What are they and how are they calculated? May 2015.

Slides:



Advertisements
Similar presentations
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Advertisements

GFOAz May 11, 2007 The ABC’s of Municipal Financing.
City of South Burlington City Council Adopted January 12, 2013 FY 2014 Budget - Keys to Financial Success Prepared by Sandy Miller, City Manager and Bob.
Commercial-type activities of a government, such as public utilities:  Water and sewer authorities—either fully independent or component units of local.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
Water Rates Utility Rates & SDCs Presentation to the West Linn City Council October 5, 2009.
Copyright Rehmann Robson Pennfield Charter Township Water and Sewer Utilities Rate Study.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
1 Department Department of of Public Utilities Presentation of Study Results August 2006.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
Scope of Work  Review financial performance  Recommend rate adjustments  Prepare grant or loan applications.
Fairview Township, York County May 28, 2015
1 Storm Water Utility City of Durand. 2 Storm Water Runoff Rainwater flows across streets, parking lots, driveways, lawns Pollutants are picked up by.
Alliance Management Group Tax Year 2012 Update 1.
2014 Budget Department Presentations Infrastructure Funding Options.
Service Availability Policy and Charges 1 Water & Wastewater Reference Manual.
Contributions In Aid of Construction Mark Beauchamp Business & Finance Workshop Utility Financial Solutions
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
City of Houston Long Range Financial Management Task Force City Financial Overview Part I August 29,
Overview of System Development Charges Presented to the Ad Hoc Committee on Large Diameter Water Mains by Chris Cullinan, Acting CFO January 8, 2014.
Additional FTE - 11 Increase in overall Personnel – 5% (compares to 8% in FY2015, 7% in FY2014, 2% in FY2013) $87,225 in on-going operating $1,226,099.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
City of Kyle, Texas City Manager’s Presentation of Fiscal Year Proposed Budget August 1, 2012.
Annexation Issues in Eden A History of Annexation in Eden Since 1968 NC Annexation History Current Annexation Issues in Eden January 2010.
The Annual Analysis of Tax Bill Changes. Prepared by the Bedford Board of Assessors December 30, 2013.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
1.Projects 2.Rates 3.Projects and Rates Today’s Presentation:
Commissioners’ Briefing on Front Foot Benefit and House Connection Rates November 16, 2011.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Upcoming Rate Case February Department of Waterworks Owns and manages Indianapolis Water. Bi-partisan seven member Board of Directors oversees department.
Nassau-Amelia Utilities FY 2008 Utility Rate Study Presented by: Andrew J. Burnham July 9, 2007 Nassau-Amelia Utilities.
Cornelius Candidate Projects For Funding Total Candidate Projects$ 22 million –Rail Improvements ($10 million) –Local CIP Projects NC-115 upgrades ($ 1.9.
Town of Yountville B ARTLE W ELLS A SSOCIATES Independent Public Finance Advisors Water and Wastewater Rates Prop. 218 Hearing February 15, 2011.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
First Quarter 2013 Earnings Conference Call April 18, 2013.
City of Palo Alto Utility Rate Changes FY 2013 Facility Managers’ Meeting August 16, 2012 Ipek Connolly, Senior Resource Planner.
City of Twin Falls 2015 Fiscal Year City Manager’s Recommended Budget July 28, 2014.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Public Infrastructure Funding Request Tax Increment Financing (TIF) Special Assessments.
1 CITRUS COUNTY Board of County Commissioner’s Meeting August 25, 2015.
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
Portugal Cove - St. Philip’s
City of Petersburg Water and Wastewater Rates
Storm Water Utility City of Durand.
Wastewater Fee Increases
League of Wisconsin Municipalities Urban Policy Forum June 8, 2017
Water and Wastewater Rates
Water & Wastewater Capacity Charge Work Shop
City of Madras System Development Charges
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
2017 Fee Calculation Methodology – A Case Study
Final Rate Study Findings
City of Sisters, OR 2017 Water & Sewer Rate Study
City of Petersburg Water and Sewer Rates April 26, 2011
Joshua Basin Water District Draft Findings & Rate Scenarios
Large User True-up Process
System Development Fees
Water & Sewer Rate Study Presented by: Chris Gonzalez, Project Manager
City of Rehoboth Beach Water and Wastewater Financial and Rates Review
FY 14 Budget Presentation 20 May 2013
SEWER DEPARTMENT BUDGET WORKSHOP
City of Sunrise Wastewater Reuse Program
2018 Water/Wastewater Rate Study and Financial Forecast
Presentation transcript:

What are they and how are they calculated? May 2015

What are System Development Charges (SDCs)? Upfront charge that a new customer pays for investment in system capacity that will serve the customer System capacity is typically added in large increments over time Covers the cost of both existing water and sewer treatment and distribution/collection facilities as well as those under construction and scheduled in the 10 Year Capital Improvement Plan (CIP) SDCs are calculated separately for water and sewer

What SDCs are Not SDCs are not repair and rehabilitation projects SDCs are not projects that provide no system wide benefit (example single neighborhood projects)

Calculating SDCs SDC = Cost of Capacity per Gallon x Estimated Gallons of Capacity Needed to Serve Customer Calculated for 5/8” meter Larger meters require more capacity

Calculating SDCs Key Calculations Cost of Capacity Available Capacity Estimated Cost Per Gallon of Capacity Full Cost of Capacity per Equivalent Residential Unit (ERU) (5/8” meter) Debt Service Credit

Cost of Water Capacity Includes Water Treatment & Water Distribution: Existing water treatment facilities – Sweeney, Nano, Monterey Heights Major water treatment expansion and upgrade construction in progress Major water treatment expansion and upgrade projects in 10-year CIP Existing backbone water distribution systems Major water distribution line extension construction in progress Major water distribution line extensions in 10-year CIP Excludes repair and rehabilitation projects and projects that provide no system wide benefit (example single neighborhood projects)

Cost of Sewer Capacity Includes Sewer Treatment & Sewer Collection: Existing sewer treatment facilities – Northside & Southside Major sewer treatment expansion and upgrade construction in progress Major sewer treatment expansion and upgrade projects in 10-year CIP Existing backbone sewer collection systems Major sewer collection construction in progress Major sewer collection projects in 10-year CIP Excludes repair and rehabilitation projects and projects that provide no system wide benefit (example single neighborhood projects)

Cost of Capacity

Cost of Capacity (continued)

Maximum Daily Water Capacity Each Water Treatment Plant has a Maximum Daily Capacity expressed in million gallons per day (MGD)

Average Daily Water Capacity Treatment Facilities Distribution System The maximum daily treatment capacity is assumed to be 1.5 times the average daily capacity Estimated line loss factor is 16%; therefore 84% of distributable water flow is estimated to be available Average Daily Capacity of MGD ÷ 1.5 x 84% = MGD Estimated line loss factor is 16%; therefore 84% of distributable water flow is estimated to be available Average Daily Capacity of MGD x 84%

Cost of Water Capacity Total Cost of Water Capacity per gallon = $11.46 Treatment Facilities: $212,360,318 ÷ 23,410,000 gallons = $9.07 per gallon Distribution Facilities: $83,791,786 ÷ 35,110,000 gallons = $2.39 per gallon Per gallon cost used for current rate $11.77 Total Full Cost of Capacity per Equivalent Dwelling Unit (ERU) = $4,584 Treatment Facilities: $9.07 per gallon x 400 gallons = $3,628 Distribution Facilities: $2.39 per gallon x 400 gallons = $956 Standard level of service is assumed to be 400 gallons per day (per NC Administrative Code 15A NCAC 18C.0409) Full cost used for current rates $4,708

Water Debt Service Credit Because most of our facilities are debt funded and debt payments are recovered from user rates, Full Cost of Water Capacity is reduced by Debt Service Credit to calculate Water SDC Debt Service Credit represents the net present value of the principal payments on the cost of capacity Net present value is the price the market would pay today for a stream of payments to be received in the future SDC policy uses All-In True Interest Cost of the most recent bond sale for net present value calculation Most recent bond sale was 2014, with interest rate of 3.45% Debt Service Credit = $2,863, using the 2014 bond interest rate

Water Debt Service Credit An average interest rate could be used to stabilize fees from one bond sale to the next: Most recent bond sale was 2014, with interest rate of 3.45% Bonds issued in 2011 has interest rate of 3.83% Bonds issued in 2008 has interest rate of 4.58% Average interest rate 3.95% Debt service credit using average interest rate = $2,665

Water System Development Charge

Maximum Daily Sewer Capacity Each Sewer Treatment Plant has a Maximum Daily Capacity expressed in million gallons per day (MGD)

Average Daily Sewer Capacity Treatment Facilities Collection System The maximum daily treatment capacity is assumed to be 1.5 times the average daily capacity Estimated level of infiltration and inflow (I&I) is 19.8%; therefore 80.2% of capacity is customer generated Average Daily Capacity of MGD 32 MGD ÷ 1.5 x 80.2% = Estimated level of infiltration and inflow is 19.8%; therefore 80.2% of capacity is customer generated Average Daily Capacity of MGD 32 MGD x 80.2% = 25.66

Cost of Sewer Capacity Total Cost of Sewer Capacity = $14.50 per gallon Treatment Facilities: $176,219,245 ÷ 17,110,000 gallons = $10.30 per gallon Collection Facilities: $107,670,294 ÷ 25,660,000 gallons = $4.20 per gallon Per gallon cost used for current rates $ Difference attributed to higher I&I. Total Full Cost of Capacity per ERU= $6,090 Treatment Facilities: $10.30 per gallon x 420 gallons = $4,326 Collection Facilities: $4.20 per gallon x 420 gallons = $1,764 Standard level of service is assumed to be 420 gallons per day (120 gallons per NC Administrative Code 15A NCAC 02T.0114 x 3.5 bedrooms per NHC Tax Office) Full cost used for current rates $6,031

Sewer Debt Service Credit Debt Service Credit using most recent bond interest rate = $3,810 Debt Service Credit using average bond interest rate = $3,541

Sewer System Development Charge

Calculated System Development Charges (5/8”)

Calculated SDCs by Meter Size

Projected Revenues Change Using Most Recent Bond Interest Rate -$(429,400)

Projected Revenues Change Using Average Bond Interest Rate $101,700

How CFPUA SDCs Compare with Other Public Utilities

Notes for Comparisons Rocky Mount includes a Capacity Fee and a Main Fee for 3/4” and 5/8” meters City of Raleigh includes an Acreage Fee and a Nutrient Fee Greenville Utilities Commission includes a Capacity Fee and a Sewer Acreage Fee City of Jacksonville includes a Facility Charge Town of Navassa includes an Impact Fee for 3/4” water meter and Impact Fee for single family dwelling City of Greensboro includes Capacity Use Fees for 5/8” meters OWASA includes a Service Availability Fee for a 1,701-2,400 square foot home PWC of Fayetteville includes a Facility Investment Fee for 5/8” meters Town of Cary includes a Development Fee for a 1,701-2,400 square foot home City of Durham includes a Capital Facility Fee for 5/8” meters Carolina Beach has impact fee of $2.57 per heated sq ft($1.285=water, $1.285=sewer); used 1,700 sq ft for comparison Brunswick County includes a Capital Recovery Fee and a Transmission Capital Recovery Fee for a 3 bedroom home Town of Wrightsville Beach includes a Utility System Impact Fee for 3/4” and 5/8” meters Brunswick Regional Water and Sewer includes an Impact Fee and Transmission Capital Recovery Fee City of Southport includes Impact Fees for a 3 bedroom home for sewer and Impact Fees for a 3/4” meter for water ONWASA includes an Impact Fee for a 3/4” meter

Staff Recommendation Staff recommends no change in SDCs for FY16 since current rates are at a level between the lower and higher result.