City of Fernley, Nevada. 8201 – 164 th Ave. NE, Suite 300, Redmond, WA 98052 425-867-1802 April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.

Slides:



Advertisements
Similar presentations
Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
Advertisements

Rural Development Underwriting Program Consulting Engineers Training June, 2012.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
May 30, Meeting & Outreach efforts  February 27th – Proposed Compensation Plan Distributed to Joint Admin/WWOC  March 5th – Joint Admin/WWOC Meeting.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
Copyright Rehmann Robson Pennfield Charter Township Water and Sewer Utilities Rate Study.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Report on Investment Strategy for the Commercial Paper Program Vernon D. Evans Vice President for Finance/ Treasurer Item 7 January 3, 2008.
Municipal & Financial Services Group Village of Downers Grove Water Rate Study Rate Study Overview and Recommendations September 21, 2010 Presented by:
Maintaining Sustainable Water and Waste Disposal Services Copyright 2011 Community Resource Group, Inc. No part of this presentation may be copied or.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
1 Washington Municipal Treasurers Association (WMTA) Conference Utility Rate Studies Presentation by: Angie Sanchez Virnoche Senior Project Manager – FCS.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Determining and Setting Public Utility Rates Bill Wilks, Senior Project Manager November 19, 2014 AGFOA Fall Conference.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
Page: Water and Wastewater Rate Study and Financial Forecast Council Presentation City of Cottonwood July 2009.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
Elk Grove Water District Water Rate Update and Connection Fees Habib Isaac – Principal April 10, 2013.
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
Cost of Service Based Water and Wastewater Rates City of Lawrence, Kansas February 11, 2004 J. Rowe McKinley Keith D. Barber.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Water Supply System Meeting #3 – Allocated FY
October 6, 2005 Edward Cebron, FCS GROUP Including Interest Costs in Impact Fees: Economics, Equity and Methods NATIONAL IMPACT FEE ROUNDTABLE th.
1 Redmond Town Center, th Avenue NE, Suite D-215, Redmond, WA 98052; T: (425) F: (425) BCWWA Annual Conference.
Winchester Municipal Utilities 2009 Rate Plan April 9, 2009.
2016 Water and Wastewater Rates Committee of the Whole November 16, 2015 Presenter: Mike Mayes – Director, Financial Services/Treasurer.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
Nassau-Amelia Utilities FY 2008 Utility Rate Study Presented by: Andrew J. Burnham July 9, 2007 Nassau-Amelia Utilities.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
Commission Meeting November 18, 2015 WSSC Customer Use and Pricing.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
Presented to the City of Dover, Delaware June 6, 2006 Revenue Requirements, Cost of Service and Rate Adjustments for the Electric Utility.
Presentation for a W ATER R ATE S TUDY Chris Fisher Jeff McGarvey Tony Thrasher CITY OF SOLEDAD, CALIFORNIA Presented by.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
RATE ANALYSIS FY FY 2019 March 6, 2014 CARSON VALLEY WATER UTILITY FUND 326 – DEPARTMENT 864.
Resolution 2014R-100 December 18,  Board Direction ◦ Establish a “Stabilized” cost-of-service rate of $ for FYs 2015 & 2016 that includes.
Resolution 2014R-099 December 18,  Board Direction ◦ Establish a monthly cost-of-service rate of $ for FY 2015 and utilize a General Fund.
Kevin Burnett Presented by CITY OF TULARE, CALIFORNIA.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
City of East Point FY 2012 Budget Presentation. Comparison of FY11 vs. FY12 Budget Policies Proposal FY 11 TotalFY12 O&M Changes FY11 Current Budget 94,652,326.
Water Rate Presentation City Council Meeting December 14, 2010.
What are they and how are they calculated? May 2015.
Global Service Provider Buildings Energy Environment Transportation Water Water and Wastewater Rate Study Village of Villa Park, Illinois Presented to.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
1 City of Cocoa Michael Burton - President Andrew Burnham - Senior Vice President Ashley Venturoni – Project Consultant Presented by: FY 2013 Water, &
May 31, 2016 WATER & SEWER RATE STUDY PRESENTATION 5/9/2016 City of Greenfield, California.
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
City of Petersburg Water and Wastewater Rates
Water & Wastewater Capacity Charge Work Shop
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Final Rate Study Findings
City of Sisters, OR 2017 Water & Sewer Rate Study
MOUNTAIN REGIONAL WATER
Joshua Basin Water District Draft Findings & Rate Scenarios
Water & Sewer Rate Study Presented by: Chris Gonzalez, Project Manager
Water and Sewer Rate Study
Joshua Basin Water District Revised Rate Recommendations
Water & Sewer Rate Study Presented by: Chris Gonzalez, Project Manager
City of Lebanon, Missouri Electric Department
Idyllwild Water District
Work Session Follow UP Aug. 23, 2018.
Mark Beauchamp Utility Financial Solutions, LLC
Town of Wrentham DPW Water Department
2018 Water/Wastewater Rate Study and Financial Forecast
Presentation transcript:

City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates & Connection Charges W A T E R S E W E R 

Page 2 Presentation Outline Major Assumptions Recap of Fiscal Policies Revenue Requirement Results Connection Charge Results Cost of Service/Rates Questions

Page 3 Economic Assumptions Operations-related cost inflation: 3% Capital construction cost escalation: 4% Labor cost inflation: 4% Benefit cost inflation: 5.5% Interest earnings on cash balances: 3% Annual customer growth: 10%

Page 4 Capital Funding Assumptions Connection charge revenues incorporate proposed level of charges Recommended internal policy: Maximum of 50% of connection charge revenues used to pay debt service; remaining used to directly fund capital projects (mitigates risk of growth not occurring as planned)  Phased-in for water utility  Fully implemented for sewer utility State Bond Bank used as debt financing mechanism Interest rate: 5.25% Term: 30 years Coverage requirement: Annual revenues net of O&M must equal 1.0 times debt service (including connection charge revenues used to pay debt service)

Page 5 Fiscal Policies 1.Operating Reserve oTo ensure that adequate working capital to accommodate fluctuations in the timing of expenditures and revenues oMaintain a minimum balance in the operating account, equal to 60 – 90 days of O&M for water, 45 – 60 days for sewer oSustained from rates PROPOSED

Page 6 Fiscal Policies 2.Capital Contingency oTo provide a source of funding for emergency repairs (other than catastrophic events), unanticipated capital expenditures, and project cost overruns oTo avoid large unexpected rate increases oMaintain a minimum balance in the capital account equal to 1% of fixed assets oSustained from capital revenues, system reinvestment funding, and excess operating revenues PROPOSED

Page 7 Fiscal Policies 3.System Reinvestment oTo ensure ongoing system integrity through reinvestment in the system oTo charge customers commensurate with the consumption of facility useful lives (rate equity) oTo maintain rate stability oWater: Annually fund from rates an amount equal to annual depreciation, less debt principal (50% funding achieved this study period) oSewer: Annually fund from rates an amount equal to annual depreciation expense (Fully funded) oHold in capital account to be spent on system replacement PROPOSED

Page 8 Fiscal Policies 4.Debt Service Coverage oTo ensure compliance with existing loan / bond covenants and maintain credit worthiness for future debt issuance oSet rates to maintain a coverage ratio of at least 1.00 for State Bond Bank debt service oConservatively includes only that portion of connection charge revenues assumed to pay debt service PROPOSED

Page 9 WATER UTILITY

Page 10 Water Growth Projections

Page 11 Water Capital Financing Plan $101.1 million (inflated) in planned capital projects FYE Developer-funded: $0.1 million (0.1%) Total debt proceeds: $81.3 million (80.4%) Total cash funding: $19.7 million (19.5%) $50 million bond proceeds received year prior to need; reflected in 2007 fund balance

Page 12 Water Operating Forecast Additional O&M costs added due to treatment plant $0.9 million in FY 2008/09 and $1.8 in FY 2009/10 Increase annually with inflation thereafter Other operating expenses increase annually with inflation

Page 13 Water Revenue Requirements Major cost drivers Additional treatment O&M costs System reinvestment funding Debt service not funded with connection charges

Page 14 SEWER UTILITY

Page 15 Sewer Growth Projections

Page 16 Sewer Capital Financing Plan $64.6 million (inflated) in planned capital projects Developer-funded: $0.1 million (0.2%) Total debt proceeds: $35.2 million (54.5%) Total cash funding: $29.3 million (45.4%)

Page 17 Sewer Operating Forecast Operating expenses increase annually with inflation

Page 18 Sewer Revenue Requirements

Page 19 Connection Charge Elements Existing Cost Basis (Existing System Facilities) Future Cost Basis (Capital Improvement Program) Measure of System Capacity (Customer Base) Proposed charge basis = equivalent residential capacity units (ERCs) Projected ERCs to be served by total system capacity

Page 20 Water Connection Charge

Page 21 Sewer Connection Charge

Page 22 WATER UTILITY Cost of Service / Rate Design

Page 23 Water Cost of Service Process Step 1 = Allocate total utility costs by function Water Utility Functions  Customer  Meters & Services  Base Demand (costs to provide average level of consumption)  Peak Demand (costs to provide peak usage/capacity)  Fire Protection Step 2 = Develop allocation factors using customer facility requirements and usage characteristics Step 3 = Allocate Costs to customer classes ** Industry Standard Methodologies; AWWA Principles of Water Rates, Fees and Charges, M1 Manual

Page 24 Water Costs by Function Step 1- allocate costs to functions – FYE 2008 ($2,722,649)

Page 25 Step 2- Develop allocation factors with customer facility requirements and usage characteristics Water Cost Allocations by Customer Class

Page 26 Water Costs by Customer Class

Page 27 Water Rate Structure Evaluation Charge per unit for SFR and MFR; charge per unit increasing with meter size for COM Eliminate per unit charge Design separate schedule of charges for SFR, MFR and COM classes  Benefits low water users and fixed income customers  Simplifies rate structure Existing StructureProposed ChangeBenefits Same schedule of charges for all customer classes Design class-specific charge  3 rd block targets high water users  Sends more effective pricing signals Base Charge Volume Charge Three-tiered volume charge for SFR; class-specific single block charge for MFR & COM Usage allowance of 10 kgal per unit per month Eliminate usage allowance  Recognizes difference in peak period usage  Recognizes class-specific fire flow requirements and can incorporate a portion of peak use cost (revenue stability)

Page 28 Water Rates Residential - Individually Metered Block 1 set equal to average winter use (53% of customer bills) Block 2 set equal to about 2 x average annual use (36% of customer bills) Block 3 targets high water users (11% of customer bills) Existing rate structure recovers 65% / 35% between base / volume charges Cost of service rate structure recovers about 35% / 65% from base / volume charges

Page 29 Water Rates Residential – Master Metered Existing rate structure recovers 90% / 10% base / volume compared to 25% / 75% in the cost of service rate structure

Page 30 Water Rates Commercial Existing rate structure (25% / 75% base / volume) recovers less more costs from the volume charge compared to the cost of service rate structure (20% / 80% base / volume)

Page 31 Sample Water Bills Customer with average usage of 14 kgal will see a $6 increase in their monthly bill under COS 2008 rates Customers over 30,000 gallons will experience increasingly higher bills under 2008 COS

Page 32 Sample Water Bills

Page 33 Sample Water Bills

Page 34 Sample Water Bills

Page 35 Sample Water Bills

Page 36 Sewer Utility Proposed Rates

Page 37 Sewer Rate Comparison

Page 38 Questions?