ 10 month operating cycle Profitability increases if: ⟡ Price of green energy increases ⟡ Operating period increases to 12 months
Questions?