AGS Polarized Proton Status January 25, 2011 Vincent Schoefer.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
1 EDM Calculations ASM 215 EDM CALCULATIONS. 2 EDM Calculations HORIZONTAL DISTANCE MEASUREMENT n In plane surveying, the distance between two points.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Space Charge meeting – CERN – 09/10/2014
Accelerating Polarized Protons Mei Bai Collider Accelerator Department Brookhaven National Laboratory PHNIX Focus, Feb. 24,
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Nov. 17, 2005Fermi Lab AP Seminar AC Dipole Based Diagnostics Mei Bai, C-A Department.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
AGS pp Status Feb. 17, 2015 Time Meeting Haixin Huang.
FLS2006 Workshop, HamburgEduard Prat, DESY DISPERSION MEASUREMENT AND CORRECTION IN THE VUV-FEL (FLASH) Winni Decking, Torsten Limberg, Eduard Prat 37th.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Plans for Polarized Beams at VEPP-2000 and U-70 Yu.Shatunov BINP, Novosibirsk P S IN 2006.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
RHIC Retreat 2006, July 10-12, N.Malitsky. Model update and progress Model Update and Progress L. Ahrens, K. Brown, A. Luccio, N. Malitsky, V.Ptitsyn,
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Advanced Optics Control, CERN, Masamitsu Aiba, PSI Recent optics measurements at SLS M. Aiba, M. Böge, Á. Saá Hernández, D. Mayilyan and.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
TBT Data & Lattice Measurement for Recycler Ming-Jen Yang December 17, 2014.
Toward an Improved Model of the Fermilab Booster Synchrotron A. Drozhdin, J.-F. Ostiguy and W. Chou Beam Physics Department Introduction The Booster is.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Operational experience of the AGS eIPMs
Sextupole calibrations via measurements of off-energy orbit response matrix and high order dispersion Nicola Carmignani.
TMCI Observations in AD
Acceleration of Polarized Protons and Deuterons at HESR/FAIR
Jeffrey Eldred, Sasha Valishev
Startup program, 1 Machine setup (i.e. R:\Controls\matlab\acceleratorcontrol\docs\SRSetupUsingMatlab_ALS.doc) Bergoz BPM/orbit checks: monbpms, correct.
Monday :20 beta beat corrections during squeeze for flat machine finished Afterwards fixing issues at injection: BPM rephrasing for B2 solved.
Monday 24 October hours of 25ns MD
Optics Measurements in the PSB
Transverse instability in the AD?
Wednesday h18: 228b fill lost just before start of ramp.
Main Linac Beam Optics and Tolerances
Report on Electron Polarization Study
Presentation transcript:

AGS Polarized Proton Status January 25, 2011 Vincent Schoefer

Current performance 65% polarization with 1.4e11 intensity Emittances ~18  both planes at AGS flattop (jump quads off) – This is still large horizontally, even coming out the Booster

Tune jump quads – Calculation of jump times: Leif Gauss clock calibration scan: Leif Measurement of vertical intrinsic timing: Vincent – Effect on emittance (blowup and scraping) Coherence length and emittance blowup: Mei Closed orbit deviations from tune jump quads: Woody Horizontal scraping on J10 at AGS flattop: Vincent Momentum scraping at transition: Leif, Vincent – What are the ‘best yet’ times?

Optics Optics measurement and correction – High injection tune: Vincent – Survey results: Vincent ORM: Vincent Harmonic response: Leif – AGS model calibration: Nick, Francois – BtA model calibration: Nick, Keith Vertical BPM offsets at 9  – via orbit steerer drive term: Woody – via harmonic amplitude response to tune: Leif