Specifications Asic description Constraints Interface with PDM board Planning Summary.

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

The MAD chip: 4 channel preamplifier + discriminator.
DPNC Daniel La Marra Activities in 2013 for the Electronics Group « GrElec »
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
End of phase A meeting CNES (Toulouse) 2/02/2012 Ph. Gorodetzky APC - Paris Diderot1 High Voltage power supplies HV Switches Design: J. Szabelski, J. Karcmarczyk,
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
6mm 【 Development of Readout Electronics for MPPC 】 We report the read out electronics of MPPC( Multi-Pixel Photon Counter ). MPPC is a new photodetector.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
Update on Electronics for the SSL 8” Ceramic Detector Matt Andrew, Kurtis Nishimura, Gary S. Varner University of Hawai’i 28-MAR-2012 Discussion 1.
Laguna Beach, CA March 30-April 1, 2003 PMT HV Base Board Development Nobuyoshi Kitamura SSEC / UW-Madison.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
FEV Boards status N. Seguin-Moreau on behalf of
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
The EC-UNIT P. Barrillon on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
Large area photodetection for Water Cerenkov detectors PMm 2 proposal: Front End Electronics MAROC ASIC Pierre BARRILLON, Sylvie BLIN, Jean-Eric CAMPAGNE,
Hardware proposal for the L2  trigger system detailed description of the architecture mechanical considerations components consideration electro-magnetic.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
EC_ASIC drawing (1) ASIC BASIC FASIC D 68 pi ns ASIC A 68 pi ns ASIC C ASIC E 120 pins ABCDEF 68 pi ns 68 pi ns 68 pi ns 68 pi ns.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Status of NA62 straw electronics Webs Covers Services Readout.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
- Overview of the subsystems - The Photodetector Module and its components - The Data Processing and its components - The Power Pack - Summary of subsystems.
Vendredi 18 décembre 2015 Status report on SPIROC chips Michel Bouchel, Stéphane Callier, Frédéric Dulucq, Julien Fleury, Gisèle Martin- Chassard, Christophe.
JRA-1 ISRSI Consortium Meeting Perugia, INAF/IASF (BO,PA)
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
ASIC Activities for the PANDA GSI Peter Wieczorek.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
CALICE meeting LYON 2009, Hervé MATHEZ Yannick ZOCCARATO 1 PCB DEVELOPMENTS AT IPNL (PCB and ASIC) PCB for 1m2 of RPC with HR2 William TROMEUR, Hervé MATHEZ,
Planning of the EUSO-BALLOON project Sylvie Dagoret-Campagne on behalf of the JEM-EUSO collaboration, EUSO-BALLOON project manager LAL/France EUSO BALLOON.
Notes on visit to Rome 28/04/2014 Christian Joram Szymon Kulis Samir Arfaoui.
T HE PDM INTEGRATION P. Barrillon (LAL) & G. Prévôt (APC) On behalf of the PDM crew (Simon, Lech, Philippe, Sylvie B) EUSO-SPB/MiniEUSO progress meeting,
PArISROC Photomultiplier Array Integrated in Sige Read Out Chip Selma Conforti Frédéric Dulucq Christophe de La Taille Gisèle Martin-Chassard Wei
PandaX 实验中的电子学概述 郭国栋 Outline Introduction Original scheme Improved scheme PMT base design in PandaX I and PandaX II Decoupler design in.
CSNSM SPACIROC S. Ahmad, P. Barrillon, S. Blin, S. Dagoret, F. Dulucq, C. de La Taille IN2P3-OMEGA LAL Orsay, France Y. Kawasaki - RIKEN,Japan I. Hirokazu.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
Pierre PRAT Progress the Michel DUPIEUX.
- CLICK WORKSHOP, October BPM for TBL: status of the amplifier Gabriel Montoro*, Antoni Gelonch, Yuri Kubyshin Universitat Politècnica de.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
EC electronic status. Outline Reminders History EC-front unit status EC_ASIC status What next ? 2.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012 Guillaume Prévôt, Sylvie Dagoret and Peter von Ballmoos 1 EUSO-BALLOON,
The EC-front development plan and planning S. Ahmad, P. Barrillon, D. Cuisy, S. Dagoret, P. Dinaucourt, R. Sliwa, JL. Socha EC design review – LAL – 1.
PMF STATUS ALFA - Electronics meeting 11th February 2008
ASIC PMm2 Pierre BARRILLON, Sylvie BLIN, Selma CONFORTI,
on behalf of the AGH and UJ PANDA groups
Analog FE circuitry simulation
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
T1 Electronic status Conclusions Electronics Cards:
Status of the DHCAL DIF Detector InterFace Board
EC board for JEM-EUSO Design investigations
SPACIROC S. Ahmad, P. Barrillon, S. Blin, S. Dagoret, F. Dulucq, C. de La Taille IN2P3-OMEGA LAL Orsay, France Y. Kawasaki - RIKEN,Japan I. Hirokazu –
PRODUCTION RUN: ROC chips STATUS
ASPID (Application of Silicon Photomultipliers to Imaging Detectors)
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
Presentation transcript:

Specifications Asic description Constraints Interface with PDM board Planning Summary

3 ASICs Connector Rigid from EC-ANODE Connector toward the PDM board As close as possible Flex from EC-ANODE Specifications: An ASIC is assigned to each MAPMT  36 ASICs have to be distributed on the boards of the EC-back electronic. They should also include the connectors toward the EC-anode and PDM boards as well as all the passive components needed. The idea is to go for 6 boards perpendicular to the PDM mechanical structure. They would be fixed on a mechanical structure perpendicular to the one of the PDM Each board would have 6 connectors (toward EC-anode boards) and 6 ASICs, many passive components and 1 connector toward PDM board. Volume for Electronics: EC_asic, HV box, PDM board PDM Frame With EC_front MAPMT

ASIC BASIC FASIC D 4 3 ASICs, with their associated passive components, on each side of the pcb 6 connectors (68 pins: 64 anodes + 4 gnd) on one top side 1 connector (120 pins) on top side 68 pins68 pins ASIC A 68 pins68 pins ASIC C ASIC E 120 pins ABCDEF 68 pins68 pins 68 pins68 pins 68 pins68 pins 68 pins68 pins

5 Specifications:  Readout MAPMT signals  Consumption: 1mW/channel  Photon counting: 100% trigger (1/3pe, 10 6 Gain)  Charge/time converter input range : 2pc – 200pc (10pe pe)  Radiation hardness Spatial Photomultiplier Array Counting and Integrating ReadOut Chip 1st version received in October 2010 Technology: AMS 0.35µm SiGe Dimensions : 4.6mm x 4.1mm (19 mm²) Power supply: 0-3V Packaging : P(C)QFP240(160)

6 64 channels Preamplifier with individual 8-bit gain adjustment Photo-electron counting (10-bit DACs) – 3 discriminator outputs : Trig_PA, Trig_FSU & Trig_VFS – Multiplexed discriminator outputs to Digital part – Many parameters available Charge to time converters (called KIs) – Designed in collaboration with JAXA/RIKEN – 9 outputs : 8 channels (8-pixel-Sum) + Last Dynode – Many parameters available Continuous Data acquisition & Readout every 2.5  s (GTU) – 8 identical digital module for PC – 1 digital module for KI First version of SPACIROC showed good behavior (intensive lab tests with and without MAPMT)

7 Package: CQFP 160pins by MATRA Quantity: 100 Cost: 105€/asic Delay: – Package material : 2 weeks – 3 prototypes: 2 weeks – 100 asic: 2 weeks One test board has been produced to sort asic – Cabling ok – Firmware is the same as the previous spaciroc test board – Software should be modified to perform automatic tests

2 types of pcbs are foreseen: 8 1 with a straight flexible part Connector on top 1 with a curved flexible part Connector on bottom

9 Connectors choice: EC_asic: HIROSE FX2CA-68S-1.27DSA - Receptacle - Straight type - Dimension=49mm x 7.5mm - Through hole type Not exactly the same pinout => For EC_asic design, we need to know which connector corresponds to which type of EC_anode

10 3 EC_unit + 2 EC_ASIC boards – Curve EC_anode: connector A, C, E – Straigth EC_anode: connector B, D, F One EC_asic reads half of the EC_unit Pmt 1 Pmt 3 Pmt 2 Pmt 4 B CD A EF FE A DC B

Ki input: sum of 8 consecutive anodes Pmt 1Pmt 2 B CD A EF FE A DC B To check the routing feasibility: Schematic simpler: 2 connectors: curve kapton connector A and straight kapton connector B 2 SPACIROC Connector 120pins ki1ki2 ki3ki4 ki3 ki2ki1 ki2ki6 ki1ki5 ki1 ki6ki2

12 The ASIC: SPACIROC (2/3)

13

Modifications: – Vertical red parts should be modified Increase area for EC_ASIC boards – Support structures have to be aligned with the holes like the central one otherwise cables do not pass – Need room for the HV boards 14 Material: Aluminum Weight: kg Overall dimensions: 167mm x 128mm x 130mm Available area for elect. : 115mm x 100mm ~ 55 mm As short as possible Pair of EC- ASIC boards Need to study how to screw the boards: EC_asic, HV box and PDM board

Dimension could be 140mm x 110mm

Connector 120 pins should be enough Choice: HIROSE FX2-120P-1.27DS – Header – Right angle type – Dimension=82mm x 7.5mm 16 Input name and number of pinsOutput name and number of pins avdd4Sr_ck1Clk_40n1Adata_ki1Atransmit_on1Adata_pc[7..0]8AOR_ki_sum1Aerror_sc1 vdd_ki2Sr_in1Clk_40p1Bdata_ki1Btransmit_on1Bdata_pc[7..0]8BOR_ki_sum1Berror_sc1 dvvd4sr_out1Clk_gtu_n1Cdata_ki1Ctransmit_on1Cdata_pc[7..0]8COR_ki_sum1Cerror_sc1 VH4Sr_rstb1Clk_gtu_p1Ddata_ki1Dtransmit_on1Ddata_pc[7..0]8DOR_ki_sum1Derror_sc1 gnd14resetb1Val_evt_n1Edata_ki1Etransmit_on1Edata_pc[7..0]8EOR_ki_sum1Eerror_sc1 Select_sc_probe1Val_evt_p1Fdata_ki1Ftransmit_on1Fdata_pc[7..0]8FOR_ki_sum1Ferror_sc1 Loadb_sc1AOR_FSU1COR_FSU1EOR_FSU1 Select_din1BOR_FSU1DOR_FSU1FOR_FSU1 What will be the connection between the EC_ASIC and the PDM board? Kapton or cable ? Who is in charge of this connection

Week 9: 24 Jan-3 Feb – Feasibility routing inputs with 2 through hole connectors Week 10: 5 -9 Mar – Feasibility routing inputs with 2 surface mounted connectors – Schematic of whole EC_asic Week 11-14: 12 Mar- 6Apr – Routing whole EC_asic => the dimensions will be set – Schematic of a test board (test_ec_asic) to check functionalities of one EC_ASIC Week 15-16: Easter holidays Week 17-21: 23 Apr- 25May – Routing test_ec_asic board 17 Production PCBs will be done when the money is available Cabling and component procurement will be managed by us

LAL team manage schematic, routing and production of EC_ASIC To Be Defined: – Who can do the mechanical modifications? – Who is in charge of the connection between EC_ASIC and the PDM board (lack of manpower and time at LAL)? 18