KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,

Slides:



Advertisements
Similar presentations
Selection and performance of PMT candidates for TREND ground array Hou Yueyun 1, Feng Zhaoyang 1, Liu Cheng 1 , Liu Maoyuan 1 1, IHEP 2, Tibet University.
Advertisements

Calibration for LHAASO_WFCTA Yong Zhang, LL Ma on behalf of the LHAASO collaboration 32 nd International Cosmic Ray Conference, Beijing 2011.
The Pierre-Auger PMT Test Stand Chris Jillings Feb 6, 2002.
EML 2023 – Motor Control Lecture 4 – DAQ and Motor Controller.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Investigation for Readout Electronics of WAC in LHAASO Shubin Liu University of Science & Technology of China April 22nd, 2009.
The UC Simulation of Picosecond Detectors Pico-Sec Timing Hardware Workshop November 18, 2005 Timothy Credo.
P. Karchin – PMTs for Scintillator Based Muon Systempage 11/7/2004 January 7, 2004 American Linear Collider Physics Group 2004 Workshop Stanford Linear.
Time over Threshold Electronics for Neutrino Telescopy George Bourlis + multiplicity.
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Characterization of Silicon Photomultipliers for beam loss monitors Lee Liverpool University weekly meeting.
Catania VLVnT09 Athens, Greece 1/14 Catania Performances of four super bialkali large area photomultipliers with respect to.
Servo Motor Control Demonstration.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
Servo Motor Control Demonstration. EML 2023 Department of Mechanical and Aerospace Engineering motor with gear reducer flex coupling incremental optical.
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
Data acquisition techniques and development of testing equipment for the JLab Hall C 12 GeV kaon aerogel detector Nathaniel Hlavin, Mike Metz VSL Presentation.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
July 29, 2004 American Linear Collider Physics Group Victoria Linear Collider Workshop Muon Detector MAPMT Tests - Calibration R&D Scintillator Based Muon.
U. Akgun, HCAL Fall Meeting, 11/11/2004, Fermilab, IL HF PMT ISSUES By Ugur Akgun The University of Iowa.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
Design and optimization of Electromagnetic particle Detectors (EDs) in LHAASO-KM2A Xiangdong Sheng, Jia Liu, Jing Zhao on behalf of the LHAASO collaboration.
July 4, 2008 SuperBelle Meeting, KEKPeter Križan, Ljubljana Peter Križan University of Ljubljana and J. Stefan Institute Burle MCP PMTs as photon detector.
RENO PMT TEST  PMT type DAQ setup Single Photon Electron Resolution Dark Current After Pulse Ratio with two methods  Summary Kyung Ju Ma, Oct.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
PMT Readout and Floor Triggering Charge estimation using the times over the thresholds Event Building and Triggering + multiplicity George Bourlis.
AMY Meeting. 21 Mar 2011 what is new? Auger Lecce Meeting,
Status of the ETL 9125FLB Photomultiplier Tubes Steve Bache UNC-Wilmington.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
LENA Photosensor R&D Marc Tippmann Lothar Oberauer, Michael Wurm, Gyorgy Korga, Quirin Meindl, Michael Nöbauer, Thurid Mannel, Martin Zeitlmair, German.
Design for Wide FOV Cherenkov telescope upgrading THE 2 nd WORKSHOP OF IHEP Shoushan Zhang Institute of High Energy Physics.
Catania 11 ICATPP october, 2009 Como 1/12 Catania Comparative measurements of the performances of four super bialkali large.
G. Tzanakos, MINERvA Collaboration Meeting, Jan 14, Goal: Build a Test Stand that can test and characterize 10 PMTs. Assumptions about MINERvA Electronics:
Production PMT Testing and Work on Site with Prototype Tank University of California, Los Angles Department of Physics and Astronomy
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA CMS HCAL at Fermilab Feb 6-8, 2003.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA HF-RBX PRR CERN Apr 3-4, 2003.
PMT Tests for HF Upgrade Ugur Akgun. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Iowa PMT Test Station Ugur Akgun 1. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA CMS Meeting, CERN, Dec 1-8,2001.
Characterization of Hamamatsu R12199 PMTs Oleg Kalekin KM3NeT Meeting CPPM, Marseille
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
The photomultiplier tubes selection for KM2A electromagnetic particle detectors (EDs) hou chao IHEP The 2nd workshop of air shower detection at high altitudes.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
 13 Readout Electronics A First Look 28-Jan-2004.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA HF-RBX PRR CERN Apr 3-4, 2003.
The dynamic range extension system for the LHAASO-WCDA experiment
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Alternative FEE electronics for FIT.
LHAASO Electronics developments
LHAASO-WCDA: Design & Performance
Rafael Ballabriga Suñé Xavier Xirgu Aleixandre
A First Look J. Pilcher 12-Mar-2004
Hellenic Open University
Instrumentation for Colliding Beam Physics 2017
Department of Physics and Astronomy,
The New Readout Electronics for the SLAC Focusing DIRC Prototype (SLAC experiment T-492 ) L. L. Ruckman, G. S. Varner Instrumentation Development Laboratory.
On behalf of CEPC calorimeter working group
Development of hybrid photomultiplier for Hyper-Kamiokande
Presentation transcript:

KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing, 17~19, Feb. 2011

Outline 2011/2/182 The 2nd workshop of air shower detection at high altitudes  LHAASO KM2A PMT  PMT testing scheme and instrument  Primary testing results  Summary

LHAASO KM2A PMT KM2A detector unit: – Each detector unit consist of 16 plastic tiles and one PMT. – PMT couple to plastic tiles by around 100 optical fibers. – Dynamical range: 1~3000 charge particles – Total 5,000 units, means 5,000 PMTs Characteristics of PMT for KM2A anode linearity range: ~100mA within 5% spatial uniformity: <10% in the center region of the window TTS(transit time spread): ~1ns Low noise Gain: /2/18 The 2nd workshop of air shower detection at high altitudes 3

4 Schematic diagram of the testing system PC WinXP+Labview VME HV SY1527 dark box QDCLTDscale Pulse generator Diffusion filter LED1 ps pulse laser amp Aging box1 Aging box2 Aging box3 LED Digital motor fan in/out 15 PMTs LED2 Oscilloscope The whole system is controlled by the central compute

Instrument VME DAQ system HV power supply SY channel output Scanning & testing dark box scan 16 PMTs simultaneously Pulse generator 8 output channels Oscilloscope band width: 500MHz Picosecond pulse laser, LED driver 2011/2/18 The 2nd workshop of air shower detection at high altitudes 5

Control panel Developed with LabView Main panel Function panel DAQ(VME control) Pulse generator HV power supply Scan motor Oscilloscope 2011/2/18 The 2nd workshop of air shower detection at high altitudes 6

Linearity measurement  Two LEDs used: LED1, LED2 – LED driver amplitude: 0~20V – LED driver width: 20ns – LED driver triggered by pulse generator  LED1 and 2 light alternately and together  linearity=[I led1+led2 -(I led1 +I led2 )]/I led1+led2 *100% 2011/2/18 The 2nd workshop of air shower detection at high altitudes 7

Uniformity measurement Optical fiber scan the PMT window in 2D. – Step pace:1mm – Control by digital motor Central computer communicate with digital motor, LED driver and DAQ system 2011/2/18 The 2nd workshop of air shower detection at high altitudes 8

Rise time, TTS Light source : picosecond pulsed light (laser diode) trigger by the generator Width: ~100ps Oscilloscope used to measure the rise time, TTS The measurement results are read to central PC with ethernet. One channel input the trigger. 3 channels for PMTs signal. rise time read from oscilloscope directly TTS(transit time spread): Read the PMT signal and laser trigger signal wave shape Transit time=T signal- T trigger -T delay 2011/2/18 The 2nd workshop of air shower detection at high altitudes 9

Gain & Single photoelectron peak Gain – XP2622 – HV: V Single photoelectron peak – XP2622 – HV: 1800V 2011/2/18 The 2nd workshop of air shower detection at high altitudes 10

Summary The PMT testing platform almost ready The platform is easy to use – One push, all results will automatic present Except the oscilloscope, need switch manually. The platform is speedy – One batch 15 PMTs, testing simultaneously – One or two batch per day. – One year or half year will finish all 5,000 tubes. 2011/2/18 The 2nd workshop of air shower detection at high altitudes 11

2011/2/18 The 2nd workshop of air shower detection at high altitudes 12 Thanks for your attention!