The target handling concept of the pbar- separator at FAIR M. Helmecke, V. Gostishchev, R. Hettinger, K. Knie 6th High Power Targetry Workshop Oxford.

Slides:



Advertisements
Similar presentations
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
Advertisements

The FAIR Antiproton Target B. Franzke, V. Gostishchev, K. Knie, U. Kopf, P. Sievers, M. Steck Production Target Magnetic Horn (Collector Lens) CR and RESR.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
Shielding Studies using MARS Monte Carlo code Noriaki Nakao (SLAC) Jan. 6, 2005, WORKSHOP Machine-Detector Interface at ILC, SLAC.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
RADIATION PROTECTION IN DIAGNOSTIC AND INTERVENTIONAL RADIOLOGY
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
M. Modena, A. Aloev CERN, Geneva, CH “An alternative Super-ferric design for ILC QD0” “LCWS14, 6-10 October 2014 Belgrade.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
Status of the FAIR pbar Source K. Knie May 3, 2011.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 9 Study of a logistic concept for Super-FRS RH components Faraz Amjad Helmut Weick.
Martin Winkler, Task7: NUSTAR Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet  The Pre-Separator of the Super-FRS.
RaDIATE October Technical MeetingOctober BLIP Irradiation Planning Radiation Damage In Accelerator Target Environments.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Status of the new Target Design n_TOF Collaboration meeting, Paris 4-5 December 2006 P. Cennini AB-ATB Status of the old Target Removal Status of the old.
Status of Radiation Protection Studies for the Linac4 beam dumps Joachim Vollaire DGS/RP.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Radiation Protection in J-PARC neutrino beam line Sep Yuichi Oyama (KEK) for T2K neutrino beam line construction group Happy birthday.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
LBNE Remote Handling Conceptual Design Issues for ORNL Collaboration Kick-off Meeting at ORNL 1/6/2010.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Status Super-FRS Subproject Target Area Helmut Weick 5 th MAC meeting GSI Darmstadt, 9 th May 2011  Overview  Target  Beam Catcher  Shielding  Handling,
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
Status of the FAIR pbar target: Target handling study (M. Helmecke)
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
KEK Radiation Related Topics neutrino beam construction subgroup Yuichi Oyama (KEK) and target monitor subgroup for.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Status of the FAIR Antiproton Target K. Knie.
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
General overview, layout of the pbar separator Target handling concept FLUKA calculations - for the target station - for the shielding flask Status of.
Oleksiy Dolinskyy 1st December, 2014
PAD-MAD requirements for Access in ISOLDE target area
Schedule for the FAIR Antiproton Target
Induced-activity experiment:
TAXS and TAXN ABSORBERS - OVERVIEW
Air Transport of Commercial Spent Nuclear Fuel (SNF) Assemblies
INSTALLATION SEQUENCE
(Procurement, testing of magnets)
Status of the PANDA Magnet
FRESCA2 Update on the dipole design and new calculations
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Status of the PANDA Solenoid Magnet Production in BINP
as a prototype for Super c-tau factory
Presentation transcript:

The target handling concept of the pbar- separator at FAIR M. Helmecke, V. Gostishchev, R. Hettinger, K. Knie 6th High Power Targetry Workshop Oxford

Outline Boundary conditions for handling concept: - Layout of pbar-separator and target station - Residual dose rates - Assemblies to be disposed Disposal: - Transportation concept in four steps - Handling components: Transport container & shielding flask - Transport to building of hot cell - Layout of hot cell building Outlook & tasks

Overview Antiproton-Separator Building Super-FRS Building

Sections of the pbar separator

Target station with mounted target and magnetic horn BEAM Target: 5 Nickel rods (3mm diameter, 100 mm length) surrounded by graphite in aluminum block, titanium windows Inner conductor of magnetic horn (CERN) Target

Residual dose rate around target station air concrete iron Handling Area Restricted area („Sperrbereich“) Controlled area („Kontrollbereich“) Monitored area („Überwachungsbereich“) According to Radiation protection law („Strahlenschutzverordnung“): Critical value for professionals: 20 mSv/a The dose has to be As Low As Reasonable Achievable (ALARA)! BEAM Input parameters: 5e12p/s, irradiation time: 3.16E7 s

Assemblies to be disposed m ≈ 70 kg m ≈ 120 kg I= 400 kA Activation of about Bq!

How to transport the components to the hot cell? Start point End point Transport on GSI site

Overview Antiproton-Separator Building Super-FRS Building

Transport concept Transport container moves to the shaft (1-2). Crane of carrying frame of the shielding flask lifts up the component (3). Concept accepted in construction permit

Overview of transport I 1 2 3

Bring the target out of the target station Top view, beam from left to right. Inner part of target station is always shielded

Target station and transport container in tunnel Process sequence: Transport container is placed in front of target station. Door of target station and transport container are opened. Component is gripped by a quick coupling system. Trolley moves the component via rail system into the transport container. Doors are closed. Trolley Coupling system Rail system Front door (for intervention only) Inner door

Residual dose rate of open target station Transport container is also used to shield from open target station. (open) open door [Sv/h]

Overview of transport II 1 2 3

Shielding flask: technical design weight: 25 tons Agreement: Design according to a dose rate at the surface of max.100 µSv/h. Detailed specification in progress.

Transport on ground level of the pbar building

Transport outside of the building First positive statement of authorities for transportation concept is already obtained (no ADR requirements!). Special design for trailer necessary; no standard vehicle avaliable. 200 m flat surface

Hot cell of Super FRS: Side view

Layout of hot cell in Super FRS building Helmut Weick, SFRS

Outlook & tasks Detailed specifications of handling components in progress (tendering process starts soon) Thermodynamical considerations, cooling Discussion of remote alignment, specification of adjustment table Detailing of intervention concept Technical intergration, infrastructure requirements => Operation permission

Thank you for your attention!

APPENDIX

Layout of the pbar target area

reaction products B  1/r primary beam does not hit the horn Collecting pbars: Magnetic Horn Magnetic field (B) configuration in Horn B =0 Current, i S. Mohite, CERN/FAIR Workshop on p-bar Sources October

MARS Simulation of the pbar Yields yield = pbars in the ellipse primary protons = 2 × K. Knie, y / cmz / cm E p = 29 GeV

Dose rate calculations for the shielding flask Cross-check with Microshield *) [Sv/h] mmmax. 98 µSv/h mmmax. 95 µSv/h mmmax. 72 µSv/h Nickel target Iridium target *) Kraftanlagen Heidelberg Primary beam activates target directly inside of shielding, but does not hit the flask [cm]