1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.

Slides:



Advertisements
Similar presentations
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Advertisements

Transparent Re-alignment of the Diamond Storage Ring M. Apollonio – Diamond Light Source Ltd ESLS – XXII Workshop, ESRF Grenoble, November 25 th /11/2014M.
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Vibrating Wire R&D for Magnet Alignment Animesh Jain, NSLS-II Project The alignment tolerance for a string of magnets.
Educated Spray A Geometry Thomas Furlong Prof. Caroline Genzale August 2012.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
THE ALIGNMENT OF THE LHC DURING THE SHUT-DOWN D. Missiaen.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
GG 313 Geological Data Analysis # 18 On Kilo Moana at sea October 25, 2005 Orthogonal Regression: Major axis and RMA Regression.
System Design and Analysis
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Math for CSLecture 11 Mathematical Methods for Computer Science Lecture 1.
Math for CSLecture 11 Mathematical Methods for Computer Science Lecture 1.
1 Institute of High Energy Physics 13/09/2010 Comparison and Study in Measurement Accuracy of Height Difference between Laser Tracker and Level Men LingLing.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet Design Workshop: Magnet Design and Analysis Charles Spataro, NSLS-II Project NSLS-II is a new 3Gev synchrotron.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Introduction to Systems Analysis and Design Trisha Cummings.
Alignment and Beam Stability
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
Critical Points Layouts For Storage Ring and Beamlines Ken Chow March 14, 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Studies on Lattice Calibration With Frequency Analysis of Betatron Motion R. Bartolini DIAMOND Light Source Ltd FMA workshop, Orsay, LURE, 1 st and 2 nd.
BROOKHAVEN SCIENCE ASSOCIATES 0 Top-Off Safety Yongjun Li ASAC Meeting October 22, 2009.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
CSE554AlignmentSlide 1 CSE 554 Lecture 8: Alignment Fall 2013.
How Errors Propagate Error in a Series Errors in a Sum Error in Redundant Measurement.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
ILC Main Linac Alignment Simulations John Dale 2009 Linear Collider Workshop of the Americas.
Topic 4 - Database Design Unit 1 – Database Analysis and Design Advanced Higher Information Systems St Kentigern’s Academy.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Emittance Tuning Simulations in the ILC Damping Rings James Jones ASTeC, Daresbury Laboratory.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CEPC DA due to magnets' error Sha Bai, Dengjie Xiao, Yiwei Wang, Huiping Geng, Dou Wang, Tianjian Bian, Feng Su, Jie Gao The first IHEP-BINP CEPC Accelerator.
Company LOGO Technology and Application of Laser Tracker in Large Space Measurement Yang Fan, Li Guangyun, Fan Baixing IWAA2014 in Beijing, China Zhengzhou.
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
1 Research on laser tracker measurement accuracy and data processing Liang Jing IHEP,CHINA
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
CSE 554 Lecture 8: Alignment
THE APPLICATION OF TRACKER WITH SA IN ALIGNMENT OF HIRFL-CSR
Orbit Control For Diamond Light Source
Workshop on Tau-Charm at High Luminosity
IWAA2014, 13th – 17th October 2014, IHEP, Beijing
Preparing the SPS complex alignment for future LHC runs
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
LCLS Undulator Fiducialization
Towards a common mechanical interface
The Storage Ring Control Network of NSLS-II
Objective of This Course
Alignment of the first two magnet system modules of Wendelstein 7-X
ILC Main Linac Alignment Simulations
High Precision Magnet Production for NSLSII at IHEP
Overall Considerations, Main Challenges and Goals
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit Transformation C. Yu

2 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Outline Introduction Principle Application in SSRF Application in NSLS-II More Consideration Conclusion

3 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China What’s Smoothing a technique to achieve accurate relative alignment of components a main concern of accelerator alignment The reason for smoothing: limitation of survey control network slow floor movement tight relative alignment tolerance loose global alignment tolerance Introduction Smoothing techniques cubic spline functions (DESY) First Principle Component analysis (APS) Based on best fit transformation

4 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China What’s best fit transformation Mathematically, take out the overall translation or rotation between reference and as-built coordinate systems Smoothing Requirement Reference value of fiducials As-built value of fiducials Check the as-built location WRT reference and can be realized by best fit transformation Best Fit Transformation Benefits Easy to understand Readily available in software Handily available with regard to reference and as-built data And more From Spatial Analyzer User Manual 3 translation, 3 rotation and 1 scale parameters

5 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China How to use it for one set of girders or magnet groups? Obtain reference data Obtain as-built data Perform best-fit transformation Compare the residuals of fiducials Decide if the beam orbit is smooth according certain criteria. What has been done by best-fit transformation is taking out of the rotations and translations of as-built values with respect to global coordinate system and showing the deviations relatively. Repeat many times to check the whole ring Smoothing Based on Best Fit Transformation-Basics Layout of C08G2 and C08G4 girder fiducials and best- fit deviations of NSLS-II Storage ring Comparison of C08G2 and C08G4 girder fiducials before and after best-fit transformation.

6 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China In practice, 3 adjacent girders are used Overlap between cells is important. The number of best fit transformation equals to the number of girders. It’s important to have accurate as-built survey data In order to describe the deviations clearly and make them easy to understand, local frames for each girder should be established. The fiducials should be sorted in each group according to their location with respect to beam When a girder is determined to be adjusted, its upstream and downstream girders will be used to transform the as-built survey data to reference data The method is not limited to circular accelerator. Smoothing Based on Best Fit Transformation-More

7 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Application in SSRF (1) SSRF storage ring 432m Initial alignment 2007 Re-alignment in 2012 The best-fit transformation based smoothing technique was initialized. Sextupoles and quadrupoles centers were used during best- fit transformation process. Girders were rotated based on the roll angle Multiple iterations (Realized by MP of Spatial Analyzer) to minimize the residuals

8 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Application in SSRF (2) Computed adjusted amount in horizontal directionComputed adjusted amount in vertical direction The good Circumference error >10 mm ignored. Most of the adjustment below 300 micron First attempt to apply this innovative idea, alignment result was excellent The bad 7 beam lines of phase 1 had to be re- adjusted

9 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Application in NSLS-II (1) Storage ring ~791.5m Girder alignment for ~1 year No final survey before commissioning Epoch 7 survey during shutdown in May 2014 shows deviations of components. Smoothing based on best fit transformation of girder fiducials were used.

10 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Application in NSLS-II (2) Steps: Perform comprehensive survey for girder of interested and its upstream and downstream ones. Compute the measured relative location of 3 girders. Perform a best-fitting between the measured and reference coordinates to see if there are large deviations. As a rule of thumb, the fitting RMS in both X and Y direction should be below If the fitting result is larger than 0.05, the downstream fiducials of upstream girder and upsteam fiducials of downstream girder will be used to establish girder adjustment control network. The nominal coordinates of those 4 fiducials will be used to best-fit and transform the measured point group. The measured point group will be used as survey control network and the reference coordinates will be used as alignment goal. “DX Goal” and “DY Goal” shows the goal of adjustment.

11 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Application in NSLS-II (3) The fiducial deviations after best-fit transformation among all 3 adjacent girders. Fiducial best-fit result Each fiducial will be shown 3 times RMS deviation in X and Y direction is mm and mm respectively Work has been done 22 girders which had been checked 8 girders had been adjusted The maximum adjustment amount is below 300 micron.

12 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Application in NSLS-II (4) The girder center deviations before and after smoothing. Global deviation All girder centers WRT epoch 7 survey Still not a smooth curve, but relative girder alignment is well within tolerance. Nomenclature “O” means original survey “C” means it has been checked “A” means it has been aligned. Lessons learned Girders should be checked in a consecutive manner

13 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Discussions The best-fit transformation based smoothing technique is easy to understand and use Its application is successful for the partial alignment of NSLS-II project. It also yielded excellent alignment quality when it was applied in SSRF for a whole machine re-adjustment during 2012 shutdown. The best-fit transformation based smoothing technique can tackle beamline alignment constraints by avoid moving girders around straight section unless it’s absolutely necessary. By surveying and adjusting the storage ring cell by cell, good storage ring alignment can be maintained. This is important for a new machine as no major shutdown will be necessary at the early stage of running due to large floor settlement.

14 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Summary Best-fit transformation is a basic technique for accelerator alignment in the current time, but smoothing seems a little bit fancy as it usually associates with different language, such as Fourier function, cubic spline or Principal Curve Analysis etc. But the application of best-fit transformation makes smoothing a lot easier and any surveyor can do it. It’s not only a great tool for partial and whole alignment of an accelerator at the beginning of running a machine, but also a possible solution for long term maintenance of storage ring when more constraints present. With dedicated script, the whole smoothing process can be fully automated and high efficiency is expected.

15 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Acknowledgment The author would like to thank all the staff who involved in the NSLS-II and SSRF alignment activities.

16 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Thanks for your attention!