Brian Foster - TOP 2006 1 The International Linear Collider Brian Foster Oxford The Global Design Effort Next steps & summary TOP 2006 Coimbra 14/01/06.

Slides:



Advertisements
Similar presentations
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Why/what is the ILC? The GDE The baseline design and R&D efforts The path to the RDR Detectors.
Advertisements

Nick Walker – GDE meeting Frascati Discussion and Approval of the BCD Nick Walker ILC-GDE Frascati –
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Plan ahead for the GDE Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Status of the ILC Accelerator Design Barry Barish, Nick Walker for the entire ILC machine community 2 nd ILC Workshop – Snowmass, Colorado
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
GDE Report to ILCSC Barry Barish Snowmass, CO 23-Aug-05.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
GDE expectations from the SRF community Barry Barish Cornell SRF Mtg 15-July-05.
The ILC Global Design Effort Barry Barish SPC Meeting CERN 13-Aug-05.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
Brian Foster - ILC 1 The International Linear Collider Brian Foster Oxford The Global Design Effort European GDE ILC Spain Gandia 4/12/05.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
The Path Toward a Linear Collider Barry Barish HEP 2005 Lisbon, Portugal 23-July-05.
The ILC Global Design Effort Barry Barish EPP2010 Cornell University 2-Aug-05.
ILC-GDE The ILC Global Design Effort Gerry Dugan ILC/GDE and Cornell University SLUO Annual Meeting SLAC Sept. 26, 2005.
GDE Report to FALC Status and Plans Barry Barish FALC Fermilab 4-Nov-05 ILC Polarized Electron Source.
The International Linear Collider Barry Barish 15-Nov-05.
GDE: Progress Report Barry Barish ILCSC Report CERN 9-Feb-06.
F. Richard LAL/Orsay ELAN in 2005 Annual Meeting.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
22-May-06 FALC - Rome Global Design Effort 1 Report on Progress of the GDE Barry Barish GDE.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
A Report from Snowmass on ILC F. Cervelli INFN-Pisa.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
GDE Report from Snowmass to a Baseline Barry Barish ILCSC Meeting Daegu, Korea 27-Aug-05.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
The International Linear Collider and the Future of Accelerator-based Particle Physics Barry Barish Caltech Lomonosov Conference 20-Aug-2015 ILC.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
6-7 April 06 MAC Review Global Design Effort 1 The Global R&D Board Bill Willis GDE Columbia University.
Brian Foster - 9th ICATPP 1 The GDE in Europe Brian Foster Oxford Brussels meeting/ preparations for FPVII EGDE meeting Oxford 24/10/05 GDE developments.
GDE Plans for Next Year Barry Barish GDE Meeting Frascati 8-Dec-05 Orsay Coupler.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Tor Raubenheimer ILC Accelerator Design: Status and Politics Loopfest V SLAC June 19 th, 2006.
GDE: Status and Plans Barry Barish CERN FALC Resource Board 8- Feb-06.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
W. ChouLC School, Sokendai, Japan1 Linear Collider needs you  Linear Collider is HEP’s future (~ 2020)  If we want to have a future, we must train a.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
ILC Global Design Effort Barry Barish GDE 9-March-06.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
1-2 May 2006 LCFOA Mtg Global Design Effort 1 The Baseline Configuration and the Reference Design Report Tor Raubenheimer SLAC.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
1 You have to Check URL of Change of ICB and TB member or member’s institute comparing last meeting.
Status and Plan of GDE Design Work (Including Road Map for RDR)
, A. Yamamoto SCRF WebEx Meeting.
The International Linear Collider
ILC Global Design Effort
International Linear Collider Report from the GDE Director
Barry Barish GDE Caltech
The International Linear Collider
Presentation transcript:

Brian Foster - TOP The International Linear Collider Brian Foster Oxford The Global Design Effort Next steps & summary TOP 2006 Coimbra 14/01/06 Why/what is ILC? Current status of the crucial design elements & BCD status Experiments

Brian Foster - TOP Why/what is ILC? Why do we want to build a high-energy e + e - collider? Physics case rests on three legs: known phenomena that ILC will definitely study- top quark; the Higgs: for which there is very strong indirect evidence and if LHC doesn’t find it then ILC will be essential to understand why; new particles for which there is very strong theoretical prejudice

Brian Foster - TOP Why/what is ILC? Furthermore the high precision of e + e - means that it is sensitive to phenomena far above its CM energy because of quantum corrections – as LEP proved.

Brian Foster - TOP Because radiated synchrotron-radiation power goes like m -5, circular e + e - colliders bigger than LEP (the previous CERN machine) are uneconomical. We didn’t know how to build complementary machines (like Tevatron (p-antip) and LEP) when LHC was proposed. Now we do – the ILC. Why/what is ILC? The ILC is a linear collider – thus there is no synchrotron radiation produced in bending e + e - in a circular orbit. The challenges stem from this – in circular machines, the beams pass through each other many times/ second, giving many chances for interaction – “luminosity”. In ILC, they pass through each other once and then are dumped. The only way to restore the luminosity is to crush the beams to a tiny volume so that one pass gives all the particles the same chance to interact that many passes gives less dense bunches.

Brian Foster - TOP ILC Parameters E cm adjustable from 200 – 500 GeV Luminosity ∫ Ldt = 500 fb -1 in 4 years Ability to scan between 200 and 500 GeV Energy stability and precision below 0.1% Electron polarization of at least 80% The machine must be upgradeable to 1 TeV

Brian Foster - TOP GDE –The Mission of the GDE Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable international costing, an industrialization plan, siting analysis, as well as detector concepts and scope. Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.) B. Barish is Director, assisted by 3 regional directors: BF (Europe); F. Takasaki (Asia); G. Dugan (Americas)

Brian Foster - TOP Snowmass 670 Scientists attended two week workshop at Snowmass

Brian Foster - TOP GDE – Staffing Chris Adolphsen, SLAC Jean-Luc Baldy, CERN Philip Bambade, LAL, Orsay Barry Barish, Caltech Wilhelm Bialowons, DESY Grahame Blair, Royal Holloway Jim Brau, University of Oregon Karsten Buesser, DESY Elizabeth Clements, Fermilab Michael Danilov, ITEP Jean-Pierre Delahaye, CERN, Gerald Dugan, Cornell University Atsushi Enomoto, KEK Brian Foster, Oxford University Warren Funk, JLAB Jie Gao, IHEP Terry Garvey, LAL-IN2P3 Hitoshi Hayano, KEK Tom Himel, SLAC Bob Kephart, Fermilab Eun San Kim, Pohang Acc Lab Hyoung Suk Kim, Kyungpook Nat’l Univ Shane Koscielniak, TRIUMF Vic Kuchler, Fermilab Lutz Lilje, DESY Tom Markiewicz, SLAC David Miller, Univ College of London Shekhar Mishra, Fermilab Youhei Morita, KEK Olivier Napoly, CEA-Saclay Hasan Padamsee, Cornell University Carlo Pagani, DESY Nan Phinney, SLAC Dieter Proch, DESY Pantaleo Raimondi, INFN Tor Raubenheimer, SLAC Francois Richard, LAL-IN2P3 Perrine Royole-Degieux, GDE/LAL Kenji Saito, KEK Daniel Schulte, CERN Tetsuo Shidara, KEK Sasha Skrinsky, Budker Institute Fumihiko Takasaki, KEK Laurent Jean Tavian, CERN Nobu Toge, KEK Nick Walker, DESY Andy Wolski, LBL Hitoshi Yamamoto, Tohoku Univ Kaoru Yokoya, KEK 49 members Americas 16 Europe 21 Asia 12 New Members Peter Garbincius (FNAL) Marc Ross (SLAC) Bill Willis (Columbia) Andre Seryi (SLAC) John Sheppard (SLAC) Ewan Patterson (SLAC) Maseo Kuriki (KEK) Kiyoshi Kubo (KEK) Nobuhiro Terunuma (KEK) Norihito Ohuchi (KEK) Susanna Guiducci (INFN) Deepa Angal-Kalinin (CCLRC) Totals Americas23 Europe23 Asia16

Brian Foster - TOP Baseline Concept

Brian Foster - TOP BCD overview Currently the ILC BCD looks like this: Process overseen by ILC Executive - B. Barish, G. Dugan, BF, F. Takasaki, T. Raubenheimer, N. Walker, K.Yokoya.

Brian Foster - TOP Official BCD The BCD has now been released and can be found at: Parameters for 2*10 34 : min nom max Bunch charge N1 22x10^10 Number of bunchesn b Linac bunch interval  b ns Bunch length  z  m Vertical emittance  y  m.mrad IP beta (500GeV)  x  m  y  m IP beta (1TeV)  x  m  y  m What are most important parameters to be tuned?

Brian Foster - TOP BCD & AC cavities What knobs do we have to turn? Relative Cost Gradient MV/m C. Adolphsen (SLAC)

Brian Foster - TOP BCD & AC cavities

Brian Foster - TOP BCD & AC cavities Single cell status

Brian Foster - TOP BCD & AC cavities BCD

Brian Foster - TOP Klystron Fabrication Several suppliers for BCD:

Brian Foster - TOP Damping rings Area in which technology has really advanced

Brian Foster - TOP Damping rings Three candidates emerged from Snowmass:

Brian Foster - TOP Damping rings Pulser development at KEK ATF BCD has 2*6km e +, 6 km e - ; dogbone backup.

Brian Foster - TOP How many tunnels? TESLA had 1 - warm design had 2: BCD - 2 tunnels following earth’s curvature

Brian Foster - TOP Roughly in rising/falling order of preference for acc./det. people, (iIR: instrumented IR, nIR: non-instrumented IR) –2 iIRs/ 2 detectors –1 iIR/ 2 detectors (push-pull) + 1 nIR –1 iIR/ 2 detectors (push-pull) –1 iIR/ 1 detector (push-pull capability) –1 iIR/ 1 detector + 1 nIR –1 iIR/ 1 detector How many IRs? If no $ problem, answer clear - 2IPs, 2 det. BCD - 2 IPs shifted.

Brian Foster - TOP Tunnel length Options: Build full 1 TeV-length tunnel and only populate the first half; Build full 1 TeV-length tunnel and use the full length with gaps; Build only 500 GeV-length tunnel and extend to 1 TeV length as subsequent upgrade. The BCD is the short tunnel. The long tunnel half full should be an option we will present to governments with the suggestion that it would be very sensible to build the whole tunnel.

Brian Foster - TOP Test facilities TTF exists at DESY, SMTF (FNAL), STF (KEK): Stimulate SC industry in the regions - collaborate on SC technology

Brian Foster - TOP ILC Communications Launch of New ILC Snowmass “One Stop Shopping” –electronic data management system (EDMS), news, calendar of events, education and communication

Brian Foster - TOP

Brian Foster - TOP Three concepts under study Typically requires factors of two or so improvements in granularity, resolution, etc. from present generation Focused R&D program required to develop the detectors -- end of 2005 Detector Concepts will be used to determine machine detector interface, simulate performance of reference design vs physics goals next year. Detector Concepts and Challenges

Brian Foster - TOP Snowmass - detectors SiD (American origin) –Silicon tracker, 5T field –SiW ECAL –4 ‘coordinators’ (2 Americans, 1 Asian, 1 European) LDC (European origin) –TPC, 4T field –SiW ECAL (“medium” radius) –6 ‘contact persons’: (2 Americans, 2 Asians, 2 Europeans ) GLD (Asian origin) –TPC (+Silicon IT), 3T field –W/Scintillator ECAL (“large” radius) –6 ‘contact persons’: (2 Americans, 2 Asians, 2 Europeans)

Brian Foster - TOP Snowmass - detectors + vertexing near IP ECAL/HCAL inside coil

Brian Foster - TOP Next steps for GDE Need to put new structures & people in place for next step to RDR. RDR will take forward the BCD, refine the design and in particular gather industrialisation data in order to form the basis for reliable cost estimate with the RDR. Aim is to have all the new structures operating well and giving a status report by the next GDE meeting in March in Bangalore.

Brian Foster - TOP Next steps The RDR will be produced using a matrix structure of “area systems” and “technical systems” to account for the structure of the project. There will be 3 new boards: Change Control Board; Global R&D Board; Design & Cost Board.

Brian Foster - TOP Next steps ICFA FALC Resource Board ILCSC GDE Directorate GDE Executive Committee Global R&D Program RDR Design Matrix GDE Change Control Board GDE Design Cost Board GDE R & D Board

GDE Plan & Schedule Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Technical Design Bids to Host; Site Selection; International Mgmt LHC Physics; CLIC

Brian Foster - TOP Summary The GDE is functioning well and growing. The Baseline Design for the ILC is complete. Lots of real work is going on as well as the necessary organisation. Frascati meeting finalised the BCD and kick-started us into the next, RDR, phase. Three more meetings planned this year - Bangalore, Vancouver and Valencia - the RDR is planned to be ~ finished by Valencia in 11/06. Then onwards & upwards to TDR. The ILC is gathering momentum!!!