SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

Slide: 1 Welcome to the Non Linear Beam Dynamics Workshop P. Elleaume Non Linear Beam Dynamics Workshop, ESRF May 2008.
XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Francis Perez ALBA Status.
Short bunches in SPEAR J. Safranek for the SPEAR3 accelerator group November 2, 20101J. Safranek CLS THz Workshop.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Diamond and the UK new light source Chris Christou, X-band workshop, Cockcroft Institute, 1 st December 2008.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES Hard X-Ray Wiggler Sources at NSLS-II Oleg Chubar X-ray source scientist, XFD, NSLS-II Workshop on Preparation of High-Pressure.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Summary of issues. RF-Gun cavity – Disk and washer (DAW) : very fast RF ageing, 2 MeV is not enough. – Quasi travelling wave side couple structure : Lower.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
4th BEPCII IMAC Meeting April , 2006 Status of BEPCII Storage Rings Ma Li April 26, 2006.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Advanced Light Source A New Operational Mode at the ALS Pseudo Single Bunch Greg Portmann, Slawomir Kwiatkowski, David Robin, Walter Barry, Greg Stover,
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
STATUS OF THE SOLEIL RF SYSTEM
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
FFAG Studies at RAL G H Rees. FFAG Designs at RAL Hz, 4 MW, 3-10 GeV, Proton Driver (NFFAGI) Hz,1 MW, GeV, ISIS Upgrade (NFFAG) 3.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Vacuum Devices for accelerator studies Bernard HENRIST CERN TE dept. – Technology Department VSC group – Vacuum Surfaces and Coatings OLAV III Oak Ridge.
RF 1/33 ALBA RF system why, how and other questions Francis Perez.
Status of ATF Fast Kicker Experiment
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
Operational experience of high-power RF at Diamond Light Source
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
Shielding review for temporary spectrometer for RUBICON experiment, ATF beamline #2 K. Kusche, M. Fedurin RSC meeting, Jan 20, 2015.
PETRA III, A New High Brilliant Light Source At DESY
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Report Technical Director Storage-Ring-Installation Completed
Performances of the French synchrotron light source SOLEIL Actions to enhance the reliability of the equipment J.F. Lamarre*, E. Patry X. Delétoille, A.
PETRA III, Status and Upgrade
T980 STATUS AND CHANGES FOR
Low Emittance Rings 2014 Workshop
Status and prospects of VEPP-5 Injection Complex
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
Machine Operation and Progresses in SSRF
Operation Progress and Upgrade in SSRF
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status of the ASTRID2 RF systems
Presentation transcript:

SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1

Performance of SOLEIL operation in 2015 Main events in 2015  Fire  Failure of the in-vacuum wiggler  Femto-slicing : first photons on CRISTAL beamline  Operation with two canted in-vacuum undulators On-going projects C. Herbeaux, November ESLS23, 24-25, 2015, PSI2 Contents

C. Herbeaux, November ESLS23, 24-25, 2015, PSI3 3 weeks without beam due to major incident on utilities 4972 h for beamlines 1236 h for accelerators 5 shutdowns Beam Schedule for 2015

Major Incident in May 2015 C. Herbeaux, November ESLS23, 24-25, 2015, PSI4 Fire occurred in an electric rack of the technical building T3 for the utilities One capacitance exploded and burned Fire lead to damage of the equipment located in the same room 3 weeks have been necessary for : Cleaning Decontamination Repair of all the equipment Waiting for Green light from our Insurance Company - No cooling system available - No compressed air - Compressors for helium had to be stopped

C. Herbeaux, November ESLS23, 24-25, 2015, PSI6 Beam availability in up to run 4 Beam availability after rescheduling Beam availability considering initial schedule

Evolution of the MTBF C. Herbeaux, November ESLS23, 24-25, 2015, PSI7 MTBF is still increasing

C. Herbeaux, November ESLS23, 24-25, 2015, PSI9 2 Interlocks caused beam losses Too high temperature on upstream tapered transition of the in-vacuum wiggler WSV50 Looking at the dependence of temperature and pressure vs filling mode, gap, current Impedance related behavior Failure of the in-vacuum wiggler WSV50 of the PSICHE beamline I=90mA 8 bunches I=90mA multibunch

Failure on the upstream movable transition C. Herbeaux, November ESLS23, 24-25, 2015, PSI10 Defect appears when closing the gap Failure may be due to fatigue phenomena Still being investigated Design improvement may be necessary

Femto-Slicing : Photons on CRISTAL beamline C. Herbeaux, November ESLS23, 24-25, 2015, PSI11 Sliced beam can be used by several beamlines simultaneously

Terahertz : signature of the laser/e- beam interaction C. Herbeaux, November ESLS23, 24-25, 2015, PSI12

Oct. 2015: Femto Slice photons on CRISTAL Images of the beam on the XPAD detector Flux ~ ph/s Distance ~ 0.78 mm ~ 75 eV Energy shift ~ 75 eV Predicted energy shift at 19 MeV ~ 80 eV Core Beam E=7.120 keV Slice Beam E=7.170 keV Centered Diaphragm Shifted Diaphragm Core and slice beam Spectra Predicted flux ~ ph/s factor 30 as expected

Upgrade of the Injection straight section of the Storage Ring Improvement of the injection for the top-up operation New In-vacuum eddy current magnet for injection –Inner vacuum chamber for stored beam made of copper lower power load –Improvement of the magnetic shielding of the inner vacuum chamber. New vacuum chamber for direct-drive septum magnet –The vacuum chamber part of the transfer line is electrically insulated from the storage ring vacuum chamber. No more eddy current propagating in the vacuum chamber of the stored beam. C. Herbeaux, November ESLS23, 24-25, 2015, PSI 14

Last summer shutdown: upgrade of the injection straight section Preparation of the Kicker magnet for bake-out of SDL1. Removing of the old Eddy current septum. Big stuff!

Results : Efficiency of the new septum magnet on the stored beam Comparison of the perturbations on the stored beam between old and new magnet configuration. Comparaison septum passif Direct drive septum horizontally Direct drive septum vertically Eddy current in-vacuum septum horizontally

Operation with two canted undulators in a straight section C. Herbeaux, November ESLS23, 24-25, 2015, PSI17 Liner of the downstream U20 ID was damaged by radiation emitted in the upstream ID

C. Herbeaux, November ESLS23, 24-25, 2015, PSI18 1st step (June 2015) Upstream ID gap 8mm Downstream ID gap 5.5mm Implementation of a beam interlock based on measurement of e - beam position and angle in the upstream undulator 2nd step (January 2016) Upstream ID gap 5.5mm Downstream ID gap 5.5mm A photon absorber located in between the two ID’s protects the downstream one against radiation from the other

New absorber for downstream undulator protection in SDL13 C. Herbeaux, November ESLS23, 24-25, 2015, PSI19 Installation planed in January 2016 Electron beam Photon beam 11 mm separation between the 2 beams Effect on beam lifetime and impedance is acceptable

On going Projects RF –Solid State Amplifiers : a 50 kW-500 MHz amplifier has been built for the ThomX project a 80 kW-500 MHz amplifier is being built for SESAME –Change of one input coupler on RF cavities (January 2016) C. Herbeaux, November ESLS23, 24-25, 2015, PSI kW-500 MHz amplifier for the ThomX project

On going Projects Insertion devices –WSV50 aperiodic (MaxIV/SOLEIL collaboration) –U15 3m long Cryo-ready in vacuum undulator (MaxIV/SOLEIL collaboration) –U18 Cryogenic in-vacuum undulator for ANATOMIX beamline (project delayed because of flood from the roof of the clean room where the ID was assembled C. Herbeaux, November ESLS23, 24-25, 2015, PSI 21 Injection pulsed magnet : Design and fabrication of a MIK (multipole Injection Kicker) (MaxIV/SOLEIL collaboration) Vacuum chamber made of sapphire (2 half chambers bonded by diffusion) Electrodes glued with epoxy (low cure temperature (<190°C)

On going Projects COXINEL Most of the equipment are now available. Installation will start in the next weeks. First test in 2016 Femto-slicing Installation of the Tempo chicane. A second beamline will be able to operate with the sliced beam Upgrade of the laser increasing the frequency the the photons flux. C. Herbeaux, November ESLS23, 24-25, 2015, PSI 22

Conclusions A very impacting event during 2015 but a good availability of beam Commissioning of the Femto-Slicing is still going on towards a user operation in 2016 Operation with 2 canted in-vacuum undulators will allow the two beamlines to operate in nominal conditions C. Herbeaux, November ESLS23, 24-25, 2015, PSI 23

C. Herbeaux, November ESLS23, 24-25, 2015, PSI24 Beam Schedule for h for beamlines 1252 h for accelerators 5 shutdowns