September 4, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 Forecast Verification.

Slides:



Advertisements
Similar presentations
WP Operative Plan WP 4 : Functional requirements Task Responsible: Regione Piemonte.
Advertisements

INITIAL CONDITION: 31 May 2014 Extended range prediction during 2014 season Extended range prediction during 2014 season Using CFS based Grand Ensemble.
September 10, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 Forecast Verification.
Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And GFSv2 forced with Bias corrected CFSv2 forecasted SST.
Willem A. Landman Ruth Park Stephanie Landman Francois Engelbrecht.
The North American Monsoon System: Recent Evolution and Current Status Update prepared by Climate Prediction Center / NCEP 24 September 2012.
Potential Predictability and Extended Range Prediction of Monsoon ISO’s Prince K. Xavier Centre for Atmospheric and Oceanic Sciences Indian Institute of.
Assessment of CFSv2 hindcast (seasonal mean) CPC/NCEP/NOAA Jan 2011.
Forecast Verification Working group on Extended Range Prediction Ministry of Earth System Sciences, India.
Weiming Sha and Guixing Chen Tohoku University, Japan 1st MAHASRI/AMY WS Yokohama/Tokyo, Study on Monsoon Onset in South China (Huanan area)
Dr. K.K. Singh Head, Agromet
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
The North American Monsoon System: Recent Evolution and Current Status Update prepared by Climate Prediction Center / NCEP 05 August 2013.
The North American Monsoon System: Recent Evolution and Current Status Update prepared by Climate Prediction Center / NCEP 27 August 2013.
India summer monsoon rainfall in ECMWF Sys3 – ICTP, August Indian summer monsoon rainfall in the ECMWF seasonal fc. System-3: predictability and.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Seasonal Atlantic Hurricane Outlooks Dr. Gerald Bell Lead Seasonal Hurricane Forecaster Climate Prediction Center 27 May 2008 Archive of past outlooks.
Progress of CTB Transition Project Team for Land Data Assimilation: Impact on CFS of: A) new land model (Noah LSM) B) new land initial conditions (from.
11 Predictability of Monsoons in CFS V. Krishnamurthy Center for Ocean-Land-Atmosphere Studies Institute of Global Environment and Society Calverton, MD.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
September 4, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 Forecast Verification.
The European Heat Wave of 2003: A Modeling Study Using the NSIPP-1 AGCM. Global Modeling and Assimilation Office, NASA/GSFC Philip Pegion (1), Siegfried.
Effect of Tibetan snow on Indian Summer monsoon rainfall using RegCM2.5 M. S. Shekhar & S. K. Dash Indian Institute of Technology Delhi Hauz Khas, New.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
1. Introduction 2. The model and experimental design 3. Space-time structure of systematic error 4. Space-time structure of forecast error 5. Error growth.
George A. Galleher, PE Hydro Fleet Operations Duke Energy Carolinas NC Drought Management Council Duke Energy Update March 24, 2011.
The North American Monsoon System: Recent Evolution and Current Status Update prepared by Climate Prediction Center / NCEP 03 June 2013.
The North American Monsoon System: Recent Evolution and Current Status Update prepared by Climate Prediction Center / NCEP 01 July 2013.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Climate-Weather Presentation For Climate Modeling 20 September 2013.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
1 Summary of CFS ENSO Forecast September 2010 update Mingyue Chen, Wanqiu Wang and Arun Kumar Climate Prediction Center 1.Latest forecast of Nino3.4 index.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
September 14, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 INITIAL CONDITION 13 th September 2013 Extended range prediction during 2013 season.
REPENTURN July 5, 2015 REPENTURN REPENTURN REPENTURN.
Moisture Flux and Specific Humidity overlaid with Wind vectors (850mb) Moisture Flux Scale Specific Humidity Scale.
Caio A. S. Coelho, S. Pezzulli, M. Balmaseda (*), F. J. Doblas-Reyes (*) and D. B. Stephenson Forecast calibration and combination: A simple Bayesian approach.
1 Summary of CFS ENSO Forecast December 2010 update Mingyue Chen, Wanqiu Wang and Arun Kumar Climate Prediction Center 1.Latest forecast of Nino3.4 index.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 8/31/2017
Forecast Verification
Country Presentation SASCOF September 2016 Maldives
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Seasonal Climate Forecast For NAME 2004 J. E. Schemm
2013 Macau Rainy Season Forecast
Seasonal prediction of South Asian summer monsoon 2010: Met Office
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Replace With Title of Your Choice
Revised Monsoon 2015 Forecast
Forecast Verification
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
Forecast Verification
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Forecast Verification
Prediction of Extreme Heat Real-time forecast based on 20th June 2016
Forecast Verification
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 9/28/2017
Tropical cyclones movement
February 2007 Note: Source:.
UW WRF mbar forecasts.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
2015 January February March April May June July August September
Presentation transcript:

September 4, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 Forecast Verification

September 4, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 2 Spatial pentad mean pattern

23 June 2016SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 3 Pentad mean Rainfall (mm/day) for period 31July-4 August, 2013 CFS GFSbc P4-lead, IC 15 July P3-lead, IC 20 July P2-lead, IC 25 July P1-lead, IC 30 July ActualAnomaly Forecast valid for Period 31July-4Aug

23 June 2016SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 4 Pentad mean Rainfall (mm/day) for period 5-9 August, 2013 CFS GFSbc P4-lead, IC 20 July P3-lead, IC 25 July P2-lead, IC 30 July P1-lead, IC 4 Aug ActualAnomaly Forecast valid for Period 5-9Aug

23 June 2016SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 5 Pentad mean Rainfall (mm/day) for period August, 2013 CFS GFSbc P4-lead, IC 25 July P3-lead, IC 30 July P2-lead, IC 4 Aug P1-lead, IC 9 Aug ActualAnomaly Forecast valid for Period 10-14Aug

23 June 2016SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 6 Pentad mean Rainfall (mm/day) for period August, 2013 CFS GFSbc P4-lead, IC 30 July P3-lead, IC 4 Aug P2-lead, IC 9 Aug P1-lead, IC 14 Aug ActualAnomaly Forecast valid for Period 15-19Aug

23 June 2016SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 7 Pentad mean Rainfall (mm/day) for period August, 2013 CFS GFSbc P4-lead, IC 4 Aug P3-lead, IC 9 Aug P2-lead, IC 14 Aug P1-lead, IC 19 Aug ActualAnomaly Forecast valid for Period 20-24Aug

23 June 2016SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 8 Pentad mean Rainfall (mm/day) for period August, 2013 CFS GFSbc P4-lead, IC 9 Aug P3-lead, IC 14 Aug P2-lead, IC 19 Aug P1-lead, IC 24 Aug ActualAnomaly Forecast valid for Period 25-29Aug

23 June 2016SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 9 Pentad mean Rainfall (mm/day) for period 30 Aug-4 Sep, 2013 CFS GFSbc P4-lead, IC 14 Aug P3-lead, IC 19 Aug P2-lead, IC 24 Aug P1-lead, IC 29 Aug Actual Forecast valid for Period 30 Aug-3 Sep Anomaly

23 June 2016SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 10 Pentad mean Rainfall (mm/day) for period Sep, 2013 P4-lead, IC 19 Aug P3-lead, IC 24 Aug P2-lead, IC 29 Aug P1-lead, IC 3 Sep Actual Forecast valid for Period 4 -8 Sep Anomaly CFS GFSbc

23 June 2016SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 11 CFS-GFS Forecast Verification Over Homogenous Regions MZI, CEI, NEI, NWI & SPI

CFS, CEI

GFSbc, CEI

CFS, MZI

GFSbc, MZI

CFS, NEI

GFSbc, NEI

CFS, NWI

GFSbc, NWI

CFS, SPI

GFSbc, SPI

4 Aug IC MISO F/C verification For 25 Days 9 Aug IC

14 Aug IC MISO F/C verification For 25 Days 19 Aug IC Observation is for 20 Days