23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.

Slides:



Advertisements
Similar presentations
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Advertisements

ISIS Beam Protection System and MICE operation. Dean Adams 29 Nov 07 Presented by Chris Rogers.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
The TIMING System … …as used in the PS accelerators.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
Beam tolerance to RF faults & consequences on RF specifications Frédéric Bouly MAX 1 st Design Review WP1 - Task 1.2 Bruxelles, Belgium Monday, 12 th November.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
The Stripping Foil Test Stand in the Linac4 Transfer Line
L4T Bending Power Converters: ‘ Implications of monitoring the current to 5% and 0.5%’ L4 BCC - 10 Nov 2011 David Nisbet TEEPC.
Present Uses of the Fermilab Digital Signal Receiver VXI Module Brian Chase,Paul Joireman, Philip Varghese RF Embedded Systems (LLRF) Group.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
LLRF FOR CHOPPER Grégoire Hagmann Philippe Baudrenghien BE/RF/FB February 24th, 2013.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
5 June 2002DAQ System Engineering Requirements 1 DAQ System Requirements DOM Main Board Engineering Requirements Review David Nygren.
BLM “sunglasses” Filter Box. Current layout: BLM crates CIBU units Rack BY02 / SR8 BIC crate ( UA83 ) User_Permits Maskable channel Unmaskable channel.
Stéphane Gabourin on behalf of TE/MPE-EP MPP Linac4 – 9 th July 2015 BIS installation in Linac4 For 50 MeV operation.
NML Machine Protection System (MPS) Arden Warner Fermilab August 2 nd, 2007.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
CERN Andrea Apollonio page 1 MACHINE PROTECTION CONSIDERATIONS FOR 50 MeV LINAC4 BIS COMMISSIONING A.Apollonio, B. Mikulec, C. Martin, B. Puccio, F. Roncarolo,
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009.
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ BIS: Beam Interlock.
Design process of the Interlock Systems Patrice Nouvel - CERN / Institut National Polytechnique de Toulouse CLIC Workshop Accelerator / Parameters.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
RF acceleration and transverse damper systems
The TV Beam Observation system - BTV
Overview of the Beam Interlock System
Review of the Machine Protection System in the PS complex
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Injectors BLM system: PS Ring installation at EYETS
LINAC4 50 MeV phase BIS STATUS
Injection BIS – next iteration
BE-BI Software for LINAC4
Commissioning and Testing the LHC Beam Interlock System
LHC BLM system: system overview
PSB Injection scheme in the Linac 4 era
Interlocking of CNGS (and other high intensity beams) at the SPS
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
Beam Current Monitoring with ICT and BPM Electronics
Beam Interlocks for Detectors and Movable Devices
The LHC Beam Interlock System
Interlocking strategy
Presentation transcript:

23/06/2011 Linac4 BCC meeting

23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed predefined thresholds, depending on which user is being executed. At Linac2  Software Interlock System (SIS) solution 1 FESA class providing the persistent configuration registry for some parameters (thresholds, counter, status, tolerance ranges for the BCTs or the power supplies) + 2 hardware connections to the Interlock crate of LINAC 2.  The interlock crate disables (by HW) the timings for pulsing the source of LINAC 2 in case of raised interlock condition.  A keep-alive pulse is generated by SIS at every cycle to ensure that the SIS and FESA are up and running (SW action that the FESA class turns into timing pulse to the interlock chassis)  PPM counter linked to PSB timing

23/06/2011 Linac4 BCC meeting Linac2 SIS flowchart

23/06/2011 Linac4 BCC meeting The Linac4 Watchdog acts via the Beam Interlock System – EDMS Foreseen to be a maskable User Input of the BICs and can thus be disabled by the operators for particular operating scenarios B Mikulec, B.Puccio

23/06/2011 Linac4 BCC meeting Four parallel implementations (BIS design compatibility) are proposed: 1.Low-energy WD 2.Linac4 and LT line WD 3.LT-LTB-BI lines and LBE/LBS WD 4.PSB injection WD L4DUMP LBE PSB LBS a) Losses in the chopper cannot be covered (thresholds would have to depend on the chopping pattern used) all BCTs upstream of LT.BHZ20  Linac4 frontend b) Readout: all BCTs downstream of LT.BHZ20  BOR frontend

23/06/2011 Linac4 BCC meeting 1) Low energy Compares : L4L.BCT.1183 & L4L.BCT.3113 for all beam destinations Input to Master BIC ‘Source- RF’ 2) Linac4 and LT line Compares : a. L4L.BCT.4013 & L4Z.BCT.0117 (if dest=L4DUMP) b. L4L.BCT.4013 & LT.BCT30 (if dest = LBE,LBS,PSB) Input to BIC ‘Linac4 and Linac4 Transfer OK’

23/06/2011 Linac4 BCC meeting 3) LT/LTB and LBE/LBS/BI line watchdog Compares: L4T.BCT.1617 & BI.BCT10 if dest=PSB L4T.BCT.1617 & LBE.BCT65 if dest=LBE L4T.BCT.1617 & LBS.BCT64 if dest=LBS (slit?) Input to BIC ‘Linac4 and Linac4 Transfer OK’ 4) PSB injection Compares: BI(1:4).BCT20 & intermediate bandwidth transformer in section 8L1 (4, ring by ring) Compares the sum of the 4 BI transformers with the sum of the 4 ring transformers (value taken after 100 turns) user per user. Input to BIC ‘PSB OK(1)’

23/06/2011 Linac4 BCC meeting Function: cut the beam if excessive losses are measured 1.on a user-by-user basis 2.after a certain number (set by the operators) of ‘bad’ pulses have been recorded FESA class receives information from the PSB telegram about which timing user (and destination) is being executed. For each user, a Bad-Pulse-Counter is initialized to a maximum value and incremented/decremented if at every subsequent pulse according to whether this is good/bad. When the Bad-Pulse-Counter=0 the watchdog triggers the interlock to cut the beam. A manual reset is needed (on a user-per-user basis) to restart operation. On the basis of recent studies on beam induced damage scenarios ( C Maglioni, BCC#25 ), the baseline assumed is that the watchdog should be able to react within 1 second (i.e. cutting the next pulse at 1Hz repetition rate after the detection of substantial losses in the machine)  Rules out purely SW-based solution a` la Linac2. C Maglioni, BCC#25

23/06/2011 Linac4 BCC meeting HardwareSoftware BCTs equipped with TRICs (TRansformer Integrator Card) for signal integration and ADC sampling FESA-class super-structure for added functionality registry of: user and destination thresholds information BadPulseCounter update BCT readings comparison Sensitivity 3 V = 100 mA Maximimum intensity 100 mA Accuracy, (Imin = 10 mA Imax= 100 mA) 1% rms Precision, (fixed calibration) < 0.5% rms Thermal sensitivity < 300 ppm / ⁰C High frequency cutoff 7.8 MHz Low frequency cutoff 0.7 Hz Minimum pulse length (with an error < 1%) 100/200 ns Maximum pulse length (with an error < 1%) 1 ms Resolution (TRIC card) 5  A Maximum noise < 1  A rms Maximum noise for a gate of 1 ms (lower for narrower gate) < 5 E9

23/06/2011 Linac4 BCC meeting a.WD card provides an electrical interface to the CIBU modules b.Hardware and software are in the same front-end (unlike Linac2) to reduce potential failure

23/06/2011 Linac4 BCC meeting If counter ≠0 for the user to be executed, the FESA class activates in the WD card a “watchdog timing window” that enables beam permit over ~2ms Beam permit is disabled outside the WD timing window During the WD timing window, beam intensities are acquired from the TRIC cards and compared to WD thresholds- BadPulseCounter is updated  BIC effectively re-armed at every pulse

23/06/2011 Linac4 BCC meeting A minimum intensity threshold should be implemented to avoid taking into account pulses with no beam (or triggering on noise). Current integration should be carried out as close as possible to the detector to avoid signal deterioration. Redundancy needs to be built in the system and solutions sought to ensure fail- safe operation in case of failure scenarios and communication breakdowns. Duplicated inputs to the CIBU user interface per watchdog. Keep-alive pulse coming from the SIS software should be generated at every cycle to ensure that FESA SW is up and running. If SW is not alive, no WD timing window is issued. Operator needs to manually reset the watchdog (on a user-per-user basis) to restart operation. WD architecture here presented matches currently proposed solution for the Linac4 BIS. Any changes to the latter will probably require modifications to the WD scheme shown...