MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Lead Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab MICO Meeting January 19, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Design of the MICE RF Cavity Module :Status of the module designModule flange sealing options Steve Virostek Lawrence Berkeley National Lab MICE
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Hall D Target Design Status Jim Fochtman- February 22, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Status of MICE Coupling Coil Magnets D. Li and M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory February 16, 2011 MICE CM29-Rutherford.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
CRYOMODULE FINAL ASSEMBLY
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January 28, 2014

Prototype Coupling Coil Cooling Circuit Design Page 2 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Coupling Coil Cooling Circuit Status & Design Assembly Interfaces Integration Discussion

Prototype Coupling Coil Cooling Circuit Design Page 3 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 CC – Cooling Circuit Status 3-D models and 2D drawings complete Drawings currently being reviewed Ready for procurement/fab. early February

Prototype Coupling Coil Cooling Circuit Design Page 4 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 CC – Cooling Circuit Assembly

Prototype Coupling Coil Cooling Circuit Design Page 5 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 CC – Cooling Circuit (rear detail)

Prototype Coupling Coil Cooling Circuit Design Page 6 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Cooling Circuit – Upper Assembly Viewed from the bottom, back Viewed from the top, front

Prototype Coupling Coil Cooling Circuit Design Page 7 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Cooling Circuit – Lower Assembly Flange welded to upper reservoir Bellows supports/ adjusters, before welding

Prototype Coupling Coil Cooling Circuit Design Page 8 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Cooling Circuit – Cryocooler Head Condenser head, w/shroud Cernox sensor & feedthru installed

Prototype Coupling Coil Cooling Circuit Design Page 9 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Cooling Circuit Assembly Concept Lower assembly welded to Upper reservoir before installing thermal shielding and before installation into cryostat

Prototype Coupling Coil Cooling Circuit Design Page 10 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Cooling Circuit Assembly Concept Upper assy welded to lower assembly bellows (adjusted for thermal shrinkage) Requires external support (support rods thru cryocooler vacuum sleeves to hold in place, for instance)

Prototype Coupling Coil Cooling Circuit Design Page 11 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Cooling Circuit Assembly Concept HTS leads installed

Prototype Coupling Coil Cooling Circuit Design Page 12 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Cooling Circuit Assembly Concept Turret upper thermal shield box installed

Prototype Coupling Coil Cooling Circuit Design Page 13 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Cooling Circuit Assembly Concept Place upper turret Flange weld Possible extraction of upper assembly temporary supports before port is covered

Prototype Coupling Coil Cooling Circuit Design Page 14 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Cooling Circuit Assembly Concept

Prototype Coupling Coil Cooling Circuit Design Page 15 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Cooling Circuit Assembly Concept Cryocoolers installed

Prototype Coupling Coil Cooling Circuit Design Page 16 Dan Cheng- Lawrence Berkeley National Lab – January 28, 2014 Integration Questions How should the assembly(ies) will be sent? What qualifications (pressure, vacuum tested)?