H-jet Run at Injection A. Dion, H. Huang, A. Poblaguev, A. Zelenski, and YM.

Slides:



Advertisements
Similar presentations
E.C. Aschenauer 2013/03/132 polarisation for Blue and Yellow t o -calibration underway minimal impact on polarization, makes A N more stable  should.
Advertisements

REPHASING TESTS DURING THE TWO BEAM IMPEDANCE MD P. Baudrenghien, J. Noirjean, T. Mastoridis 10/26/2012LSWG meeting 1 Oct 7 th,18:00 – Oct 8 th, 04:00.
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
E.C. Aschenauer Phil Pile Meeting 2012/03/202 polarisation at injection Blue and Yellow Caveat: only first round of cleaning up noise in polarimeters.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
Yousef Makdisi PSTP2011 September 12-18, 2011 Proton Polarimetry at the Relativistic Heavy Ion Collider and Future Upgrades Yousef I. Makdisi Brookhaven.
The polarized hydrogen jet target measurements at RHIC Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group: I. Alekseev, E.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
DIS 2006 Tsukuba, April 21, 2006 Alessandro Bravar Proton Polarimetry at RHIC Alekseev, A. Bravar, G. Bunce, S. Dhawan, R. Gill, W. Haeberli, H. Huang,
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
1 Polarimeter for dEDM experiment G. Venanzoni Laboratori Nazionali di Frascati for the dEDM collaboration Workshop on Flavour in the era of LHC – Cern.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Systematic Errors Studies in the RHIC/AGS Proton-Carbon CNI Polarimeters Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group:
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
K.O. Eyser --- Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region -1- Absolute Polarization Measurement at RHIC in the.
Relative Polarization Measurements of Proton Beams Using Thin Carbon Targets at RHIC Grant Webb Brookhaven National Laboratory Sept 14, 2015PSTP20151 for.
Spin Injection June 5, 2015 APEX Meeting H. Huang, P. Oddo, V. Ptitsyn.
» Absolute Polarimetry of Proton Beams at RHIC« Oleg Eyser for the RHIC Polarimetry Group International Workshop on Polarized Sources, Targets and Polarimetry.
Unit 12: Part 1 Physical Optics: The Wave Nature of Light.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
02/18/09 Dump line beam steering and beam losses (Sept 26, 2008 studies) Xiaowei Dong & John Carwardine (Argonne) TTF/FLASH 9mA meeting, 23 February 2009.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
POLARIMERTY STATUS REPORT FOR RUN-11 November 18, 2010 RSC meerting I. Alekseev b, E. Aschenauer a, G. Atoian a, A. Bazilevsky a, A. Dion a, H. Huang a,
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
The RHIC C-CNI polarimeter upgrade for 2009 Run. RSC Meeting, December 16, 2008 Anatoli Zelenski for polarimeter upgrade group. T.Russo, T.Curcio, D.Lehn,
H-Jet polarimeter status report Yousef Makdisi RSC 07/28/06.
1/30/2016Douglas E. Fields for the p+C CNI collaboration 1 Test of Small Angle Elastic Proton-Carbon Scattering as a High Energy Proton Beam Polarimeter.
Run6 CNI Analysis: Concluding Remarks and Summary of Systematic Uncertainties A.Bazilevsky For RHIC CNI group RHIC Spin Collaboration Meeting November.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
E.C. Aschenauer STAR Spin PWG 2012/03/222  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
versus Proton spin vector Double-spin helicity asymmetry: N ++ / L ++  N +  / L +  N ++ / L ++ + N +  / L +  1 P1P2P1P2P1P2P1P2 A LL  Single-spin.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region September 30, 2006 RHIC Spin Collaboration Meeting RIKEN, Wako, Japan.
1 Data taking & ONLINE analysis at MCR Hiromi Okada June, 2008.
APEX RUN-12 APEX Schedule Feb 22, 2012 Injection 8am 11pm IP transfer matrix Tepikian, Ptitsyn If needed: Beam Scrubbing Blaskiewicz, Montag, Huang Injection.
RHIC Polarimetery A.Bazilevsky for RHIC Polarimetry group RHIC Spin Collaboration Metting April 10 (Friday), 2009.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
ApEx needs for CeC PoP Experiment December 11, 2015.
E.C. Aschenauer RSC - Meeting 2012/03/232  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
Mitglied der Helmholtz-Gemeinschaft Summary of the target session of the IEB Workshop June 19, 2015 | Alexander Nass.
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
APEX RUN-11 APEX Schedule Planned Feb. 23, pm ~ 3 ramps 8am 12x12 store Physics store Beta* unsqueeze +s* adjustment GRD+team 6x6 store AC dipole.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Meson Production Efficiencies
Programme for VDM measurements Friday Oct 15
Run5 Analysis of RHIC-pC Polarimeter
Presentation transcript:

H-jet Run at Injection A. Dion, H. Huang, A. Poblaguev, A. Zelenski, and YM

What was done The Jet ran quite well with near maximal intensity 4700 counts. Started at noon with the Blue beam and adjusted the jet timing so that the elastic scattering banana falls on the correct time / Energy curve. Within 1 hour decided to inject the Yellow beam and separated the two my ~ 3 mm. By 5:30 pm we up and running. Took 1-hr runs with polarimeter runs with jet running till we realized that this may corrupt the data (increased bkgnd). Shifted to two hour runs with Polarization measurements with DAQ off. Two-beam store was dumped around 11 pm. Ran till 8 am with single blue beam.

Luminescence View of the beams and Jet

Running with single Beam Good background Prompts approaching the data near 3-4 MeV recoil energy The bunch length is much wider that we have seen at 100 or 250 GeV

Run with Two beams Running with two beams separated by 3 mm vertically. Adjusted beams vertical position for uniform acceptance Background higher

From the online monitoring The bananas for Blue and Yellow beams same scale. Bunch length is significantly 250 GeV

Results (not ready) We need to adjust our cuts compared to what we have been using A quick look indicates significant fluctuations from short 1-2 hr. runs. Need to inspect and fine tune our cuts. Depending on our (energy) cuts we think we should have enough data for a 5% measurement My only suspicion is whether the beams were properly centered on the jet Stay tuned.