CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.

Slides:



Advertisements
Similar presentations
Ron Bass, J.D., AICP, Senior Regulatory Specialist Jones & Stokes Common NEPA Mistakes and How to Avoid Them January 17, 2008 Oregon Department of Transportation.
Advertisements

Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Environmental Project Commitments The Alberta Experience
National Environmental Policy Act of Establishes protection of the environment as a national priority Mandates that environmental impacts be considered.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
NEPA and Property Acquisition May 19, 2014 Elizabeth Patel Environmental Protection Specialist FTA Office of Planning and Environment.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Welcome NIH Bethesda Campus Master Plan And Environmental Impact Statement National Environmental Policy Act Public Meeting April 8,
Demonstration Using the GIS Inventory for Environmental Professionals John Jediny Deputy Associate Director for NEPA Oversight Council on Environmental.
Lec 20, Ch.11: Transportation Planning Process (objectives)
NHPA, Section 106, and NEPA Highlights and Misconceptions.
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
CHAPTER 7 TRANSPORT PLANNING AND THE ENVIRONMENT.
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Notebook Ref Summary of the Issue ADEC policy states: “If the quality of a water exceeds levels necessary to support propagation of fish, shellfish,
Connecticut Department of Transportation Bureau of Policy & Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
CHAPTER 2 ENVIRONMENTAL DOCUMENTS AND PROCESSING.
Kiggavik Project Final Hearing Presentation
Environmental Impact Assessment University of Santo Tomas College of Architecture SP2 Ecological Construction Environmental Architecture.
EPA!!!!.  One of the first laws ever created to protect the environment  Came into effect due to public concern about the deteriorating human environment.
BCE Environmental Engineering Introduction to Environmental Engineering Mdm Nur Syazwani binti Noor Rodi.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
What does an Environmental Professional Do?
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Lecture(9) Instructor : Dr. Abed Al-Majed Nassar
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Environmental Assessment of Genetically Engineered Animals at CVM (FDA) Animal Biotechnology Interdisciplinary Group Center for Veterinary Medicine U.S.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
National Environmental Policy Act Environmental Engineer US Army Garrison.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
1 [1] Engineering Geology (EC 101) [1] Dr SaMeH Saadeldin Ahmed Associate Prof. of Environmental Engineering Civil and Environmental Engineering Department.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
CE 210Dr SaMeH1 Soil Mechanics & Foundation 1 (CE 210) [9] Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
ISO Session 3 Environmental Management and Ethics in Management.
EIA (Environmental Impact Assessment)
Lecture-18: EIA (Environmental Impact Assessment) Course Instructor: Md Asif Rahman (ASR) Lecturer, Department of Mathematics and Natural Sciences (MNS)
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Willow Meadows Civic Club Meeting September 13, 2011
Infrastructure planning and management
National Environmental Policy Act of 1969 (NEPA)
Unit 6 NEPA.
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
National Environmental Policy Act of 1969 (NEPA)
Environmental Requirements and planning grants
Chicago to Council Bluffs-Omaha
Presentation transcript:

CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University faculty.mu.edu.sa/smohamed/SaMeH 2016/1 Dr. Sameh S. Ahmed

CE 360Dr SaMeH2 Chapter 3 Assessing Environmental Impact

Environmental engineering requires that the impact and interaction of engineered structures on and with the natural environment be considered in any project. It is a must that, environmental impact be assessed whenever a federal action will have an environmental impact, as well as alternatives have to be considered. CE 360Dr SaMeH3 Introduction

CE 360Dr SaMeH4 Engineers ideally approach a problem in a sequence: (1)Problem definition (2)Generation of alternative solutions (3)Evaluation of alternatives, (4)Implementation of a selected solution, and (5)Review and appropriate revision of the implemented solution. This step-by step approach is essentially for most of Environmental assessment. Step-by Step Approach

Definition: Possible adverse effects caused by a development, industrial, or infrastructural project or by the release of a substance in the environment. Environmental law in USA states that: each project funded by federal government or requiring a federal permit must be accompanied by an environmental assessment. CE 360Dr SaMeH5 Environmental Impact

CE 360Dr SaMeH6 Assessment ends with issuing one of the following documents: (1)Finding of No Significant Impact (FONSI). (2)Environmental Assessment (EA). (3)Environmental Impact Statement (EIS). Environmental Assessment

CE 360Dr SaMeH7 AssessmentEAEISFONSI

CE 360Dr SaMeH8 (1)Finding Of No Significant Impact (FONSI). Such a stand-alone finding results when potential environmental impacts are compared to a checklist of significant impacts, with the result that no significant impact can be identified. (2) Environmental Assessment (EA). A detailed assessment of potential environmental impact resulting in one of two conclusions: either the EA must be expanded to a full-scale environmental impact statement or a FONSI results from the EA. Environmental Assessment

CE 360Dr SaMeH9 (3 ) Environmental Impact Statement (EIS). An EIS must assess in detail the potential environmental impacts of a proposed action and alternative actions. Additionally, the agencies must generally follow a detailed public review of each EIS before proceeding with the project or permit. It should be noted that both positive and negative impacts are included; i.e., “impact” does not imply “adverse impact.” These impact statements are assessments and contain no judgments about the positive or negative value of the project in question. Environmental Assessment

CE 360Dr SaMeH10 (EIS): An EIS publication sequence is prescribed by law. 1.First, a Draft EIS (DEIS) is issued by the appropriate federal agency. 2.After mandated public hearings and incorporation of comments, the federal agency issues a Final EIS (FEIS). 3.A Record Of Decision (ROD), which includes the final decision about the project, the alternative chosen, and any value judgments, is also issued. EIS

CE 360Dr SaMeH11 The purpose of environmental assessments was not to justify or fault projects, but to introduce environmental factors into the decision-making machinery and have them discussed in public before decisions about a project are made. Purpose of EIS

CE 360Dr SaMeH12 As the environmental assessment procedure has evolved, assessment of socioeconomic impact of the project has played an increasing role. In addition to direct economic impact (number of jobs, total household income, property values, etc.), socioeconomic impact includes impacts on: archaeological and historical sites, sites that have cultural significance on cultural practices, and environmental justice impacts. Assessment of Socioeconomic Im pact

CE 360Dr SaMeH13 The first step in evaluating the environmental impact of a project’s alternatives is to inventory factors that may be affected by the proposed action. Existing conditions are measured and described, but no effort is made to assess the importance of a variable. Environmental Inventories

CE 360Dr SaMeH14 Any number and many kinds of variables may be included, such as: 1.the “ologies”: hydrology, geology, climatology, and archaeology; 2.environmental quality: land, surface and subsurface water, air, noise, and transportation impacts; 3.plant and animal life; 4.economic impact on the surrounding community: number of jobs, average family income, etc.; 5.analysis of the risks to both people and the natural environment from accidents that may occur during the life of the project; and 6.other relevant socioeconomic parameters, like future land use, expansion or diminution of the population of urban areas (Cont.)

CE 360Dr SaMeH15 The process of calculating projected effects that a proposed action or construction project will have on environmental quality is called environmental assessment. A methodical, reproducible, and reasonable method is needed to evaluate both the effect of the proposed project and the effects of alternatives that may achieve the same ends but that may have different environmental impacts. Methods: Checklist, the interaction matrix, and the checklist with weighted rankings. Environmental Assessment

CE 360Dr SaMeH16 Checklists are lists of potential environmental impacts, both primary and secondary. Primary effects occur as a direct result of the proposed project, such as the effect of a dam on aquatic life. Secondary effects occur as an indirect result of the action. For example, an interchange for a highway may not directly affect wildlife, but indirectly it will draw such establishments as service stations and quick food stores, thus changing land use patterns. a) Checklists

CE 360Dr SaMeH17 The checklist for a highway project could be divided into three phases: planning, construction, and operation. During planning, consideration is given to the environmental effects of the highway route and the acquisition and condemnation of property. The construction phase checklist will include displacement of people, noise, soil erosion, air and water pollution, and energy use. Finally, the operation phase will list direct impacts owing to noise, water pollution resulting from runoff, energy use, etc., and indirect impacts owing to regional development, housing, lifestyle, and economic development. a) Checklists (cont.)

CE 360Dr SaMeH18 The checklist technique thus lists all of the related factors; then the magnitude and importance of the impacts are estimated. Estimated importance of impact may be quantified by establishing an arbitrary scale, such as: 0 = no impact 1 = minimal impact 2 = small impact 3 = moderate impact 4 = significant impact 5 = severe impact The numbers may then be combined, and a quantitative measurement of the severity of the environmental impact for any given alternative be estimated. a) Checklists (cont.)