DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,

Slides:



Advertisements
Similar presentations
Strategic Planning Update For Board Meeting December 5, 2007.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Public Service Company of New Mexico
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
U.S. Energy Information Administration Independent Statistics & Analysis EIA Reporting Proposal: Balancing Authority Hourly Operating Information.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Peak RCCo Performance Metrics Draft –November 2013.
Eastern Interconnection States’ Planning Council – Current Issues Brian Rybarik Public Service Commission of Wisconsin (Executive Assistant to Commissioner.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, May 13th, :00 to 3:00 p.m. EDT.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Standards Review Subcommittee Update August 17, 2010.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
FERC Staff’s Report on Demand Response and Advanced Metering.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
NOVEMBER 18, 2014 / MILFORD, MA Mark Babula PRINCIPAL ENGINEER – SYSTEM PLANNING Project Update Eastern Interconnection Planning Collaborative’s (EIPC)
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Sector Caucus Nomination and SSC Selection Process.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
LNBA Subgroup: Avoided Transmission Value
Wind Management at MISO
Status of the Planning Working Group’s (PWG) Efforts
Reliability Assessment Committee Proposal TSS Meeting
Status Update for Reliability/Market Power Mitigation Assessment
Pseudo-tie business procedure
Market Rules Assessment Comparison of RTC & RTD - PJM
White Paper – Least Cost Electricity Procurement
Pseudo-tie business procedure
DER Growth Scenarios and Load Forecasts Working Group
New England’s Response to FERC’s RTO Order No. 2000
Presentation transcript:

DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director, Transmission Planning New York Independent System Operator IPTF/EGCWG Meeting November 25, 2013

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 2 DRAFT – FOR DISCUSSION PURPOSES ONLY Agenda  Background  System Model and Assumptions  Case Overview  Load Forecast  Energy Efficiency and Demand Response  Scheduled Area Interchange  Generation Dispatch  New Transmission Projects  New Generation Projects  Next Steps

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 3 DRAFT – FOR DISCUSSION PURPOSES ONLY Background  Initial EIPC Scope of Activities adopted Dec 2009  Non-grant work in 2013  Roll-up analysis of the Planning Authority’s (PA) plans to find possible changes that will improve their efficiency and effectiveness  Result of this analysis available for consideration in regional and inter-regional planning processes  Perform a defined number of scenarios/sensitivities against the roll-up model  Separate from the DOE-funded Gas-Electric System Interface Study

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 4 DRAFT – FOR DISCUSSION PURPOSES ONLY System Model  Steady-State Modeling Load-Flow Working Group (SSMLFWG) responsibilities:  Create and modify steady-state load-flow models Develop 2018 and 2023 summer peak models Prepare 2018 and 2023 roll-up documentation  Conduct steady-state load-flow analysis  Identify any reliability enhancements needed  Perform transfer analysis  Prepare roll-up report

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 5 DRAFT – FOR DISCUSSION PURPOSES ONLY System Model Assumptions  Case Overview  “Snapshot” of summer peak conditions (2018 and 2023)  Single demand level and generation dispatch  Based on 2012 ERAG MMWG powerflow case Uses an established annual base case development process  Models all existing and approved transmission elements above 161 kV PAs may add planned and proposed facilities  Secured for N-1

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 6 DRAFT – FOR DISCUSSION PURPOSES ONLY System Model Assumptions  Load Forecast  Based on 50/50 load forecast by each PA  Average NYCA annual growth rate of 0.96% through 2023  Economic growth and conservation modeled varies across the Eastern Interconnection (EI)  No expectation of growth consistency across EI

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 7 DRAFT – FOR DISCUSSION PURPOSES ONLY System Model Assumptions  Energy Efficiency and Demand Response  Energy Efficiency is generally included in each PA’s load forecast  Controllable demand-side management (interruptible loads) is generally not included in load forecasts  Uncontrolled demand-side management (peak shaving) is reflected where applicable

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 8 DRAFT – FOR DISCUSSION PURPOSES ONLY System Model Assumptions  Scheduled Area Interchange  Area Interchange is the net sale or purchase of power between Balancing Authorities  Long-term firm transmission service is modeled  Long-term is > 1 year in terms of transmission service  Interchanges are generally consistent with ERAG MMWG

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 9 DRAFT – FOR DISCUSSION PURPOSES ONLY System Model Assumptions  Generation Dispatch  Base case generation dispatch is set according to the internal assumptions and procedures of each PA  Generally uses economic dispatch or typical market dispatch for peak conditions

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 10 DRAFT – FOR DISCUSSION PURPOSES ONLY System Model Assumptions  New Transmission Projects  PAs have agreed to the following terms to describe the status of future transmission projects: Planned – The project has completed the respective PA’s planning process, including any applicable regional planning process approvals (for example, ISO or RTO approvals), but specific contractual obligations have not been committed to, or regulatory approvals obtained. Proposed – The project has been proposed but not yet completed the respective PA’s planning process now received applicable regional planning process approvals.

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 11 DRAFT – FOR DISCUSSION PURPOSES ONLY System Model Assumptions  New Transmission Projects  NYISO includes the following transmissions projects as: Planned – Firm transmission projects as listed in the 2013 Gold Book. Proposed – Transmission associated with proposed generation projects.

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 12 DRAFT – FOR DISCUSSION PURPOSES ONLY System Model Assumptions  New Generation Projects  PAs have agreed to the following terms to describe the status of future generation projects: Committed – The resource has completed the interconnection request process, or has obtained applicable transmission service. Proposed – The resource has been proposed and included in the planning process, but does not have applicable transmission service.

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 13 DRAFT – FOR DISCUSSION PURPOSES ONLY Gap Analysis  PAs analyzed their system to determine if the coordinated plan had any gaps such as:  Pre-existing system conditions  Adverse impacts due to neighboring PA plans  No gaps reported for NYISO

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 14 DRAFT – FOR DISCUSSION PURPOSES ONLY Inter-Area Enhancements  PAs examine projects near their borders and coordinate with neighbors on combined system enhancements to address any gaps identified.  Some potential enhancements are being considered by MISO.

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 15 DRAFT – FOR DISCUSSION PURPOSES ONLY Next Steps  EIPC Schedule  November 22, 2013 – Distribute report on roll-up cases, contingency results, transfer testing, and make cases available to those with CEII clearance  December 13, 2013 – EIPC Webinar on possible scenarios and roll-up case report  December 2013 to February 2014 – Regional meetings to discuss stakeholder feedback on possible scenarios and selection

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 16 DRAFT – FOR DISCUSSION PURPOSES ONLY Next Steps  EIPC Schedule  January 14, 2014 – Stakeholder input on possible scenarios due  February 26, 2014 – EIPC Webinar to discuss stakeholder feedback on scenario options and finalize scenarios to be studied in 2014  March 7, 2014 – Stakeholder final comments on the scenarios due to regional process  March 2014 – EIPC consideration of comments on scenario selection and final determination of scenarios

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 17 DRAFT – FOR DISCUSSION PURPOSES ONLY Next Steps  EIPC Schedule  March 28, 2014 – Final scenario descriptions and 2014 schedule posted  March 31, 2014 – SSMLFWG begins work on scenarios

© 2013 New York Independent System Operator, Inc. All Rights Reserved. 18 DRAFT – FOR DISCUSSION PURPOSES ONLY EIPC Supporting Activities  CEII: Continue to make EIPC models available to those who have complete the EIPC CEII process (based on regional clearance)  Website:  Continue to host the EIPC website  Review current EIPC website and recommended modifications as appropriate  Post material from both grant and non-grant EIPC activities

19 © 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT – FOR DISCUSSION PURPOSES ONLY