Calculations of Peak Load Contribution (PLC) AND Network Service Peak Load (NSPL) As of 1/1/2016.

Slides:



Advertisements
Similar presentations
National Town Meeting on Demand Response Focus on Pepcos Washington, DC Residential Smart Meter Pilot Program Presented By Steve Sunderhauf July 14, 2009.
Advertisements

RETAIL METERING WORKING GROUP Process for Performing VEE for AMS June 3, 2009.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
Automated Demand Response Pilot 2005/2004 Load Impact Results and Recommendations Final Report © 2005 Rocky Mountain Institute (RMI) Research & Consulting.
1 COST OF SERVICE OBJECTIVES & METHODOLOGY Utah Cost of Service Taskforce May 23, 2005 Dave Taylor.
Energy and Environmental Economics 1 Avoided Cost and E3 Calculator Workshops Energy and Environmental Economics, Inc. October 3, 2005.
Presented to the PWG Meeting of May 26, 2010
TIME OF USE RATES AT THE UNITED ILLUMINATING COMPANY Presented at: Connecticut’s Energy Future December 2, 2004 James D. Lundrigan Pricing Manager The.
1 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005.
Resource Adequacy Forecast Adjustment(s) Allocation Methodology
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
ANALYZING YOUR ELECTRIC BILL Bob Walker Met-Ed November 7, 2007.
Overview of Supplier Volume Allocation
1 City Light Rate Design- Review Presentation to Review Panel January 2013.
Overview – Non-coincident Peak Demand
RETAIL RATE REVISIONS August 1, 2015 Presented By:
SmartMeter Program Overview and Impacts for ESPs April 2007.
ERCOT Reliability Operations Subcommittee Meeting June 10, 2010 Austin, Texas AEP-Texas: Load Projections/Forecasting and Steady State Base Cases.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
Capacity Impacts of Energy Efficiency What We Know and What We Don’t Know March 11, 2014.
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
BGS-CIEP Rate - Energy Components (Continued)
Technical Conference on Net Metering Load Research Study November 5, 2014.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
ERCOT MARKET EDUCATION
0 The Basics –There are 4 POLR customer classes: Residential, Small Non-Res. (
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Retained Provisional CHWM Amounts and CDQ Adjustments March 14, 2014.
Load Research Status Presentation to the Load Research/Forecasting Working Group June 3rd, 2010.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
Rocky Mountain Power - Utah Workgroups I and II Load Research and Peak-Hour Forecasting Presented by UTAH INDUSTRIAL ENERGY CONSUMERS Salt Lake City, Utah.
1 Knowing Your Customers Better Through Load Research Presented By: Lawrence M. Strawn Senior Retail Pricing Coordinator Orlando Utilities Commission September.
1 Electricity Use in California: Past Trends and Present Usage Patterns Rich Brown May 2002.
1 UFE Workshop Sponsored by COPS October 19, 2004.
2016 Long-Term Load Forecast
NASUCA Annual Meeting Austin, Texas November 10, 2015 Scott J. Rubin, Attorney + Consultant 333 Oak Lane + Bloomsburg, PA Office: (570)
Emergency Demand Response Concept Overview and Examples Presented to: ERCOT December 3, 2004 Presented by: Neenan Associates.
Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
South Texas Electric Cooperative Load Forecasting Methodology ROS Meeting, 6/10/10.
DRG Slides for PWG Update to COPS. 2 Highlights from the DGTF Recommendation - 3 Small DRG applies to generation less than 50 kW –Profiling is applicable.
LOAD RESEARCH Irrigation Load Study Utah Cost of Service Task Force August 25, 2005.
FIRM TRANSPORTATION GAS SUPPLIER PRESENTATIONS GAS LOAD FORECAST.
Solar Profiling Interstate Renewable Energy Council presentation to the ERCOT Profiling Working Group Jan. 22, 2008.
PPL Electric Utilities Act 129 Phase 3 Non-Residential Programs April 20, 2016.
Distributed Renewable Generation Profiling Methodology ERCOT Load Profiling March 4, 2008.
Project Nexus UNC Workstream Consolidation of High-Level Principles Fiona Cottam 19 May 2010.
Analysis of Load Reductions Associated with 4-CP Transmission Charges in ERCOT Carl L Raish Principal Load Profiling and Modeling Demand Side Working Group.
Advanced Meter School August 18-20,2015 Time of Use and Load Profile Jeremiah Swann.
Smart Grid Tariff Changes
Principal Load Profiling and Modeling
Comparing Load Profiles: Art or Science?
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Emergency Response Service Baselines
UNC Modification Proposal 0202 National Grid Distribution
PLC = Peak Load Contribution (aka “ICAP”)
Independent Load Forecast Workshop
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
City of Lebanon, Missouri Electric Department
Load Shape Analysis – IRM 2008
Behavior Modification Report with Peak Reduction Component
Mike Mumper & Brian Kick Good afternoon
Development Work Group 194
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Beartooth Electric Cooperative Rate Design Analysis
Presentation transcript:

Calculations of Peak Load Contribution (PLC) AND Network Service Peak Load (NSPL) As of 1/1/2016

2 Overview PLC = Peak Load Contribution (aka “ICAP”) Capacity-related Individual customer ticket representing customer allocation of PECO’s share of PJM’s weather-normalized peak load from the previous summer (June through September) NSPL = Network Service Peak Load Transmission-related Individual customer ticket representing customer allocation of total actual network transmission service in the PECO zone Based on peak actual metered zone load from within the previous 12 months (November through October)

3 Overview PECO assigns both by premise (physical location) PECO calculates both annually and makes available for all EGSs by mid-December Effective Dates PLCs: PJM planning period (6/1-5/31) NSPL: Calendar year (1/1-12/31) For a new premise, PECO will apply a default value calculated annually based on the customer’s rate class and procurement class

4 Customer Account Types for Annual PLC/NSPL Determination Monthly consumption metered (Rates R, RH, OP) Interval metered* MV-90 metered All Procurement Class 3 accounts that used interval AMI metering for PJM settlements during any of the peak hours (new for 2016) * See note on next slide relative to PLC scaling Monthly metered with billed demand Metered demand (HT-151, PD-157, GS-101) GS unmetered (rate codes UCF/UCG, strata=107) GS consumption metered (rate code UC0, strata=107) Constant Load GS constant load (a subset of accounts specifically identified by PECO within rate codes UCF and UCG, strata=100) Traffic Lighting (rate class TL) Other Lighting (rate classes SLE, SLP, SLS, POL, and AL)

5 How PECO Annually Determines Customer PLCs Calculate all individual PLC tickets Correct all PLC tickets for normal peak weather Effective temperature = 99 Time = Hour ending 1700 Scale PLC tickets to annual PLC load target for PECO zone The sum of all tickets must equal the PLC load target for the PECO zone (PJM provides annually) PECO scales PLCs for all account types except those calculated for interval metered customers

6 Step 1: Identify the 5 PJM coincident peak days based upon the weather normalized peak for PJM’s entire footprint Step 2: For each day, calculate a weather correction factor based on: Customer’s rate class load shape for the day (GS uses strata 101) The kw reading on energy strata load shape at normal peak time (1700 hours) = C (coincident) The kw reading on energy strata load shape at normal peak time (1700 hours) and weather (99) = N (normal) The weather correction factor = N/C Example Calculation: Interval Metered (HT)

N = KW = 1.33 C KW * * N C N = Normal peak for profile C = Coincident peak of profile

8 Step 3: For each day, calculate the customer’s weather corrected load based on: - Actual customer reading at HE 1700 (e.g KW). This includes any customer add-back load provided by PJM to PECO - Daily weather factor calculated in Step 2 (1.01) - Rate class loss factor ( for HT) 1000 KW * 1.01 *1.0397= KW Step 4: Repeat Step 3 for the other four PJM CP days Step 5: Final Customer PLC ticket = Average of the weather corrected load calculated in Steps 3-4 for all five PJM CP days Example Calculation: Interval Metered (HT)

9 Step 1: Using the summer weekday load shape for the strata, calculate the point on the curve at normal peak weather & time (effective temp=99, HE 1700) From the strata load shape for R-113, weekday load at 99, HE 1700 = kw Step 2: Multiply the results of step 1 by the rate class loss factor (rate class loss factor for R = ) Load with losses = * = kw Example Calculation: Monthly Consumption Metered (R-113) PLC Scaling Factor = for sample calculations

10 Example Calculation: Monthly Consumption Metered (R-113) Step 3: Calculate the initial PLC by multiplying the results of step 2 (load with losses) by the summer load shape scaling factor for the strata (0.97 for example only) Initial customer PLC = 0.97* kw = kw Step 4: Calculate the Final PLC by multiplying the results of step 3 (initial customer PLC) by the PLC scaling factor Final customer PLC = kw * = 2.48 kw PLC Scaling Factor = for sample calculations

11 Example Calculation: Monthly Metered w/Billed Demand (GS) Step 1: Identify 5 load days consistent with PJM allocation of pool normalized peak For a summer period: 6/9, 6/17, 6/18, 8/4, 8/20 (for example purposes) Step 2: Using actual historical weather and the energy strata load shapes, create a load profile for each of the five selected days

N = KW = 0.79 A KW * * NA A = Actual non-coincident profile peak N = Normal peak for profile

13 Example Calculation: Monthly Metered w/Billed Demand (GS) Step 3: For each day, calculate the energy strata weather correction / coincidence factor based on the profile created in Step #2 using: The actual energy strata peak KW = A (actual) The energy strata load at normal peak time, TI=99 on the day of the energy strata peak KW (A) = N (normal) Weather correction=N A

14 Example Calculation: Monthly Metered w/Billed Demand (GS) Step 3 (continued) Then average daily weather correction factors just calculated. 06/09 = 1.00 KW 06/17 = 1.02 KW 06/18 = 1.06 KW 08/04 = 1.09 KW 08/20 = 1.03 KW Average weather correction factor = 1.04

15 Example Calculation: Monthly Metered w/Billed Demand (GS) Step 4: Calculate the customer’s average non-coincident on-peak demands for the summer period (bill end date June through September) Strata 101 (metered demand) – Use registered on-peak demands Strata 107, rate codes UC0 and UCF (GS consumption metered) – Calculate demand as [billed usage / 175] Ignore minimum billed demand in calculations Strata 107, rate code UCG (GS unmetered) – Use customer-specific contract demands

16 Example Calculation: Monthly Metered w/Billed Demand (GS) Step 4 (continued) Customer readings (for example purposes only): 6/2 = 20 KW 7/5 = 10 KW 8/4 = 30 KW 9/5 = 15 KW Average of above = KW

17 Example Calculation: Monthly Metered w/Billed Demand (GS) Step 5: Calculate the customer initial PLC ticket using: The customer’s average peak registered demand for the summer period (June through September), just calculated The strata average weather correction factor (1.04, calculated previously based on load profile) Rate class loss factor ( for GS) KW * 1.04 * = KW Step 6: Calculate the customer Final PLC ticket by multiplying by the PLC scaling factor: Final customer PLC = KW * = KW PLC Scaling Factor = for sample calculations

18 Example Calculation: Constant Load (TL) Traffic Lighting, GS 100 Step 1 – Identify billed usage and billed period number of days for the summer period (June through September) 6/14 = 500 kwh for 30 days 7/15 = 500 kwh for 31 days 8/15 = 500 kwh for 30 days 9/15 = 500 kwh for 30 days

19 Example Calculation: Constant Load (TL) Step 2 – Calculate the hourly load based on billed usage for each summer month 6/14 demand = (500 kwh)/(24 hours*30 days) = 0.69 kw 7/15 demand = (500 kwh)/(24 hours*31 days) = 0.67 kw 8/15 demand = (500 kwh)/(24 hours*29 days) = 0.72 kw 9/15 demand = (500 kwh)/(24 hours*30 days) = 0.69 kw

20 Example Calculation: Constant Load (TL) Step 3 – Calculate the initial customer PLC by averaging the demands and multiplying by the rate class loss factor ( for rate TL) Average Demand (based on previous slide) = 0.69 Initial customer PLC = Average demand * rate class loss factor = 0.69 * KW = 0.76 kw

21 Example Calculation: Constant Load (TL) Step 4 - Calculate the customer Final PLC ticket by multiplying the initial customer PLC by the PLC scaling factor: Final customer PLC = 0.76 kw * = 0.74 kw PLC Scaling Factor = for sample calculations

22 PLCs and NSPLs for Other Lighting Customers (excludes traffic lighting) PECO sets all PLC and NSPL tickets for lighting customers on rate classes SLE, SLS, SLP, POL, and AL to zero

23 How PECO Annually Determines Customer NSPLs Calculate all individual NSPL tickets (one-step) Exclude all load curtailed under PJM’s load management / demand response programs, also known as “add-backs”, as provided by PJM Scale NSPL tickets to annual target for PECO zone The sum of all tickets must equal the annual transmission load target provided by PJM for the PECO zone Annual load target is defined as the actual metered zonal peak (excluding “add-backs”) from previous 12 months

24 How PECO Annually Determines Customer NSPLs Transmission Load Scaling Factor = PECO’s Annual Transmission Load Target PECO’s PLC Load Target Directly applied to individual tickets for all customers that did NOT curtail load under PJM’s load management / demand response programs For customers that curtailed load, PECO removes the curtailed load from the individual ticket calculation process BEFORE applying the scaling factor

25 How PECO Annually Determines Customer NSPLs Final Customer NSPL = (Final Customer PLC w/add-backs removed) * (Transmission Load Scaling Factor) Example: Final Customer PLC w/add-backs removed = 20.5 kw Transmission Load Scaling Factor = 0.98 Final Customer NSPL = 20.5 * 0.98 = kw