JCOMM in-situ Observations Programmes Support Centre Paris, June 2012.

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water Review of relevant documents to the WMO capacity development activities.
Advertisements

WMO Interactions on Ocean Matters Weather and Disaster Risk Reduction Services Department Marine Meteorology and Ocean Affairs Division.
PMO-III, March 2006, Hamburg, Germany. Other PMO Activities.
World Meteorological Organization Working together in weather, climate and water Pilot Project V Integration of marine meteorological and other appropriate.
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch JCOMM OCG IV/ Hobart, April 2011.
Data Buoy Cooperation Panel Hester Viola
» Data buoys measure air pressure, temperature (sea-surface & air), ocean current velocity and wind velocity across all oceans. These observations are.
JCOMM in situ Observing Platform Support Centre JCOMMOPS
Report to the First GODAE OceanView Science Team Meeting Toulouse, 8 June 2009 Jean-Louis FELLOUS and Peter DEXTER Co-Presidents of JCOMM and Albert FISCHER,
JCOMMOPS Operations & Development Technical Coordinators (H. Viola, M. Belbeoch) JCOMM OCG Geneva/WMO, April 2007.
World Meteorological Organization Working together in weather, climate and water Adaptation to Climate Change Impacts on Coastal Communities M.V.K. Sivakumar.
JCOMM Observing Programme Support Centre Activities, future directions and opportunities. JCOMM III, Nov. 2009, Marrakech Mathieu Belbeoch & Hester Viola.
Argo Information Centre Report M. Belbeoch, Argo TC ADMT #10, Toulouse, France September 2009.
Argo & AIC Development Argo TC DBCP #22 La Jolla, California.
JCOMM Observations Programmes Support Centre 2013 Global Ocean Observing Systems Coordination by JCOMMOPS M. Belbeoch Global Ocean Observing Systems Coordination.
The Partnership between the Maritime Industry, Marine Forecasting and Science.
JCOMM in-situ Observing Programme Support Centre SeaDataNet Technical Meeting II Paphos, Cyprus March 2012 Mathieu Belbeoch & Kelly Stroker.
Argo Status Argo TC AST#13 March 2012, Paris nations maintain the global array and 20 more fill regional gaps 18 countries active in 2011 (16 inactive)
Voluntary Observing Ships (VOS) WMO Observing Systems Division (OSD)
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (1) JCOMM in situ Observing Platform Support Centre Most developments now achieved –Infrastructure in.
JCOMMOPS & Argo, DBCP, SOT, OceanSITES 2 nd GODAE Observing System Evaluation Workshop Toulouse, June 2009 Mathieu Belbeoch & Hester Viola.
JCOMMOPS in support of Global Ocean Observing Systems Mathieu Belbeoch USA, April 2012.
JCOMMOPS JCOMM Observing Program Support Centre Etienne Charpentier, WMO Secretariat M. Belbeoch, JCOMMOPS May 2011, MARCDAT-III.
JCOMM Observing Programme Support Centre International Coordination and Gliders EGO #4, Cyprus Yves Desaubies Mathieu Belbeoch Hester Viola.
BPO Science Program14 December 2014Webiinar We cannot manage what we do not measure: Martin Kramp - JCOMMOPS Ship Coordinator.
JCOMM in situ Observing Platform Support Centre JCOMMOPS
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch AST#13 Paris, March 2012.
The Data Buoy Cooperation Panel (DBCP) Joint Meeting of the International Program for Antarctic Buoys (IPAB) and the International Arctic Buoy Program.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS David Meldrum, vice chair, JCOMM OPA.
IV-3.1 JCOMMOPS SOT Technical Coordinator. 2 JCOMMOPS structure Programmes currently supported –Ship Observations Team (30% Mathieu Belbeoch) –Argo Profiling.
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch DBCP #27 September 2011 Geneva, Switzerland.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
Symposium on multi-hazard early warning systems for integrated disaster risk management A JCOMM perspective Enhanced early warning for better coastal or.
Deployment Opportunities M. Belbeoch DBCP #27 September 2011 Geneva, Switzerland.
Global Ocean Observing Systems achievements, perspectives and challenges Mathieu Belbeoch OCOSS’2010 Conference Brest/France 21 st.
Monitoring and management of ship logistics opportunities M. Belbeoch PMO IV December 2010 Orlando, USA.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
International Argo structure Argo TC M. Belbeoch Accra, Ghana.
I-2.5 Report by the former SOT Technical Coordinator Hester Viola 1 May 2007 – 31 January 2009.
Bob Keeley Marine Environmental Data Service Dept. of Fisheries and Oceans Ottawa, Canada Jun, 2006 SeaDataNet Meeting.
Silver Spring HRMM Workshop April Global Ocean Surface Underway Data project (GOSUD) Theirry Carval – Coriolis Ifremer Bob Keely – MEDS Thierry.
JCOMM Observations Programme Area Report to the DBCP Angra dos Reis, 20 October 2003 Observations Programme Area Coordination Group (OCG) Mike Johnson,
IOC Assembly June 2015 JCOMM in-situ Observations Programme Support Centre.
IRSO 2015 October 2015 La Jolla, CA, USA IRSO 2015 Steve Diggs (CCHDO) on behalf of Martin Kramp, JCOMMOPS Ship Coordinator Update on JCOMMOPS Activities.
JCOMMOPS International Technical Coordination for the implementation of Global Ocean Observing Systems.
1 GEO Science and Technology Committee, Melbourne, 16 September 2009 Coordinating Implementation of the Global Ocean Observing System Peter Dexter Co-President.
TARA / COP21 Paris, Dec Global Ocean Observing System & Argo Mathieu Belbéoch Argo Technical Coordinator JCOMMOPS Head Global Ocean Observing System.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS Johan Stander, co-president, JCOMM David Meldrum, co-chair,
JCOMM: Perspectives & Contributions 1 Val Swail - Environment Canada, Toronto 2 Scott Woodruff - NOAA Earth System Research Laboratory, Boulder Elizabeth.
1 The Argo project 21st Century in-situ Ocean Observing System M. Belbeoch, Argo Technical Coordinator with inputs from D. Roemmich, Argo Steering Team.
Future needs and plans for ocean observing in the Arctic AOOS Arctic Town Hall Futur Zdenka Willis Integrated Ocean Observing System National Program Office.
Status of the Global Ocean Observing System – April 2015 David Legler, Director Climate Obs Division NOAA Climate Program Office OOPC – April 2015 Sendai,
USA, April 2012 JCOMMOPS in support of Global Ocean Observing Systems Mathieu Belbeoch
Global Ocean Observing System & Argo by JCOMMOPS www. jcommops
Prepared by the JCOMM Ship Observations Team
Global Ocean Observing Systems Coordination by JCOMMOPS M
JCOMM in-situ Observations Programme Support Centre www. jcommops
What is JCOMMOPS JCOMMOPS occupies a unique place as the focal point for the practical coordination of the in-situ ocean observing systems defined by JCOMM.
Candyce Clark JCOMM Observations Programme Area Coordinator
IMPROVING GLOBAL FORECASTS OF WEATHER & OCEAN CONDITIONS
Item 16.3 Governance review
JCOMM III, Nov. 2009, Marrakech Mathieu Belbeoch & Hester Viola
JCOMM in-situ Observations Programme Support Centre www. jcommops
Contributions to WIGOS David Meldrum, vice chair, JCOMM OCG
Coordinating Operational Oceanography and Marine Meteorology
Challenges & opportunities for developping regional cooperation
The GOOS and GCOS partnership
JCOMM in-situ Observations Programme Support Centre www. jcommops
Support for SOT Activities
Argo Information Centre & Argo Users
Presentation transcript:

JCOMM in-situ Observations Programmes Support Centre Paris, June 2012

Before the 80s, most of ocean observations were made via research vessels (specific regional campains, expensive, data never realeased or years after) The advent of satellite measurements, particularly surface topography from altimeters, as well as routine measurements from in-situ moorings and autonomous free floating instruments, led to enormous improvements in our fundamental understanding of the ocean. Socio economic benefits of global ocean observations were formally recognized in 1990 (GOOS establishment) The joint IOC/WMO commission for oceanography and marine meteorology was then established in 1999 (JCOMM) Clear interdisciplinary requirements, minimize duplication of efforts Bridge between oceanographers and marine meteorologists Integration of expertise, implementation plans, information streams, services 2

Global observing programmes are funded & implemented nationally International and technical coordination is required, –Through dedicated Panels: DBCP, SOT, Argo, OceanSITES, IOCCP, GLOSS, GO-SHIP,... –Between Member States Funding agencies Platform operators, Prog. Managers, Principal Investigators Satellite data telecommunication providers Instrument, sensor manufacturers, industrial partners Data centres, archiving centres, data users JCOMM: successful as an implementation mechanism, by coordinating and developing standard procedures and best practices for fully integrated marine observing, data management, and services system. 3

The JCOMM Observations Programmes Support Centre, JCOMMOPS, is hosted by France (with CLS/CNES and Ifremer support) and monitor on a day to day basis the status of the global arrays (since 2001). 4-person operation centre based in Toulouse (sat. link) and funded entirely through extra-budgetary sources, is now an indispensable and highly regarded component of the observing system coordination process, providing a range of metadata, logistics and technical support for the panels as well as for some external bodies. Efforts are now underway to partner with new implementation bodies (including space agencies) and attract additional funding to allow expansion of the JCOMMOPS functions to cover further components of the in situ observing system, and also enhance integration of satellite and in situ observations. Synergies and new operational services to be developed with Brest (in- situ link), concentrating many professionals of the ocean 4 JCOMMOPS overall yearly budget: 600k$ Provided by Member States via IOC & WMO and host country (in-kind) JCOMMOPS Services being developed (incomes) Sponsoring, crowd sourcing to be developed

JCOMMOPS is involved with the implementation of the main global in-situ observing systems, including: –DBCP (data buoy cooperation panel): Drifting and moored buoys in the high seas and tropical moorings, tsunameters and misc. fixed platforms. –SOT (ship observations team) : SOOP (XBTs, TSGs), ASAP atmospheric soundings, VOS meteorological observations (GO-SHIP ?) –Argo: Profiling floats –OceanSITES: Deep ocean time-series reference stations –Next: costal/regional systems (gliders, polar, coastal floats, marine mammals, etc) JCOMMOPS is now “firmly established as a major support facility for operational ocean observing system.” JCOMM co-presidents, 2009 JCOMM Observing Program Support Centre

Data Buoy Cooperation Panels: ~1250 surface drifters & ~400 moorings Surface drifters, tropical/coastal moorings, ice buoys,...

Data Buoy Cooperation Panels: ~1250 surface drifters & ~400 moorings

Ship Observation Team (~2000 ships) The work of the SOT consists of several very successful and enduring data collection programmes (over 100 years), involving voluntary observing ships and ships of opportunity operated through the VOS and SOOPIP. 8 A long tradition of voluntary ocean data collection by the world’s seamen gathering essential variables used for research, climate forecasting, numerical weather prediction and maritime safety. Coverage declining (difficulty to recruit new ships in some areas)

SOOP XBT network 9 Needs: Research-quality deep (2000 m) XBT, Next generation automatic XBT launcher, Modernization/standardization of data management system.

~3500 Profiling floats: Argo Programme A revolutionary achievement for subsurface observations An unprecedented cooperative effort in the history of oceanography A crucial mechanism to better understand the warming of the upper ocean Innovative data system 10

OceanSITES Needs: data distribution, standards/QC for bio-geochemical variables. A worldwide system of long-term, deepwater reference stations measuring dozens of variables and monitoring the full depth of the ocean from air-sea interactions down to 5,000 meters.

Many other observing systems are emerging and will complete the GOOS: -Polar systems (Met. / Oceano) -Coastal floats -Marine mammals equipped with sensors -Find holes in ice-covered regions -Multidisciplinary approach -Gliders (regional) -Guided -Multi sensors -expensive 12 Needs: (international) Scientific Steering Team and Data Management Team participating to the international coordination infrastructure And technical coordination within JCOMMOPS

JCOMMOPS comprises Technical Coordinators : –Mathieu Belbeoch JCOMMOPS Lead The Argo Profiling Float programme –Kelly Stroker The Data Buoy Cooperation Panel The OceanSITES Program –Recruiting a Ship Logistics Coordinator (applications closing Aug. 31st) SOT program coordination Ships/Cruises metadata champion Operations (charters, partnerships, ship time service) Coordination for GO-SHIP (CTDs) TBC I.T. experts: 1 EFT. to be expanded to 1.5 EFT in 2013 Students on short/long work experience Secretarial support by IOC and WMO Host (CLS/CNES, Ifremer) specific support and facilities (including meetings organizations). International professional connections and synergies

JCOMMOPS Services = Focal Point + Information System Manage and control all information except physical (and BGC) data –50000 platforms, ships, millions of observations, locations, 2000 contacts points, 400 programs, 50 countries, etc –4 Servers: DB (Oracle 11x), GIS (ESRI 10.x), Java Web Application –Real-time synchronization with GTS, GDACs, NODCs, Operational centres, … –Websites, Web services –Routine and ad hoc products for the community –Real-time intergovernmental warning system –Products to promote the observing systems to large public (e.g. G-Earth displays) JCOMMOPS is not a data distribution centre but rather a metadata centre “quality controlling” metadata essential to global programmes coordination

The JCOMM Observations Programme Support Centre, on behalf of GOOS and JCOMM, aims to: monitor and evaluate the performance of the networks assist in the planning, implementation and operations of the observing systems act as a clearing house and focal point on all programme aspects assist in data distribution on the Internet and GTS encourage cooperation between communities and member states relay user feedback on data quality to platform operators provide technical assistance and user support worldwide develop synergies between observing systems (GOOS) JCOMM Observing Program Support Centre

16

Products & Services: Examples Real-time... Very early on, JCOMMOPS provided online, interactive GIS–based, real-time tracking tools for ocean platforms and is now working on a partnership with Google to include JCOMM/GOOS observing system status and products within Google Ocean Interoperability targeted: Web Map Services, XML metadata exports, etc. Monthly... JCOMMOPS Status maps are widely recognized as authoritative and giving an up- to-date, verified status of the arrays, encouraging community to share the data and showing how the programmes assess and meet their requirements

Products & Services: Examples (Argo) Planning management... Centralized Planning 6-12 months in advance Official registration/notification Synchronization with all national programmes Crucial for a global array maintenance Plans rated to guide implementation

19 Float reliability has finally reached manufacturers spec. for most of float models: 150 cycles (almost to 2000m)

G-Earth: Community monitoring tool Outreach

Retrieval procedure of beached instruments Guidance for retrieval, safety information Regional cooperations developed Registration/Certification of platforms Impartial tracking at air-time provider level Free data access guaranteed Full transparency on programme implementation 21

22 Information on international rules provided to implementers Notification procedure for Argo: implementation of Res XX-6, Res XLI-4 RT warning system and reporting to Member States Reports provided on demand to coastal states Cooperation encouraged (Donor programmes)

JCOMMOPS Ship Time Service –Recurrent global and regional gaps in the arrays –Global economical context under pressure (ship time decreasing) –Resources available for planning operations under pressure JCOMMOPS can now provide assistance for deployments, servicing, at a marginal cost –e.g. Lady Amber story, supported by JCOMM, IOC/UNESCO (and IOC Perth), WMO Partnerships Sailing community, industry, individuals, explorers, NGOs are being developed After a decade of implementation using mainly research vessels and merchants ships, the global programmes are now investigating green, flexible, free or non-profit based, and dedicated deployment platforms, combining operational efficiency and promotional/educational opportunities

24 Lady Amber story ~60 floats deployed for CSIRO South African crew. Green, flexible, dedicated, trained crew 30 keuros/month (via CLS/JCOMMOPS) Autonomy: 2 months Iridium com./ , Argos/GPS tracking Storage capacity (50 units) 100 soon. Crane/CTD to be installed : Indian Ocean 2013: Atlantic ocean Very good communication operation (TV, radios, newspapers websites, …)

25 Voiles sans Frontières: NGO « Sail without borders … » Unique french NGO recruiting 20 ships every year Development project, solidarity, etc in Senegal 10 floats to be deployed (departure/storage Lorient and Sètes) Flexibility (deploy, load, retrieve, etc) Large spatial coverage !!!! Huge communication potential !!!!

26 Partnership UNESCO/ MultiOneAttitude “Race for Water” 2 floats deployed between Brest and New York. Presence at the Brest 2012 ship Festival: outreach Huge communication means. Possibility to deploy floats/drifters during sailing races under evaluation

JCOMMOPS: modest but essential oil in the systems of systems It has proven its efficiency, and inventiveness –assisting as appropriate the varied OOS community –providing an identity to obs. programmes through rigorous monitoring tools –ensuring the transparency of their implementation –Optimizing their efficiency –encouraging international cooperation proactively –developing light operational support means It needs further means to serve properly each component of the GOOS. It needs to improve it legal standing with host country, IOC and WMO –Renew MoU with France –Establish a “IOC Programme Office” Support from host country (France) is critical to its success 27

JCOMMOPS is rounding a new cape by strengthening its support to the pillars of the GOOS -integrating its core deliverables and services, -developing light operational capacities, and - working with France and Member States, and ocean community (including industry) to increase financial means.

29