Update on the automation of quench heater analysis Zinour Charifoulline 18/06/2015TE/MPE-PE, ZCh1 Automation team: Odd Oyvind Andreassen, Jean-Christophe.

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
RRR Measurements in S23 during LS1 Emmanuele Ravaioli Daniel Rasmussen Scott Rowan Thanks to Z. Charifoulline, R. Denz, J. Steckert, H. Thiesen, A. Verweij.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automatic POWERING EVENT Analysis Adam, Arek, Gert-Jan, Ivan, Knud, Hubert, Markus, Nikolai, Nikolay,
Hyper Status and Preliminary Testing of the New Hyper Bus Fault Detector CP Work done by CP section Based on Slides from Knud DAHLERUP-PETERSEN.
Data Migration Process
TE/MPE/MI OP section meeting 29 th September 2009 HCC 2009 Frequently Asked Questions 0v1 M. Zerlauth.
NQPS trips due to EMC transients 30/06/20111ZCh, TE-MPE-TM Z.Charifoulline - # nQPS.BS signals in A12 & A34 # statistics over.
BKh - 16/01/2007LHC PM Workshop1 SDDS to LabVIEW The path from client data to viewing and analysis Greg Kruk ➔ 08/2006 SDDS converter package Boris Khomenko.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
Essential Question: How do you find a growth factor and a decay factor?
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
25th Nov 2005CERN AB Controls Post Mortem data conversion G.Kruk.
Workshop on good programming style Summary Michał Maciejewski, Bernhard Auchmann, Lorenzo Bortot, Emmanuele Ravaioli, Jonas Ghini, Deepak Paudel, Arjan.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
TE-MPE-EP, RD, 26-Aug Workshop on QPS Software Layer Hardware / Agents R. Denz, TE-MPE-EP.
Review of MPE activities during LS1 and outlook for LS2/LS3 View from BE/CO V.Baggiolini, M.Vanden Eynden On behalf of the BE/CO APS, DA, DO and FE Sections.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
Recent cross-wiring issue and implication for circuits protection Bozhidar Panev TE-MPE-CP
 Software Tools for MPS Kajetan Fuchsberger MPP Workshop, 2013, Annecy Many thanks for input from M. Zerlauth, J. Wenninger, R. Schmidt, G. Kruk, V. Baggiolini,
By Zinour Charifoulline, Scott Rowan Automation of Hardware Commissioning - Offline Analysis of 60A circuits.
QPS R2E Status R2E Internal Meeting, October 24 th 2013Discussion 1 LS1 developments Digital Quench Protection insertion region magnets Delivery/installation.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
TE-MPE-EP New DQLPU type A Production of 1300 new protection units TE-MPE-EP, VF, 23-Nov-2012.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
MP3 List of main Issues during March 2010 MP3 - Team.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
MA PM performance, Adriaan Rijllart Post Mortem data handling and performance Adriaan Rijllart, Beno î t Pannetier, Boris Khomenko, Greg Kruk,
1 15 April 2010: Post Mortem Analysis by M.Zerlauth MP3.1 Markus, Adriaan, Odd, Zinur and many others…
7. Direct Current circuits. 11 Find the currents, which flow in all the wires of the circuit in this figure 12  9 V 6 V b a cd 18 
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
MPE activities within MP3 Arjan Verweij A. Verweij, MPE review, 2 June 2015 The questions: 1. Define the scope of work for your activity 2. Structure of.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
QPS high level controls LabView tools, an overview.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
 The AccTesting Framework - Overview & Visions Kajetan Fuchsberger TE-MPE TM, On behalf of the TE-MPE-MS Software Team: M.Audrain, J.-C. Garnier,
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
HWC Review – Sequencer Vito Baggiolini AB/CO, with the team: Carlos Castillo, Daniele Raffo, Roman Gorbonosov.
MPE Workshop 14/12/2010 Analysis of the RB and RQF/D splice data recorded with nQPS - status and plans towards full automation Analysis of the RB and RQF/D.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Tiina Salmi and Antti Stenvall, Tampere University of technology, Finland FCCW2016 Roma, April 13 th, 2016 Quench protection of the 16T dipoles for the.
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Quench behavior of the main dipole magnets in the LHC By Gerard Willering, TE-MSC On behalf of the MP3-CCC team Acknowledgements TE-MSC, MP3, BE-OP, TE-MPE,
Stale Curve Query Tool Input Screen 0 – 2 Years 2 – 5 Years 5 + Years Book Type # of Stale % of Total Average Curve Code Portfolio Code Ref. Months.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
09/05/ Modelling and testing of circuit protection of new superconducting magnets for the HL-LHC project 2 nd Workshop of the Spanish Traineeship.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
MP3 Review Software tools
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
PSS verification and validation
Simulations of failure cases 1st STEAM Workshop June 2019
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Presentation transcript:

Update on the automation of quench heater analysis Zinour Charifoulline 18/06/2015TE/MPE-PE, ZCh1 Automation team: Odd Oyvind Andreassen, Jean-Christophe Garnier, Markus Zerlauth &K, Roman Gorbonosov

18/06/2015TE/MPE-PE, ZCh2 Quench heater analysis as a part of PM analysis framework (1) qhda – labView executable module within the java environment since ~2010.

CircuitQPS Class#HDSComments RBDQAMCNMB_PMHSU4 x 1232Voltage and current signals RQD/RQFDQAMCNMQ_PMHSU2 x 392Voltage and current signals, but I_HDS≡0 IT (RQX)DQAMGNC8 x 8One PM, old hardware&firmware IPDDQAMGNRD2 x 4One PM, old hardware&firmware IPQ/IPDDQAMGNRQA2 x 46A&B duplication for HDS signals IPQDQAMGNRQB4 x 38A&B duplication for HDS signals IPQDQAMGNRQC8 x 6A&B duplication for HDS signals 18/06/2015TE/MPE-PE, ZCh The LHC circuits protected by quench heaters and post LS1 QPS zoo ∑ = 6076 quench heaters qps_howto_DQHDS_config_2015.pdf, Reiner Denz Some details about analysis and criteria

18/06/2015TE/MPE-PE, ZCh4 Quench heater analysis automation: IPD, IPQ and IT (1) 1: 810V < Initial Charge < 1000V average, median filter 2: 0 < Final Charge < 10V? average, median filter 3: Decay time constant: ±5ms with respect to the reference discharge 4: Curve to curve comparison with reference discharge (details in the next slide) DISCHARGE = Yes, if ∆V>20V for at least 1 heater

18/06/2015TE/MPE-PE, ZCh5 3: Decay time constant: ±5ms with respect to the reference discharge Quench heater analysis automation: IPD, IPQ and IT (2)

18/06/2015TE/MPE-PE, ZCh6 4: Curve to curve comparison with reference discharge curves 1 curve as a result of comparison U i (t) & U_REF i (t) – discharges curves; i=1,2,…,n; n=2,4,8 dUi(t)=(U i (t)-U_REF i (t)) – deviation curves; i=1,2,…,n; n=2,4,8 Quench heater analysis automation: IPD, IPQ and IT (3)

18/06/2015TE/MPE-PE, ZCh7 Disturbance in all 8 curves Disturbance in 1 curve Quench heater analysis automation: IPD, IPQ and IT (4)

18/06/2015TE/MPE-PE, ZCh8 The real event from HWC 2015 Decay time constant: 98ms->120ms Not accepted Quench heater analysis automation: IPD, IPQ and IT (5)

CircuitQPS Class#HDSComments RBDQAMCNMB_PMHSU4 x 1232Voltage and current signals RQD/RQFDQAMCNMQ_PMHSU2 x 392Voltage and current signals, but I_HDS≡0 IT (RQX)DQAMGNC8 x 8One PM, old hardware&firmware IPDDQAMGNRD2 x 4One PM, old hardware&firmware IPQ/IPDDQAMGNRQA2 x 46A&B duplication for HDS signals IPQDQAMGNRQB4 x 38A&B duplication for HDS signals IPQDQAMGNRQC8 x 6A&B duplication for HDS signals 18/06/2015TE/MPE-PE, ZCh The LHC circuits protected by quench heaters and post LS1 QPS zoo ∑ = 6076 quench heaters qps_howto_DQHDS_config_2015.pdf, Reiner Denz

18/06/2015TE/MPE-PE, ZCh10 Quench heater analysis automation: MB (1) Voltage Current + reference discharge stdev<10 -3 Initial charge and resistance Final Charge Decay Time Constants Curve to curve comparison

18/06/2015TE/MPE-PE, ZCh11 Voltage Current Quench heater analysis automation: MB (2) ΔR≈1Ω

18/06/2015TE/MPE-PE, ZCh12 Quench heater analysis automation: RQ9 and RQ10 (1) analysed by Sandrine

18/06/2015TE/MPE-PE, ZCh13 analysed by Per All OK! But some blind discharges due to the common crate controller  Quench heater analysis automation: RQ9 and RQ10 (2)

18/06/2015TE/MPE-PE, ZCh14 Quench heater analysis automation: quench in

18/06/2015TE/MPE-PE, ZCh15 Quench heater analysis as a part of PM analysis framework (2) mpp-logbook, mailto, APEX, Jira, ? pmd-file Only “Powering” Playback? What about heater firing out of powering time? Answer: Yes

18/06/2015TE/MPE-PE, ZCh16 Current status of the qhda-module in the PM framework: The previous version in PM framework is obsolete (ver4.1, 2013) The new LV-code is ready to try in dev-mode The new executable version will be ready by the end of the week (?) It is planned to upload, to test and to make it working during TS#1 Odd, J-C, Roman, Zinur 09/06/ h00 Conclusion

18/06/2015TE/MPE-PE, ZCh17 Thanks!

18/06/2015TE/MPE-PE, ZCh18 IPQ/IPD Nonconformities Updated 09/06/2015 Analysis typeCriteria Initial Charge810V < U_HDS < 1000V Final Charge0V < U_HDS < 10V Decay Time Constantτ REF ± 5ms Curve to Curve comparisonwithin ±20V Discharge = YesIf ΔU_HDS > 20V

18/06/2015TE/MPE-PE, ZCh19 Acceptance limits table

18/06/2015TE/MPE-PE, ZCh20

PMD- filename SDDS PM QHDA  RB  RQD/RQF  IPQ, IPD, IT Analysys PMD-file Analysis result description Analysis module version Time constant Initial charge Final charge Overall result QHDA – executable (compiled) LV2014 code Reference discharge data input ? Hardcoded or will be read ? From where ? User: pma/password ? RB, RQ – 3 PMs ? IPQ, IPD - A/B ? 18/06/2015TE/MPE-PE, ZCh21