FF Stabilisation A.Jeremie (Summary of things learned and work done at LAPP, CERN, SYMME, Oxford, SLAC)

Slides:



Advertisements
Similar presentations
FINAL FOCUS: COMBINATION OF PRE ISOLATOR AND ACTIVE STABILISATION K. Artoos, C. Collette, R. Leuxe, C.Eymin, P. Fernandez, S. Janssens * The research leading.
Advertisements

Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
CLIC stabilisation contribution A.Jeremie, B.Caron, A.Badel, R.LeBreton, J.Lottin, G.Balik, J.P.Baud, L.Brunetti, G.Deleglise, S.Vilalte.
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Impact of random and determinist acoustic noise on vibrations at high frequencies.
SIMPLIFIED MODELS OF ILD AND SID DETECTORS: SIMULATIONS AND SCALED TEST ULB: Christophe Collette, David Tschilumba, Lionel SLAC: Marco.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
Benoit BOLZON Nanobeam 2005 – Kyoto Active mechanical stabilisation LAViSta Laboratories in Annecy working on Vibration Stabilisation Catherine ADLOFF.
Stabilization of the FF quads A.Jeremie B.Bolzon, L.Brunetti, G.Deleglise, N.Geffroy A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
Vibration Stabilization Experimental Results CLIC Main Beam and Final Focus Magnet Stabilization A.Jeremie LAPP: A.Jeremie, S.Vilalte, J.Allibe, G.Balik,
QD0 stabilisation update (since last update in MDI) A.Jeremie A.Badel, B.Caron, R.LeBreton, J.Lottin, J.Allibe, G.Balik, J.P.Baud, L.Brunetti, G.Deleglise.
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Catherine ADLOFF Andrea JEREMIE Jacques LOTTIN Benoît BOLZON Yannis KARYOTAKIS.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
ATF2 week meeting: Impact of cooling water on the final doublets vibrations Benoît BOLZON Laboratories in Annecy working on Vibration Stabilization 15/10/08.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Techniques to approach the requirements of CLIC stability K. Artoos, O. Capatina (speaker), M. Guinchard, C. Hauviller, F. Lackner, H. Schmickler, D. Schulte.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
Machine Detector Interface Lau Gatignon / CERN-EN.
Our way to the CLIC CDR 1.Definition of CDR and TDR 2.CLIC feasibility items 3.Organization of technical preparation - CTC (=CLIC technical committee)
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
Tue 31 Mar :50 (CEST) 13:50 UTC CLIC stabilisation day 5 - LAPP OXFORD MONALISA 1 Options for interferometric monitoring of CLIC test magnet M.
CLIC QD0 Stabilization J. Allibe 1, L. Brunetti 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2,C.Hernandez 2 1 : LAPP-IN2P3-CNRS,
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
CLIC MDI stabilization update A.Jeremie G.Balik, B.Bolzon, L.Brunetti, G.Deleglise A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
STABILIZATION ACHIEVEMENTS AND PLANS FOR TDR PHASE CLIC MAIN BEAM QUADRUPOLE MECHANICAL STABILIZATION K. Artoos, C. Collette, P. Fernandez Carmona, M.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Draft MDI Action plan Presented by Lau Gatignon 25 September 2009.
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
Update of a ground motion generator to study the stabilisation usefulness of ATF2 final focus quadrupoles 1 Benoît BOLZON B. Bolzon, A. Jeremie (LAPP)
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
CARE / ELAN / EUROTeV Feedback Loop on a large scale quadrupole prototype Laurent Brunetti* Jacques Lottin**
1 FP7 LED Potential program to develop inertial sensors Explore potential to achieve 0.1nm stability scale for the FD above a few Herz A.Jeremie, C.Hauviller.
CARE / ELAN / EUROTeV Active stabilization of a mechanical structure Laurent BRUNETTI LAViSta Team LAPP-IN2P3-CNRS,
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
How high frequency we care if we need the stabilization of 1nm level?
PROGRESS ON THE CLIC MBQ STABILIZATION R&D K. Artoos, C. Collette **, M. Esposito, P. Fernandez Carmona, M. Guinchard, S. Janssens*, R. Leuxe, R. Morón.
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Possible technical implementation, R&D program until 2010 C. Hauviller CERN Feasibility item 6: Main Linac active alignment/beam based feedback/stabilization.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Our way to the CLIC CDR 1.Basic Concepts of the CLIC CDR Present layout of the CDR chapters 2.Possible Time Scale 3.Organization of technical preparation.
STABILISATION AND PRECISION POINTING QUADRUPOLE MAGNETS IN THE COMPACT LINEAR COLLIDER S. Janssens, P. Fernandez Carmona, K. Artoos, C. Collette, M. Guinchard.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
Beam Physics Issues of Main Beam Stabilisation A.Jeremie (LAPP) C.Hauviller (CERN)
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
FP7: EuCARD after a year of preparation… A.Jeremie.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
QD0 Stabilisation L. Brunetti 1, J. Allibe 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, A. Badel 2, R. Le Breton.
CARE05 – November Status report on active stabilisation of a linear collider final focus quadrupole mock-up J. Lottin, ESIA
Alignment and stability session
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Machine Detector Interface
Summary FD Support System
Vibration issues at Linear Colliders:
Active isolation Target : a low cost dedicated table
EuroTeV WP7 activities in DESY
3: ISI ASCR, Brno University of Technology, Brno, Czech Republic
Topics on Vibration Issues
Laboratories in Annecy working on Vibration Stabilization
ATF2: final doublet support
FP7 LED A.Jeremie, L.Brunetti, N.Geffroy.
A.Jeremie Some drawings from different CLIC’08 presentations
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
A.Jeremie, B.Bolzon, N.Geffroy
IP configuration session
Presentation transcript:

FF Stabilisation A.Jeremie (Summary of things learned and work done at LAPP, CERN, SYMME, Oxford, SLAC)

Some of the technical work shall be elaborated within the MDI WG, but most results will be obtained in other WGs (beam dynamics WG, LCD, CES WG, Stabilization WG) Highest priority for the work until end 2010 are those subjects linked to the “CLIC critical feasibility items”: - Choice of the magnet technology for the FF magnets - Integration of these magnets into the detectors, and their alignment - Feasibility study of sub-nm active stabilization of these magnets - Luminosity instrumentation - Spent beam disposal - Beam background backsplash from the post-collision collimators and dumps into the detector - Intrapulse-Beam feedback systems in the interface region Excerpt from MDI mandate

Status of design Simulations 0.13 nm with feedback and TMC table Laser-based stabilisation Measurements of GM at DESY/CERN Acoustic noise effect Several PhDs: –S.Redaelli (CERN) 2003 –B.Bolzon (LAPP) 2007 –M.Warden (Oxford) ~2010 –R. LeBreton (SYMME) ~2011 Each time a new team starts this study, there is a non negligible “learning period”. TolerancesFinal Focusing Quadrupoles Vertical0.1 nm > 4 Hz Horizontal5 nm > 4 Hz

Example of spectral analysis of different disturbance sources Acoustic disturbance : Amplified by the structure itself : the eigenfrequencies Ground motion : Seismic motion Cultural noise A pink noise on a large bandwidth =>mechanical stabilization means to isolate and compensate /reject

Mechanical structure and its instrumentation  Actuators used for active control 2.5 m long Force = 19.3 N Maximal displacement = 27.8 μm Resolution = 0.28 nm Can be made with magnetic shielding Resist to 100krad (accumulated dose) - A stacking of PZT patches - Active rejection of cantilever beam resonances: home-made Compensation CERN TMC active table for isolation

From the Finite Element Model to the State-Space Model Tests in simulation Active rejection of cantilever beam resonances: home-made Ex : force (actuator) applied to a point N.Gefffroy et al

 Instrumentation and algorithm efficient for an active rejection of wide vibration peaks down to the sub-nanometre level above 5Hz  Factor 60 of damping between 5Hz and 80Hz down to 0.13nm Active rejection of cantilever beam resonances: home-made  The two first resonances entirely rejected Experimental test L.Brunetti et al (EPAC/Genova 2008)

Instrumentation

How to measure vibrations/ dynamic displacements with amplitudes of 0.1 nm? Seismometers (geophones) VelocityAcceleration Accelerometers (seismic - piezo) Streckeisen STS2 Guralp CMG 3T Guralp CMG 40T Eentec SP500 PCB 393B31 2*750Vs/m2*800Vs/m 30 s -50 Hz120 s -50 Hz 360s -50 Hz 2*750Vs/m2000Vs/m 60 s -70 Hz 1.02Vs 2 /m x,y,z z 10 s -300Hz z 13 kg 13.5 kg 7.5 kg0.750 kg0.635 kg electrochemical Output measurement Endevco 86 PCB 393B12 B&K 450B3 10V/g 98mV/g 0.01Hz-100Hz0.3-6kHz0.05-4kHz modal analysis Prices range from 1keuro to 25keuros kg0.210 kg zzz 0.05nm 0.25nm 0.05nm 11.19nm100nm Measured noise >5Hz LAPP/CERN

Actuators APA actuator from Cedrat, tested at LAPP Characterisation of Accelerometer Reference test bench: Membrane Developped at CERN

Feedback 2 - A local model of the structure : for the disturbances amplified by eigenfrequencies. 3 - A complete model of the structure : for the entire structure 1 - A knowledge of the structure at strategic points : for lumped disturbances f0f0 f1f1 fifi A complete model of the process A knowledge of the process at strategic points A local model of the process

Complete simulation: multi-sensor/multi- actuator configuration Complete model reduced to 8 nodes B.Caron et al SYMME

Replace TMC table by a more compact system

ATF2 FF experience

Ground Shintake monitor Final doublets Beam Interference fringes We want the measurement to have a coherent behaviour with respect to the “beam” => Relative motion between Shintake monitor and final doublets: 6-7nm in the vertical axis above 0.1Hz 4m Good ground motion coherence: measured on KEK site  Separate stiff supports rigidly fixed to the floor Specifications Study the honeycomb block but without feet If Shintake Monitor and FD on separate active supports, coherence is lost

Is the honeycomb table rigid enough? Impact hammer on table Modal deformations  for each resonance (up to 150Hz)  In the three axis Modes1) T-X2) T-Y3) R-Z4) T-Z5) R-Y6) R-X Frequency (Hz) Damping (%) first modes: rigid body modes in 6 degrees of freedom 2 tri-axis accelerometers Michael GUINCHARD (CERN) Z X Y T: Translation R: Rotation  Fix table on whole surface to remove these modes Table fixed on 4 rigid supports at the 4 corners The table is a rigid body, but the feet are not

 Without any masses: 526.1Hz  Even higher than in free configuration!  With masses: 135.2Hz  Fall of the eigenfrequency but still high Table fixed directly to the floor on 1 entire side Choice of the ATF2 collaboration: Get the same table to send it to Japan and fix it to the floor Bees wax: good vibration transmission, can be unglued, stable in time, rad hard Honeycomb table 3 steel plates bolted to the floor Bees wax Set-up can be moved in the future simulation

Vibration measurements ToleranceMeasurement (between QD0) Measurement (between QF1) Vertical7 nm (for QD0) 20 nm (for QF1) 4.8 nm6.3 nm Perpendicular to the beam ~ 500 nm30.7 nm30.6 nm Parallel to the beam ~ 10,000 nm36.5 nm27.1 nm

SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate the usefulness of an active system at ATF2 /Benoit’s work plan/soon at KEK LAPP/CERN/LAL/KEK Need a magnet: – Test it with cryogenics/ B.Parker/ BNL/ soon – Measure vibrations with seismic and laser interferometry of cold mass mouvmt. LAPP/CERN / at BNL? When magnet ready/ Oxford (Urner) at BNL? – Identify vibration sources like GM, cryolines, acoustic LAPP/CERN / at BNL? When magnet ready Design support: – With stabilisation/isolation LAPP/BNL – Cryoline isolation CERN – With compensation (multisensor/multicatuator vs single sensor/single actuator) LAPP/UDS How many FD magnets in same cryostat? LAL/CERN/LAPP… Already achieved 0.13nm rms at 4Hz combining commercial isolation “x10”(CLIC table) and “single” compensation”x3” but in laboratory on a mock-up not in accelerator environment

CLIC FF configurations Courtesy Evgeny Solodko

Pending issues Available resources: – LAPP: A.Jeremie, G.Deleglise, L.Brunetti + mechanic ( all part time) – SYMME: R.LeBreton, A.Badel, B.Caron (part time) – CERN: Most effort in CERN contribution to “stabilisation” is on MB quad (even if we can learn from this work), H.Schmickler – Oxford: Monalisa team on MB quad, ATF2 and CLIC FF Financing: – EuCARD, White paper (although MB), CERN and CNRS Schedule: – Strongly influenced by CDR in 2010! Tasks: – Get a magnet prototype (not feasible before CDR!) – Demonstrate stability to desired level: On laboratory prototype (LAPP and SYMME): ongoing In an accelerator environment (CERN and ATF2): – possibly on CESRTA during 2010 (under discussion) – learn from MB quad stabilisation prototypes during 2010 – later ( ) on ATF2