PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Modifications Required on Model Before Meshing & Solving Slice up to define mesh in different areas –Transversely separate vane-tip region (about 16x16mm.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 26, 2010 University of California, Riverside,
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
Status of 201 MHz Prototype Cavity and Curved Be Windows Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Design of the MICE RF Cavity Module :Status of the module designModule flange sealing options Steve Virostek Lawrence Berkeley National Lab MICE
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
RF Cavity / Coupling Coil Module
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Alain FRANCE for the ESS RFQ Team at CEA Saclay
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
UKNFIC meeting, 20 Oct 2005 – From Physics model to Engineering model Peter Savage From Physics model to Engineering model.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
IMP Visit July 10, 2013 Matt Hoff LBNL July 18, 2013.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
RFQ Cold model manufacture, June 2006 Peter Savage The Front End Test Stand Collaboration 1 OFC RFQ Cold Model Manufacture The first step is to convert.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
A. Lambert: Thermal and Mechanical Analysis PXIE RFQ Design Review, Berkeley, CA April 12, 2012 Thermal and Mechanical Analysis of the PXIE RFQ Andrew.
RFQ Cooling Schemes and Instrumentation PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Andrew Lambert - Engineering Division Lawrence Berkeley.
D. Li and S. Virostek for PXIE RFQ team Center for Beam Physics Lawrence Berkeley National Laboratory March 6, 2012.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
PXIE RFQ Derun Li Lawrence Berkeley National Laboratory PXIE Program Review January 16-17, 2013.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
PXIE RFQ Status RFQ Fabrication Summary Module 2 bead pull test complete (Timer will give a talk next). Vane machining continues. We are.
PXIE RFQ Design Overview Derun Li for PXIE RFQ Design Team Center for Beam Physics Accelerator and Fusion Research Division Lawrence Berkeley National.
Progress on Beryllium Cavity Design R. Fernow, D. Li, R. Palmer, D. Stratakis, S. Virostek as told to Michael S. Zisman Center for Beam Physics Accelerator.
PXIE RFQ Engineering Design and Fabrication Project X Fall 2011 Collaboration Meeting Fermilab – October 25, 2011 Steve Virostek - Engineering Division.
LCWS11 WG4 Fully featured accelerating structure engineering design
Overview of the RFCC Module and 201-MHz Cavity Design
LARP Phase II Secondary Collimator RC1
From Physics model to Engineering model
Physics design on Injector-1 RFQ
Mechanical Engineering progress for the Front End Test Stand
Presentation transcript:

PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration LBNL

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 Topics LBNL RFQ experience PXIE RFQ design approach PXIE RFQ design details Thermal, RF and mechanical analyses Current progress Upcoming tasks

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 LBNL RFQ Experience LBNL has developed approximately eight different RFQ designs over the past 30 years Five different brazed or bolt-together RFQ’s fabricated by LBNL The SNS RFQ design team (physicist, engineer, mechanical designer) currently working on the PXIE RFQ project LBNL is also designing an RFQ nearly identical to PXIE for the Institute of Modern Physics (IMP) in Lanzhou, China RFQ4 (bolt-together design) SNS (RFQ5 – brazed structure)

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 PXIE RFQ Design Approach Develop the PXIE design based on past LBNL RFQ experience Use proven, low risk techniques from the SNS RFQ design –Four vane copper-to-copper braze –Fly cut modulated vane tips –Brazed, water cooled pi-mode rods –Low profile, bolted module joints –Removable fixed slug tuners

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 Design Approach (continued) Eliminate high risk, high cost features from the SNS RFQ –Gun drilled cooling passages instead of cut-and-cover approach saves a high risk brazing step –No Glidcop outer shell eliminates the expense of the material and the Au-Cu foil braze –O-rings and RF spring seals instead of tin gaskets for the tuners eliminates the large sealing forces

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 PXIE RFQ Design Features All OFHC copper body machined from solid billets 4-vane cavity structure with fly cut modulated vane tips Four ~1.12 m long cavity modules with bolted joints MHz frequency Total length: 4.46 m Pi-mode rods for mode stabilization Distributed fixed slug tuners CAD model of assembled 4-module PXIE RFQ design concept

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 PXIE RFQ Module Design Features Each module consists of four separately machined vanes Precision ground mating surfaces High reliability copper-to-copper braze forms cavity module 20 fixed slug tuners/module 8 pi-mode stabilizing rods per module 12 field sensing loops per module RF power feed through two loop couplers

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 PXIE RFQ Module Design Features Gun drilled vane and outer wall cooling passages Two vacuum pumping ports per module Separate wall and vane cooling circuits provides active tuning capability Sealing provided by RF and O-ring seals at bolted joints Design details will be presented in design review later this week

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 Pi-mode Rods and Tuners Water cooled Pi-mode rods Fixed slug tuners

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 RFQ Cooling Passages Cooling passages are gun drilled into each vane Modules 1 & 4 Modules 2 & 3 Approximately 12mm diameter Corner passages

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 Cooling Passage Distribution 4 inner channels 8 outer channels

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 RFQ Vane Details Vanes are completely machined along their length before oven brazing Electron Beam weld cooling passage plugs before machining, both ends Vane end details machined after brazing, both ends Pre-braze machining includes: ‐Modulations ‐Ports and holes ‐Braze wire grooves ‐Radial matcher ‐Vane cut back ‐Grinding

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 Precision Assembly Procedure Vertical vanes weigh 150 kg each Horizontal vanes weigh 200 kg each Vertical vanes weigh 150 kg each Horizontal vanes weigh 200 kg each A special fixture is being designed for this pre-braze assembly step SNS RFQ

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 Vane Braze Preparation Braze wire installation Every groove filled Every braze wire staked (secured) No high spots above braze surfaces Braze wire

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 Fabrication Tests Vane cutting tool test Full length vane fabrication test Vane braze test

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 PXIE RFQ Mechanical Analyses Numerous engineering analyses carried for design validation Cavity body and vane cutback thermo-mechanical analyses using an ANSYS RF/thermal/structural model Stress analysis using converted ANSYS thermal model Water temperature tuning analysis using a separate ANSYS model Calculation of area properties for body stiffness analysis Sub-model of the cutback region (RF, thermal, displacement)

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 Current Progress  RFQ engineering design nearly complete - finalize with input from upcoming design review Accurate 3D CAD model of 4-module RFQ is complete Model includes: vanes w/gun drilled passages, pi-mode rods, tuner ports, vacuum ports, sensing loop ports, RF drive ports Model contains detail necessary to generate fab drawings  Preliminary design of RFQ related subsystems is complete RFQ cooling scheme (body, cutbacks, pi-mode rods) RFQ vacuum system configuration (analysis TBD)  Fabrication tests designed and under way  Thermal, RF and mechanical analyses are nearly complete

S. Virostek: PXIE RFQ Engineering Design Project X Collaboration Meeting, Berkeley, CA April 10, 2012 Additional Engineering Tasks  Carry out fabrication tests (at LBNL and IMP-Lanzhou) Write engineering notes describing the test procedures Procure all necessary material  Perform additional analyses Vacuum system analysis Tuner RF/heating analysis Final RFQ support points – stress and deflection analysis  Complete final version of the RFQ 3D CAD model (close)  Generate complete set of multi-step fabrication drawings  Write a detailed engineering notes to document the final RFQ design and the results of the analyses