JLab Update Rongli Geng, Ari Palczewski, Yongming Li December 11, 2012 43 rd ILC Cavity Group Meeting.

Slides:



Advertisements
Similar presentations
New Optical Inspection Results at JLab An in-depth update since Chicago meeting ILC08 (Highlights reported in US Regional Talk by Mark Champion) Rong-Li.
Advertisements

Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
PillBox Cavity Update (Button Tests) Bob Rimmer NFMCC CM University of Mississippi Jan 13, 2009.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
D. Li and R. Rimmer, RF Workshop, Fermilab, MHz Cavity Refurbishment and suggestions on future tests Derun Li and Robert Rimmer* Lawrence.
Latest Design of ILC ( RDR). 1.3 GHz technology developed by TESLA Collaboration, R&D from 1992 to reduce the cost per MeV by a factor of 20 from current.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
9-cell cavity coordination CM Ginsburg 8 Mar
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Curtis Crawford, Georg H. Hoffstaetter Cornell University Laboratory for Elementary-Particle Physics Optimization of f 9-cell Vertical Electro Polishing.
Multipacting Simulation for the Muon Collider Cooling Cavities* L Ge, Z Li, C Ng, K Ko, SLAC R.B. Palmer, BNL D Li, LBNL The muon cooling cavity for the.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
High Temperature Heat Treatment to Raise the Quality Factor of Large Grain Niobium Cavities Pashupati Dhakal Gianluigi Ciovati Ganapati Rao Myneni July.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
JLab Update Rongli Geng, Aril Palczewski, Yongming Li September 4, nd ILC Cavity Group Meeting.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
9-cell cavity coordination CM Ginsburg 15 Mar
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Page 1 Jean Delayen Subashini De Silva Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
1 Guided Cavity Repair with Laser, E ‐ Beam and Grinding Genfa Wu Recent cavity processing statistics indicate that the development of RF superconductivity.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
RF Dipole HOM Electromagnetic Design
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
ILC-SCRF Test Facilities considerations
FNAL recent coupler troubles
Rongli Geng Jefferson Lab & GDE
Odu/slac rf-dipole prototype
for the FNAL/ANL, JLab, and Cornell cavity teams
WG-1 Session Cavity Performance Cryomodule Performance
Activities of Cavity Fabrication Facility at KEK
ELLIPTICAL SCRF CAVITIES
Production Cavities in progress
Cost reduction activities in cavity fabrication at MHI
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
9-cell Vender Qualification test for LCLS-II
Working Group 3 Summary TTC Meeting INFN Milan,March 3, 2011
Highlights from EU Global Design Effort
Mechanical Polishing of 1.3 GHz Niobium Cavities
TTC topical-meeting on CW SRF 2013
Multipacting Simulation for the Muon Collider Cooling Cavities*
SRF Cavity Designs for the International Linear Collider*
Crab – RFD prototype: Fabrication Status Update
Presentation transcript:

JLab Update Rongli Geng, Ari Palczewski, Yongming Li December 11, rd ILC Cavity Group Meeting

JLab Status: 9-cell Cavities New 9-cell Low-Surface-Field shape (SLAC design) cavity. –Design package 100% completed –First Cu prototype completed Used for wall removal assessment by CBP –Flat region removes at 75% of that at equator –All niobium cups are in hand Deep drawing, Nitric soaking, vacuum furnace stress relief –CMM inspection of key dimension shows good precision Next re-stamping and weld prep machining Two large-grain ICHIRO shape cavities waiting for processing

JLab Status: Field Emission/Dark Current R&D 9-cell cavity JLab LG#1 optical inspection following RF test with strong field emission –Discovery of discoloration at iris HOM coupler multipacting –Prediction of a hard MP barrier at > 42 MV/m in ILC cavity HOM coupler –Results cross-checked with similar HOM couplers at different frequencies Iris 2 Z=220mm angle=247.2

JLab Status: In-House Mechanical Polishing First 9-cell cavity (NR1) in-house mirror-finish mechanical polishing completed –Four-step procedure based on C. Cooper’s developed at FNAL –Operation in the new building at Test Lab Addition –Intermediate rinse using a medium pressure wand –Optical inspection Clear removal of twin defects in cell#5 which limited cavity at 17 MV/m But a new defect was disclosed in cell#6 in fussion zone of equator weld –Cavity out-gassed in vacuum furnace, waiting for light EP 1-cell cavity mechanical polishing –Copper 1-cell LSF shape LSF1-1 –Large-grain niobium 1-cell G2 Cell 6 new defect 324 degrees