CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
JANUARY 14-15, 2014 | NEPOOL MARKETS COMMITTEE Matthew Brewster MARKET DEVELOPMENT | Conceptual design.
Intertie Restoration Update September 15, Intertie Restoration Recommendation Paper Expected to be released by the end of September Will be released.
Pay for Performance Regulation Donald Tretheway Senior Market Design and Policy Specialist January 11, 2012.
Convergence Bidding Overview Margaret Miller Manager, Market Design & Regulatory Policy CPUC Convergence Bidding Workshop August 26, 2010.
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
Midwest ISO Market Readiness Update October 27, 2004.
Loads Acting as a Resource Relationships with QSEs and LSEs
Presentation to WECC Market Interface Committee March 24, 2015
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
Demand Response in Midwest ISO Markets February 17, 2008.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Navigating the Challenges Nancy Saracino Vice President, General Counsel & Chief Administrative Officer California Independent System Operator Independent.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
California ISO – Internal Use Only Flexible Capacity Requirement CPUC RA Workshop March 30, 2012 Mark Rothleder Executive Director Market Analysis and.
Reliability Demand Response Product February 25, 2011
Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.
Benefits of a Multi-year Resource Adequacy Program May 20, 2014 Karl Meeusen, Ph.D., Market Design and Regulatory Policy Lead Market and Infrastructure.
GHG, Renewables, and Reliability IEP ANNUAL MEETING SEPTEMBER 29, 2015 Carrie Bentley Resero Consulting
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Update on Energy Imbalance Market Presentation to WECC Market Interface Committee October 15, 2015 Jim Price, Senior Advisor, Market Development & Analysis,
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Illinois Wholesale Market Update December 10, 2003.
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
1 PG&E Proposals for Refinements to the Resource Adequacy (RA) Program Compliance Year 2017 RA Workshop February 18, 2016.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Asia-Pacific Energy Regulatory Forum
Briefing on 2017 CAISO Policy Initiatives Roadmap
Flexible Forward Contracts for Renewable Energy Generators
Evolution of the ISO Power Markets
Pay for Performance Regulation
Market Pricing Initiatives Update September 9th, 2003
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013

The ISO is removing barriers and incentivizing flexible resources Non-Generator Resources in Ancillary Services Regulation Energy Management –New Resource Model Lower Bid Floor Flexible Ramping Constraint Pay for Performance Regulation (FERC Order 755) 15-Minute Scheduling & Settlement (FERC Order 764) Flexible Ramping Product Flexible RA Capacity Must Offer Obligations Stakeholder Initiative Catalog Slide 2

Ancillary services modifications to support non-generation resources Removed resource type restrictions and reduced minimum rated capacity to 500 kW from 1 MW Reduced minimum continuous energy requirement from 2 hours to: –Day-Ahead Regulation Up/Down: 60 minutes –Real-Time Regulation Up/Down: 30 minutes –Spin and Non-Spin: 30 minutes Minimum continuous energy measured from the period that the resource reaches the awarded energy output –Measurement starts once resource reaches awarded energy, not end of 10 minute ramp requirement Page 3 Approved by FERC September 2010

Regulation energy management provides additional functionality to address limitations of storage resources. Limited energy resources unable to participate in day- ahead regulation market at full capacity w/o REM Regulation dispatch and real time energy keep state of charge near midpoint Slide 4 Example: 20 MW / 5 MWh limited energy resource Green – prior requirement Yellow – regulation energy management 0 MW 20 MW 15 MW 10 MW 5 MW Minutes Regulation Up Approved by FERC November Implemented Fall 2012

Resource model that recognizes a resource can move seamlessly from load to generation Page 5 0 MW 20 MW - 20 MW StorageGenerationDemand Response Ramp PMax Discharge ChargeConsumption

Lower bid floor to incentivize decremental dispatch during over-generation Reduction in bid floor approved by BOG in Renewable Integration Market and Product Review Phase 1 –Current floor ($30.00), Step 1 ($150.00), Step 2 ($300.00) Lower bid floor dependent on bid cost recovery split in to day-ahead and real-time –BOG approved BCR changes December 2012 Slide 6 FERC Approval Pending. Implementation Fall 2013

Flexible ramping constraint to ensure sufficient upward ramping capability is committed Constraint is enforced in real-time pre-dispatch and managed in real-time dispatch Ramping needs met through market optimization versus out of market operator actions Includes compensation mechanism designed to recover opportunity costs of resources providing ramp FERC settlement modified: –Compensation algorithm –Cost allocation split 75% Load and 25% Supply Slide 7 FERC settlement approved and implemented December 2012

Pay for performance regulation introduces two part compensation – capacity and accurate movement Currently, faster resources may receive more regulation dispatches than slower resources, but paid the same capacity price Two part payment for frequency regulation: 1.A payment for regulation capacity and 2.A payment for performance of the resource in response to a regulation signal. Mileage: resource movement as measured by the absolute change in regulation signals between 4 second intervals Accuracy: comparison of regulation signal to actual telemetry Slide 8 Approved by FERC September Implementation Spring 2013

Order 764 provides opportunity to address real-time market inefficiencies and facilitate renewable integration FERC Order 764 has two main components: –Allow 15-minute scheduling –Variable energy resources must provide meteorological data Maximize existing functionality to allow 15 minute schedule updates that doesn’t create seams issues Three settlements by making “RTUC” financially binding –HASP energy/AS settlement is replaced by 15-minute market Convergence Bidding allowed to return to interties assuming Dual Constraint issue resolved Slide 9 Stakeholder initiative ongoing

Flexible ramping product improves upon constraint Compensation based upon “real ramp” or the actual movement between 5 minute RTD dispatch Procures flexible ramping in both upward and downward direction in the day-ahead and real-time market Allows capacity bids in the day-ahead market Combines IFM and RUC for day-ahead FRP procurement and improved market efficiency Improves cost allocation consistent with guiding principles Slide 10 Stakeholder initiative will recommence after FERC Order 764 completed

Flexible resource adequacy capacity must offer obligation two stage process The first stage, for 2014 RA compliance, focuses on: –Default provisions for LRA’s without flexible capacity procurement obligations –Backstop procurement authority The second stage, for 2015 RA compliance, will focus on: –Enhanced performance obligations for flexible capacity resources, including must-offer obligations –Backstop procurement compensation for flexible capacity resource obligations, and –Revisions to the ISO Standard Capacity Product tariff provisions to apply to flexible RA capacity resources. Slide 11 Stakeholder initiative ongoing

Annual process categorizes and ranks identified market design and infrastructure policy enhancements BOG briefed on stakeholder initiative catalog in December 2012 Stakeholders can submit new initiatives into catalog Slide 12 Initiative StatusInitiative Type In progress (12)FERC-mandated (5) Non-discretionary (7) Not yet in progress (45)FERC-mandated (7) Non-discretionary (2) Discretionary Infrastructure policy (3) Market design (33) Completed (25)Stakeholder process completed (but may still be pending other processes)

Sources for additional ISO information (1 of 3) Participation of Non-Generator Resources in A/S – dStakeholderProcesses/NonGeneratorResourcesAncillaryServicesMark et.aspxhttp:// dStakeholderProcesses/NonGeneratorResourcesAncillaryServicesMark et.aspx Renewables Integration Market and Product Review –Phase 1 (Lower Bid Floor) wablesIntegrationMarketProductReviewPhase1.aspxhttp:// wablesIntegrationMarketProductReviewPhase1.aspx –Phase 2 Regulation Energy Management – Page 13

Sources for additional ISO information (2 of 3) Flexible Ramping Constraint – dStakeholderProcesses/FlexibleRampingConstraint.aspxhttp:// dStakeholderProcesses/FlexibleRampingConstraint.aspx Pay for Performance Regulation (FERC Order 755) – formanceRegulation.aspxhttp:// formanceRegulation.aspx 15-Minute Market & Settlement (FERC Order 764) – erNo764MarketChanges.aspxhttp:// erNo764MarketChanges.aspx Flexible Ramping Product – ampingProduct.aspxhttp:// ampingProduct.aspx Page 14

Sources for additional ISO information (3 of 3) Flexible RA Capacity Must Offer Obligations – xibleResourceAdequacyCriteria-MustOfferObligations.aspxhttp:// xibleResourceAdequacyCriteria-MustOfferObligations.aspx Stakeholder Initiatives Catalog – keholderInitiativesCatalogProcess.aspxhttp:// keholderInitiativesCatalogProcess.aspx Page 15