ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.

Slides:



Advertisements
Similar presentations
1 MULTI-BUNCH INTEGRATED ILC SIMULATIONS Glen White, SLAC/QMUL Snowmass 2005.
Advertisements

ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Some simulation results on FF/FB system for ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 25, 2008.
Luminosity Stability and Stabilisation Hardware D. Schulte for the CLIC team Special thanks to J. Pfingstner and J. Snuverink 1CLIC-ACE, February 2nd,
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
Alignment and Beam Stability
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
CERN, BE-ABP (Accelerators and Beam Physics group) Jürgen Pfingstner Orbit feedback design for the CLIC ML and BDS Orbit feedback design for the CLIC ML.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
NLC Intra-Pulse Fast Feedback Simon Jolly Oxford University NLC Beam Delivery Meeting July 2001.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
ILC Start-End Simulations Glen White, SLAC May 13, 2014 AWLC14, Fermilab.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
European Organization for Nuclear Research International Linear Collider INTERNATIONAL WORKSHOP ON FUTURE LINEAR COLLIDERS ЛЦВС14 Vinča Institute of Nuclear.
ILC Feedback System Studies Nikolay Solyak Fermilab 1IWLC2010, Geneva, Oct.18-22, 2010 N.Solyak.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
J. Pfingstner, LCWS13 Jitter and ground motion studies November 13, 2013 Beam jitter at ATF2: A. Source localisation and B. Ground motion correlation Jürgen.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 DR -> IP Beam Transport Simulations with Intra-Train Feedback Glen White, SLAC Jan 19 th 2006.
Placet based DFS simulations in the ILC Main Linac. Some preliminary results of error scans open for discussion Javier Resta Lopez JAI, Oxford University.
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
Emittance Tuning Simulations in the ILC Damping Rings James Jones ASTeC, Daresbury Laboratory.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
April Recent work on Low Emittance Transport, Main Linac Paul Lebrun CD/FNAL.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
BDS, Start to End Simulation, Simulation Codes Summary D. Schulte.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
1 Updated comparison of feedback implementation for e + e - and e - e - modes of operation with realistic errors in the BDS M. Alabau Pons, P. Bambade,
ILC Main Linac Beam Dynamics Review K. Kubo.
Integrated ATF2 Dynamic Tuning Simulations Glen White, LAL/SLAC ATF2 Software Workshop June 2008 Simulation overview. Tuning for 37nm IP vertical beam.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
ILC BDS Alignment, Tuning and Feedback Studies
Expected hardware status and Priority of the commissioning task
In collaboration with P. N. Burrows, A. Latina and D. Schulte
Tolerances & Tuning of the ATF2 Final Focus Line
Transverse Beam Jitter Propagation in Multi-bunch Operation at ATF2
3rd ATF2 Project Meeting, December 18-20, 2006
Towards a ground motion orbit feed-forward at ATF2
Presentation transcript:

ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning meeting 20th August 2008

Bunch-Bunch FB Systems Aim: Position and angle jitter corrections to achieve goal 2: control of the beam position at level ≈ 5 % σ * y (ATF2 goal 2) Studies on progress: Design of a fast intra-train FB to be located in the ATF2 EXT line (FONT project) Design of a fast intra-train IP-FB to achieve the desired position control Simulations to understand the dynamics of the system, assuring an optimal performance of the FB system Realistic simulations: understand and determine the several error sources Joint operation of the different FB systems: bunch-bunch, pulse-pulse ( FB integration) Check the robustness of the model and possible integration in flight simulator (collaboration with other tasks)

Simulation infrastructure Using the tracking code PLACET-Octave (developed at CERN) First only considering the y, y’ correction (most critical). Straight extension to x, x’ correction Study the jitter propagation EXT-bunch-bunch FB system: –Two kickers (K1 & K2) for vertical position ( Y ) and angle ( Θ) correction –Three pickups (P1, P2, P3) for transfer matrix reconstruction and for FB loop –Assuming a BPM rms noise of 1 μm (input BPM resolution) –Assuming a kicker strength error (Here we assume < 0.5 %) Normal random distribution of initial vertical jitter positions with a width of +/- 40 % σ y ( rms beam size at the entrance of the extraction line ) Apply static misalignment using “standard errors” (list by GW) + alignment procedure (connection with other tasks: BBA methods and orbit-steering) Introducing ground motion (GM) misalignment (model K) IP-bunch-bunch FB system: –IP-BPM (resolution ~ nm) –Kicker in between of the final doublet quadrupoles –More detailed study in progress

Using a SVD algorithm: The SVD algorithms easy to implement and very robust. Commonly used in orbit steering correction (using several correctors and BPMs), it can also be used for fast FB In the case of a fast-FB important to select appropriate BPMs and correctors for the FB (optimisation of the FONT element positions) Measure the position and angle jitter of the first bunch in a train Knowing the response matrix, apply the SVD method to correct the rest of the bunches of the train Alternative: using a classical PID control loop EXT Bunch-Bunch FB

IP Bunch-Bunch FB Preliminary simulations have shown that GM motion (10s model K) produces a mean beam offset at IP of ~ 60% σ * y. Additional y position jitter and gradient errors in the FD quadrupoles produce another significant mean beam offset at IP. Intra-train IP-FB necessary to achieve goal B ( 5 % σ * y level stability) Using Honda IP-BPM with nm resolution level (Y. Honda et al., Phys. Rev. ST-AB 11, (2008)) Necessary: Specify kicker position Detailed design and optimisation of a robust FB algorithm: PID control loop, adaptive system ? Performance simulation and study of the limitations

FB Integration (preliminary) Misalignment with survey errors (GW table: ) + BBA procedure (preliminary): 11 correctors (ZH & ZV) and 50 BPMs along the lattice to minimise √(σ * x σ * y ). Establish a more realistic model (inter-tasks collaboration) + EXT-FB & IP-FB (possibility to join both using a common response matrix and SVD method? In reality may be challenging!) Simulated 100 events (pulses), with 3 (20) bunches per event 40 % σ y ( rms beam size at the beginning of the EXT line) offset 10 % σ y position jitter between events

Plan, schedule and remarks A PLACET-Octave based ATF2 model with FB systems. PLACET-Octave (easily callable from Octave and/or Matlab) We plan to improve the model, adding the missing error sources (list from Glen White). [To be completed in September/October] Optimisation of the FB parameters (gain factors). Check the model robustness and benchmarking with other codes (?) [To be completed September/October] Joint operation of the different FB system (EXT + IP). Integrated simulations with slow and fast FB systems. At this point, very important collaboration with other tasks: –Extraction line orbit correction/Feedback (Y. Renier) –FFS Orbit-Steering/FB (A. Scarfe) –BBA alignment (G. White, R. Tomas, …) Please, contact me if interested in this collaboration Possibility to include the bunch-bunch model on flight simulator. To be discussed with Yves and Glen.