2009-11-04Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.

Slides:



Advertisements
Similar presentations
CCNA 1 v3.1 Module 4 Cable Testing. Purpose of This PowerPoint This PowerPoint primarily consists of the Target Indicators (TIs) of this module in CCNA.
Advertisements

Int 2 Multimedia Revision. Digitised Sound Analogue sound recorded from person, or real instruments.
Rosetta Magnetic Field PDS Review B. J. Anderson.
Space environment and detection : lessons learned from PLANCK/HFI François PAJOT Institut d'Astrophysique Spatiale François PAJOT Institut d'Astrophysique.
Rachel Klima (on behalf of the MASCS team) JHU/APL MASCS/VIRS Data Users’ Workshop LPSC 2014, The Woodlands, TX March 17,2014 MASCS/VIRS Data Record Structure.
CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,
Department of Electronic Engineering City University of Hong Kong EE3900 Computer Networks Data Transmission Slide 1 Continuous & Discrete Signals.
Digital Voice Communication Link EE 413 – TEAM 2 April 21 st, 2005.
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
Dr Martin Hendry, Dept of Physics and Astronomy University of Glasgow, UK Astronomical Data Analysis I 11 lectures, beginning autumn 2008.
Burst noise investigation for cryogenic GW detector TITECH NAOJ Daisuke TATSUMI 2nd Symposium ‐ New Development in Astrophysics through Multi-messenger.
Lecture 1 Signals in the Time and Frequency Domains
FGM report 10 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Chris Carr, Tim Oddy, André Balogh I mperial College London November 2009.
® Kick off meeting. February 17th, 2011 QUAlity aware VIsualisation for the Global Earth Observation system of systems GEOVIQUA workshop February, the.
CCSDS Security WG meeting October 2008, hosted by DLR at DIN premises (Berlin) 1 Data Link Security BOF An ESA contribution on Lessons Learned and Issues/Questions.
1 10th CAA Cross-Calibration meeting, Paris, 2-4 November 2009 STAFF/SC cross-calibration activities Patrick ROBERT, C. Burlaud & STAFF Team 2) The Calibrated.
0. Short reminder of STAFF-SC and STAFF-SA experiment I. status of open action items II. status of data production III. status of calibration IV. status.
An Intercalibrated Microwave Radiance Product for Use in Rainfall Estimation Level 1C Christian Kummerow, Wes Berg, G. Elsaesser Dept. of Atmospheric Science.
CAA 12th Cross-cal meeting Toulouse Oct STAFF status report N. Cornilleau-Wehrlin,P. Robert, V. Bouzid, and STAFF team.
A. Vaivads, M. André, S. Buchert, N. Cornilleau-Wehrlin, A. Eriksson, A. Fazakerley, Y. Khotyaintsev, B. Lavraud, C. Mouikis, T. Phan, B. N. Rogers, J.-E.
CAA 9th Cross-Calibration Workshop, Cambridge, England, 25th-27th March CLUSTER / STAFF ● status of calibration and archiving activities ● archiving.
CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu,
THEMIS FDMO CDR Peer Review − Appendix 1June 1-2, 2004 Appendix.
STAFF Report Patrick Robert, Rodrigue Piberne & STAFF team.
Van Allen Probe Data Pathways SWG, September 23, 2014 D. G. Sibeck NASA/GSFC.
Dec 1, FIELDS Top Level Requirements Review S. Harris (UCB)
RPWI Team Meeting, Sep. 2010, Roma Magnetic Loop Antenna (MLA) Scientific Objectives A. Marchaudon, V. Krasnoselskikh, T. Dudok de Wit, C. Cavoit,
Sound (analogue signal). time Sound (analogue signal) time.
1 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
PEACE DAA Status Andrew Fazakerley, Iryna Rozum, Andrew Lahiff, Branislav Mihaljčić & the PEACE ops team 5 November 2009, DAA meeting, Paris, France MSSL.
1 CAA 2009 Peer Review, Jesus College, Cambridge, UK, March CAA Peer Review: Selected Recommendations.
DAA PEACE Status A. Fazakerley, B. Mihaljčić, I. Rozum, A. Lahiff, G. Watson, D. Kataria UCL Department of Space and Climate Physics Mullard Space Science.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Cluster Active Archive Status of DWP Activities Simon Walker, Keith Yearby, Hugo Alleyne ACSE, University of Sheffield.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
10th CrossCal Workshop, L'Observatoire de Paris, France Cluster Active Archive Status of DWP Action Items Simon Walker, Keith Yearby, Hugo Alleyne ACSE,
Cluster Active Archive Science User Working Group (CAASUWG) - update Matt Taylor on behalf of CAASUWG.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
Spread spectrum modulation Chapter 9.
1 11 th CAA Cross-Calibration Workshop, Hotel die Tanne, Goslar, Germany 7-9 April 2010 CAA 11 th Cross-Calibration Workshop Hotel die Tanne, Goslar, Germany.
Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, G. Watson, C. Anekallu UCL Department of Space and Climate Physics Mullard Space Science Laboratory 21.
WEC meeting TED status and WEC timing.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, N. Doss, G. Watson UCL Department of Space and Climate Physics Mullard Space Science Laboratory 18 th.
21st CAA Cross Calibration Workshop Leiden, March 2015 WHISPER report WHISPER team LPC2E/CNRS.
14 th CAA Cross-calibration Workshop CIS archiving activities York October 5-7, 2011.
Double Star Active Archive - STAFF- DWP 1 K.H. Yearby, S.N. Walker, M. Balikhin University of Sheffield.
GOES Data Status Mutual Benefits of NASA THEMIS and NOAA GOES
CAA Operational Review 9 Double Star PEACE Team Report
3 COMPONENTS OF MAGNETIC WAVES UP TO 4 kHz
LFR first PFM calibration results
Cluster Active Archive – Wideband data BM2 mode
CAA-OR (End of Phase 1) CAA DWP Operations Review
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Solar Wind Core Electrons
Science Requirements The FGM shall measure DC and low frequency perturbations of the magnetic field  see performance requirements The FGM shall measure.
EM pre-integration review
Jolene S. Pickett, Joanne M. Seeberger, Ivar W
Annual Report of the DWP Experiment 9th CAA Operations Review
Solar Probe Plus FIELDS Instrument PSR - MEP Introduction
Jolene S. Pickett, Joanne M. Seeberger, and Ivar W. Christopher
Filtering of Telemetry Using Entropy
Sheffield team interests
Presentation transcript:

Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP

Double Star Active Archive - DWP/STAFF 2 Introduction The wave experiment onboard the TC1 satellite of the Double Star Program consists of a three-axis search coil antenna, three pre-amplifiers, and a Magnetic Wave Form unit provided by LPP (formerly CETP) and the Digital Wave Processor provided by the University of Sheffield. The three first elements are spares of the Cluster STAFF experiment. The search coil aims to measure magnetic fluctuations in the frequency range 0.1 Hz - 4 kHz to characterise waves and turbulence. The Magnetic Wave Form unit digitises the waveform continuously in the frequency range Hz, with snapshots up to 180 Hz. The Digital Wave Processor is based on the Cluster DWP experiment, but it has been modified to perform an onboard spectral analysis in the 10Hz to 4kHz range, similar to the Cluster STAFF spectrum analyser. DWP also contains a particle correlator experiment which computes the auto-correlation (ACF) of electron counts received by the PEACE HEEA sensor. The correlator detects modulations and short time particle bursts in the electron population as an indicator of wave-particle interactions.

Double Star Active Archive - DWP/STAFF 3 Numerical Data products D1_CP_STA_DWP_PSD - Magnetic field power spectral density –Based on the Cluster STAFF power spectral density data product, but measured along single axis aligned for minimum interference. –Frequency resolution: 27 channels, approximately logarithmically spaced 10Hz to 4 kHz. –Time resolution: 4 seconds. –~1.6MB per day (gzipped). D1_CP_STA_DWP_COR_* - Particle correlator data. –On board auto-correlations of the electron counts measured by PEACE. –Auto-correlation product similar to the Cluster particle correlator data. –In addition, raw particle count time series data. Prime and summary parameter data from Double Star Data Centre –STAFF magnetic wave power in 3 channels. Waveform and spectral matrix data –Due to the high level of interference it is not planned to archive these products, except as part of the raw data.

Double Star Active Archive - DWP/STAFF 4 Graphical Datasets D1_CG_STA_DWP_PSD –Power spectral density plots, made directly from the power spectral density numerical dataset. 10Hz to 4kHz range, 4s time resolution, ~330kB per day (gzipped PostScript). D1_CG_STA_DWP_COMBI –Spectrum plots combining spectra produced on the ground from the 10Hz bandwidth waveform data with the 20Hz to 4kHz onboard analysis. 2Hz to 4kHz range, 1 minute time resolution.

Double Star Active Archive - DWP/STAFF 5 Example STAFF/DWP PSD dataset

Double Star Active Archive - DWP/STAFF 6 Example STAFF/DWP Combined plot

Double Star Active Archive - DWP/STAFF 7 Example STAFF/DWP Combined plot

Double Star Active Archive - DWP/STAFF 8 Caveats The STAFF antenna boom failed to deploy which means interference is very high, particularly below 100Hz. –The worst affected datasets (10Hz waveform data and spectral matrix data) will not be archived in calibrated form, but could be accessed from the raw data. –Power spectral density data is processed to synthesise a single axis measurement aligned for minimum interference. This is then integrated over one spin to provide a reasonably isotropic measurement. –Particle correlator data is not affected by the interference. Spacecraft telemetry errors. –The Double Star raw telemetry data is released to instrument teams even when it contains uncorrected transmission errors. –There are no flags or check bits to indicate that uncorrected errors may be present. –The best we can do then is check that the data is correctly formatted and within the bounds of what the instrument can physically measure. –Data containing transmission errors can occasionally fall through these checks. –Errors will typically appear in the PSD or ACF data as individual points with much higher values than those around them.

Double Star Active Archive - DWP/STAFF 9 Technical Status It is proposed that STAFF/DWP DAA data production will be performed by the University of Sheffield, except for the combined plots which already exist at LPP. The ICD and User guide are written. Production software and procedures in place. Minor changes needed for new data product naming convention (DP to CP, etc.). Header files defined. Just waiting for final approval of data formats before starting production.

Double Star Active Archive - DWP/STAFF 10 Funding status There has never been any formal UK national agency (PPARC/STFC) funding for Double Star, only an agreement that staff funded for Cluster operations may work on Double Star as well. Preliminary work on Double Star archiving has been done by Keith Yearby, now the only STFC funded person for DWP operations. We estimate that 6 months FTE is required to complete the Double Star archiving, and request that this be included in any extension to the ESA funding for Cluster DWP archiving.