September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.

Slides:



Advertisements
Similar presentations
Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Advertisements

Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Ulrich RaichLinac-4 instrumentation day May 2007 Longitudinal Bunch Shape Monitor U. Raich.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
David Johnson –APC -.  The Proton Improvement Plan is tasked with Booster upgrades which will increase the Booster throughput required for future operation.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Laser Notcher Pulse Energy Requirements & Demonstration Experiment David Johnson, Todd Johnson, Vic Scarpine.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
Commissioning and Data Collection David Johnson Accelerator Physics Center Proton Source Department Meeting June, 23, 2011.
Carbon Injector for FFAG
ESS DTL beam commissioning
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
A NON LINEAR TRANSPORT LINE FOR THE OPTIMIZATION OF F18 PRODUCTION BY THE TOP LINAC INJECTOR C. Ronsivalle, L. Picardi, C. Cianfarani, G. Messina, G.L.
FNAL, May 10, Introduction for Beam Diagnostics Laboratory Main Mission: R&D on charged particle beam diagnostics for e + /e - linear colliders.
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
REFERENCES [1] C.Y. Tan, FNAL Beams-doc-3646-v16, 2011 [2] V.N. Aseev, TRACK, the beam dynamics code, PAC05 [3] S. Kurennoy, LA-UR TRANSMISSION.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Beam diagnostics in the beamlines
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
PULSE LASER WIRE Laser pulse storage in an optical cavity as a beam monitor & an X-ray source Kaori Takezawa Kyoto Univ. 2nd Mini-Workshop on Nano Project.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Proton FFAG Accelerator R&D at BNL Alessandro G. Ruggiero Brookhaven National Laboratory Alessandro G. Ruggiero Brookhaven National Laboratory.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
D.E. Johnson, T.R. Johnson, K.L. Duel, M. Gardner, V. Scarpine, R.J. Tesarek Motivation Notching process in the Booster creates about 30-35% of the total.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Developments of the FETS Ion Source Scott Lawrie.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Beam Profile Monitor for Spot-Scanning System Yoshimasa YUASA.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Primary Beam Lines for the Project at CERN
NICA injection complex status
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
E-beam scanner experience at FNAL
Progress in the Multi-Ion Injector Linac Design
The Cornell High Brightness Injector
LHC (SSC) Byung Yunn CASA.
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
Transverse coherence and polarization measurement of 131 nm coherent femtosecond pulses from a seeded FEL J. Schwenke, E. Mansten, F. Lindau, N. Cutic,
Linac Diagnostics Commissioning Experience
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Pulsed electron beam cooling experiments: data & preliminary results
Presentation transcript:

September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013

September 12-13, 2013 Acknowledgements B. Briscoe, R. Connolly,, V. Lodestro, W. Shaffer, C. Degen, L. DeSanto, W. Meng, S. Bellavia, N. Tsoupas 2

September 12-13, 2013 OUTLINE Introduction LPM build at BNL 2000: and 200 MeV (collaboration with SNS) 2007: MEBT (collaboration with FNAL) 2010: HEBT (energy and profile) 2015: BLIP Conclusion

September 12-13, 2013 RHIC NSRL LINAC Booster AGS Tandems STAR 6:00 o’clock PHENIX 8:00 o’clock Electron Lens 10:00 o’clock Jet Target & RHIC Polarimeters 12:00 o’clock RF 4:00 o’clock Coherent electron Cooling 2:00 o’clock EBIS BLIP AGS/RHIC Accelerator Complex Launched ‘72 upgraded 2x

September 12-13, 2013 LINAC Beam Parameters Frequency MHz Injection Energy0.750 MeV Final Energy* MeV Peak Current 48 mA/ ~.5 mA P^ Pulse Length450 μs Repetition Rate6.67 Hz Number of Tank9 Length144.8 m Total Peak RF Power22 MW * Energy can be changed energy pulse to pulse

September 12-13, 2013 Linac Beam Parameters BLIP Energy 66/116/139/181/200 MeV RR 6.67 Hz, Pulse width ~ 450 µs, Peak Beam current ~ 48 mA Max integrated current 135 μA Beam time 92.5% /super Cycle RHIC/Booster To booster one pulse every super cycle (Pulse width 226 µs) To HEBT one pulse every super cycle (Pulse width 302 µs) Energy 200 MeV Super Cycle ~ 4 sec, Peak current ~ 500 µA Beam time 7.5%/super Cycle NSRL Energy 200/116 /38 MeV Beam time 7.5%/super Cycle, Pulse width 302 µs

September 12-13, 2013 Laser profile and energy measurement devices build by BNL Profile monitors at 0.75 and 200 MeV (Collaboration with SNS) 2000 MEBT and HEBT, Laser: Nd:YAG; Detector: CT, & BPM Energy, profile and SCP at 750 keV (Collaboration with FNAL) 2007 MEBT, Laser: Nd: YAG, detector: Faraday cup Energy and profile monitor at 200 MeV 2009 HEBT, Laser: Nd:YAG, YLIAM20EG ; detector: FC, screen Profile monitor at 200 MeV (2015 BLIP) 2015, BLIP, laser: YLIAM30EG ;Detector: faraday cup 7

September 12-13, 2013 MEBT 8

September 12-13, 2013 Layout of Existing BLIP Beam Line To Booster & Polarimeter Tank

September 12-13, ,colloboration with SNS At 750 keV, signal was 10-ns notch in the beam created by removing electrons from the beam with a Q-switch Nd:YAG, 200mJ/pulse Detector : current transformer Gm dipole to remove electron Second one to straight the h- beam Scope trace of CT showing notch Created by laser pulse Measured profile (H) with Gaussian fit R. Connolly

September 12-13, MeV: collaboration with SNS At 200 MeV, CFT 200laser, Three 45 deg mirrors and strip line BPM before and after to measure notch created by laser Detector: stripline BPM 11 Logic used to detect current notch Profile with laser (Blue) and carbon wire (red) 200 MeV, BNL HEBT Setup at HEBT R. Connolly

September 12-13, : collaboration with FNAL Transverse Optical System e from H- are guided by magnetic field Solenoid Magnetic Field Nd:YAG ( =1064nm) H- Beam profile Labview Laser: Nd:YAG Detector : faraday cup

September 12-13, 2013 De attached electron Energy measurement 13 Energy of H- Energy spread of H- Space charge potential of H- beam Beam size of H- in three dimension Distribution (current density) of H-

September 12-13, 2013 Space Charge Potential DC Beam a x =13.5, a y =7.0 mm, b x =b y = 38 mm R=(x+y)/2=10.25 mm V 0 (70mA) ~ 200 V T e = =~600 V E e0 = /1838 =408 V  T e =T e0 +  r

September 12-13, 2013 KOBRA Simulations X-Z Plane Axial Mag. Field =0 X-Z Plane Axial Mag. Field =100G X-Y Plane; Axial Mag. Field =100G

September 12-13, 2013 SCP Bunched Beam X-Z Plane Electric Field due to uniform ellipsoid SCP Potential in X-Z Plane LASER E H- = 750,000 eV  E H- =  20,000 eV E e = 408 eV  E e =  10.9 eV

September 12-13, 2013 Buncher ON, Full Current

September 12-13, 2013

Electron Energy at Detector

September 12-13, 2013 Beam Parameters Used in Calculations Current (mA) Buncher On/Off DC Compone nt (%) Bunch Length (deg) 70Off On On On560

September 12-13, 2013 Energy Measurement At low energies (  E(m e /m p ) << SCP) - Space Charge Potential (SCP) - Bunch Length and Bunching Factor At high (  E(m e /m p ) >> SCP) - Energy Spread (  E)

September 12-13, 2013 HEBT LPM 22 This is the detector installed in the HEBT after DTL,9. Laser head was on optics plate. Energy analysis of the signal electrons.

September 12-13, 2013 Scan of signal vs. deflecting magnet current. Tunnel installation without optics plate Optics plate Q-switched Nd:YAG, 100 mJ/pulse, 10 ns pulse, 20 Hz Lasted only few weeks 2009: HEBT LPM

September 12-13, : Gas Stripped Electron Energy Measurement BLIP main interest to know the energy of H- We used gas stripped electrons for this measurement 24

September 12-13, 2013 Data from Energy Scan Connolly A Gaussian is fitted to the derivative of the signal vs. grid voltage data. The center (64.2kV) is the average electron energy from the beam motion and the width (σ=0.87kV) is from beam-energy spread and from the space-charge potential spread. The proton energy is m p /m e =1836 times the measured electron energy: E p = 118 MeV σ p = 1.6 MeV Measured electron energy verse time in the pulse 0.6% drop in the energy during 0.5 ms beam pulse

September 12-13, : Profile measurement By LPM at HEBT 26 Horizontal Vertical

September 12-13, New Fiber laser for HEBT LPM New YLIA M20EG is being install now for 2014 run Laser head will be outside tunnel We transport light into tunnel on 1 mm optical fiber in the tunnel 27

September 12-13, 2013 NEW LPM will be install in the BLIP line 28 R. Connolly

September 12-13, 2013 Operation for BLIP LPM The fiber laser produces 100ns light pulses 10-50μs apart. During one 400μs linac cycle we will digitize 8-40 electron signal pulses. To construct the average beam profile we will sum all of these pulses for each laser position. Beam raster at 5kHz executes two revolutions during single measurement. To confirm rastering we will look for modulation of the electron signal during a single linac cycle. Average profile is built up from linac pulses. One plane is measured at a time. Raster modulation appears in both vertical and horizontal measurements. 29 R. Connolly

September 12-13, 2013 Electron tracks from BLIP-beam Perspective View Top View W. Meng

September 12-13, 2013 TLD Readings in the BLIP Spur During Operations One minute duration Ten minute duration BLIP TARGET Be window LPM C. Cullen

September 12-13, 2013 Life time of fiber Darkening of fiber: This effect is much smaller at 1060nm wavelength than in visible 32 Co-60 source on Corning Infinicar fibers (non-rad-hard fiber). Radiation damage to linear actuators used to translate laser optics. The NAI actuators currently used show no damage after one year in the HEBT however there are circuit boards in the tunnel for terminating the long drive lines. During the 2015 beam run we can test several translation stages in the BLIP tunnel. From the dosimetry data on the last slide we estimate the radiation dose rate at the LPM to be 2550 rad/hour. 100Mrad will be achieved after 1633days or 4.5 years of continuous running. The glass fiber will be replaced as required. R. Connolly

September 12-13, 2013 Conclusions Measurement of profile H - beams by laser neutralization is a proven technique used at BNL, Fermilab and SNS. Measurement of H- energy by measuring electrons energy is very convenient and reliable For low space charge beams, it is possible to measure energy spread For space charge dominated beam, it space charge potential can be measured. It may be possible for measure current densities for BLIP beams 33