LHCb CO 2 cooling meeting Burkhard Schmidt – May 20, 2015 1.

Slides:



Advertisements
Similar presentations
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Advertisements

Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 31/8/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
 Based on 2+2 Roman Pot Stations on each side of ATLAS at ~ 240 m from the Interaction Point  Aim in Run 2 at measuring the total cross section and.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Towards the Work-package with LHCb for the LHCb upgrade DT-LHCb coordination meeting 13 January 2015.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
DT-LHCb coordination meeting 18 April 2016
Feedback on transfer line sizing and flow calculations for UT
IT-4189 Supply and installation of a cryogenic distribution system
Microfluidic devices for thermal management
Hollow e- lens, Cryogenic aspects
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
MAUVE CO2 cooling review
update on UT cooling system
LHCb & EYETS
TEST PLANS for HL LHC IT STRING
Status of CO2 Cooling tests at CERN for Pixel phase 1
Presentation transcript:

LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,

TRACI V1 for UT tests The TRACI V1, originally build for the LHCb VELO, has been re-commissioned. – The cooling power is W, depending on the set temperature (-20 o C to -10 o C). It has been shipped to Milano and arrived finally yesterday. – A handle got slightly bend and tests on tightness need to be done. – It will allow our Milano colleagues to make thorough tests of up to 2 staves.

Development and definition of evaporator systems I.Investigation of a micro-channel substrate based evaporator 1.Commissioning of the TRACI AIDA cooling station for the test-purposes √ 2.Use Snake 1for initial micro-channel performance studies √ 3.Preparation of Snake2 prototype micro-channel substrates and √ 4.Soldering /clamping of connectors to the micro-channel substrate ? 4.Performance measurements with Snake 2 ?  Work done by Pawel, Jan et al.  we have some delay (maybe not too critical) 3

4 New Building Projects at Point 8 A B C D A B C New LHCb Control Room ( ~ 220 m 2 ) + Meeting Room (~ 140 m 2 ) + Offices (~ 80 m 2 ) + new LHC Cryogenic Control Room (~ 55 m 2 ) + Technical rooms (~ 120 m 2 ) - 3 floors (lift 5-6 people) New LHCb Storage Hall – 112 m 2 – crane 7.5 t (for replacing 156 building at Meyrin) New LHCb Assembly Hall & Storage - roughly 485 m 2 – crane 30 t (for replacing hall 156) D Location of the future LHCb servers in containers. E.PEREZ-DUENAS & D.LACARRERE 6 June 2013

Status and Plans Cooling specifications: Still waiting for an update of VELO specs. Comments given to updated UT specs.  Let us try to get this out of way asap. Development and definition of evaporator systems: Work in progress.  Check today where we stand with respect to the work plan Space in building 20-R-028 now available for CO 2 cooling tests, 20-R-024 has also been freed meanwhile. P&ID document & functional analyses: Work will start when basic issues related to the evaporators are clarified, hopefully by June.  The aim is still to have the cooling EDR in October 5

Backup 6

2014 – Q34: Requirement document by VELO and UT 2015 – Q12: Development and definition of evaporator systems – Q23: Concept P&ID Preliminary sizing Control philosophy Redundancy approach – Q3: P&ID document & functional analyses – Oct 2015: Cooling EDR – Q4 start of design 2016 – Q123 Detailed 3D design of hardware Evaporator, junction box, transfer line, cooling plants – May 2016: Cooling PRR junction box, transfer line – Oct 2016: Cooling PRR cooling plant. – Q4 Production of transfer line and junction box 2017 – Q1 Transfer line and junction box installation (EYETS, 19 weeks) – Q1234 Production of the cooling hardware 2018 – Q12 cooling system installation in UXA (preferred place: A-side alcove) – Q234 Cooling system over junction box commissioning – Q3 start of LS2 – Q4 Removal of current VELO and TT 2019 – Q2 Upgrade VELO and UT installation – Q34 Detector commissioning with cooling – Q4 end of LS2 Updated Schedule Comments:  The schedule is driven by – the LHC schedule, – the LHCb upgrade plan and – the availability of resources in PH-DT: Design effort in 2015/2016 Construction 2017 Installation and start of commissioning in

Cooling plant location Prefered Location: Alcove PZ85 (VELO side) – About 25-30m 2 are available and easy to access. – Area needs to be equipped with power (EXD, EBD, ESD), network, primary cooling – poor ventilation  Despite some drawbacks, this seems to be the best option. – Additional advantage: The transfer line towards the detector would be straight. Passing the shielding wall looks not too complicated. 8

Development and definition of evaporator systems II.Design and test of a micro-channel substrate based evaporator for the LHCb VELO 1.address the issues in relation to interconnection and distribution: The design of the evaporator needs to be done from and to the manifold. Arc-welding of pipes between the manifold and the detector modules is not possible ones the electronics are mounted on the module 2.Proper dimensioning of the in- and outlets connecting the detector to the manifold 3.critical safety aspects (the VELO is operated in the secondary LHC vacuum) Safety issues in case of micro-leaks need to be addressed in a coherent way, taking into account that the advantages and disadvantages of safety valves, and the maximum vacuum pressure tolerable for the thinner RF-foil.  Hopefully more input today … 9