9-cell cavity coordination CM Ginsburg 15 Mar. 2010.

Slides:



Advertisements
Similar presentations
FNAL Superconducting RF Program Sergei Nagaitsev.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Superconducting RF Cavity/Cryomodule Development at Fermilab (Industrialization) C.M. Ginsburg (FNAL) Proton Accelerators for Science and Innovation 2.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
US Cavities Status and Plan Mark Champion 01 October 2009.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
The ILCTA_MDB Horizontal Test Stand for SRF Cavities Andy Hocker FNAL-TD AEM, 25-JUN-2007.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
ILC Cavity and Cryomodule Overview Shekhar Mishra Fermilab.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
9-cell cavity coordination CM Ginsburg 8 Mar
SRF Plans at ANL & FNAL Bob Kephart ILC Program Director, Fermilab ANL-FNAL-U of C Collaboration Meeting Oct 12, 2009.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
F Fermilab ANL/FNAL SCPF EP/HPR Processing Status and Plan Allan Rowe TD/SRFDD.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.
Americas S0 Cavity (Tesla-style) Test Philosophy and Test Status results from JLab, Cornell and FNAL C.M. Ginsburg (FNAL) GDE SCRF Meeting April 21, 2008.
July 2010DOE FNAL S&T Review1 SRF Activities at FNAL SRF Activities at FNAL FNAL DOE S&T Review Bob Kephart SRF Activities at FNAL SRF Activities at FNAL.
FNAL SRF Program: 1.3 GHz Camille M. Ginsburg (FNAL) Fermilab Accelerator Advisory Committee November 7-9, 2011.
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Recent FNAL/ANL Cavity Performance C.M. Ginsburg (FNAL) On behalf of the FNAL/ANL Cavity Crew TTC Meeting - Milano 28.Feb.-3.Mar
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Plasma cleaning Laser re-melting technique at FANL M. Ge, G. Wu, J. Ruan, J. Ozelis, T. Nicol, D. Sergatskov, D. Hicks, L. Cooley Fermi National Accelerator.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
WP High Beta Cavities Delivery
Cornell Updates Commissioning of T-map for ILC single cell starts.
LCLS-II Technical Requirements
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
ILC-SCRF Test Facilities considerations
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
FNAL recent coupler troubles
for the FNAL/ANL, JLab, and Cornell cavity teams
S1-G cryomodule assembly status
S0 Status report from KEK
ILC Cavity & Cryomodule Overview
Production Cavities in progress
Cost reduction activities in cavity fabrication at MHI
Mechanical Polishing of 1.3 GHz Niobium Cavities
TTC Meeting, 28 February - 2 March, 2011, Milan
Presentation transcript:

9-cell cavity coordination CM Ginsburg 15 Mar. 2010

15 Mar 2010CM Ginsburg SRF Mtg2 Production Cavities in progress TB9ACC013 (dressed) –At HTS. To be warmed up Wed. Then, remove cold coupler in cleanroom and inspect, then Questar inspection of cavity, then HPR unless something plan-changing is found during the inspection TB9AES009 (dressed) –tuner and magnetic shield assembly today –HTS installation previously planned for 15.Mar. delayed until next week –Eng Note not ready. To be submitted today for approval. Ok to do preliminary work, including pressure test, but not cooldown. Estimate one week delay for cooldown. ACCEL8 (dressed) –Was HPR’d and prepared for HTS last week at FNAL/ANL facility; to MP9 early this week TB9AES008 (dressed) –Headed to ANL this week for fit-up test because of 2-phase pipe –Will be next for HTS prep TB9AES010 (dressed) Will be next for HTS prep TB9ACC016 –was delivered from JLab 11.Mar; currently in ICB. It's going straight to MP9 for dressing. Ti ring welding at Sciaky is planned for 31.Mar (2 week delay by Sciaky). TB9AES007 –Started cooling Sat for vertical test tomorrow TB9RI018 –1 st assembly and 2 nd HPR today; estimated vertical test later this week (continued…) *=bulk-EP’d at RI

15 Mar 2010CM Ginsburg SRF Mtg3 Production Cavities (cont.) TB9RI024* –Tuned (on tuning machine); headed to ANL this week for light-EP and VTS prep. after ANL week-long maintenance shutdown TB9RI026 –Into JLab 800C furnace today, then return to FNAL; tuning; light-EP and VTS prep at FNAL/ANL after TB9RI024* TB9RI023* (with the weld void at the transition ring) –RI weld void repair at RI is expected to be complete this week TB9RI019 –Arrived at JLab Fri; JLab will do “standard” Questar inspection upon arrival (not full KEK/Kyoto scan) before starting full process/test cycle TB9RI029* –In transit to JLab for 800C HT TB9RI020 done with incoming inspection TB9RI021* almost done – still needs field flatness measurement Incoming inspection started on TB9RI022*, TB9RI027 To be inspected: TB9RI025*, TB9RI028 New cavities –The first AES cavities are currently expected to arrive by the end of March. The first two Niowave-Roark cavities are currently expected to be completed by end March. *=bulk-EP’d at RI

15 Mar 2010CM Ginsburg SRF Mtg4 R&D Cavities in progress AES003 (spot polished at KEK) –Optical inspection showed interesting features which may explain persistent field emission; under discussion to remedy with by-hand spot polishing and light EP –Field flatness measurement and possibly tuning ACCEL6 and ACCEL7 –Held in reserve as CM2 backup cavities until they can be replaced by better cavities TB9ACC014 (after dented cell was tuned to lower field) –Vertical test 15.Feb.: 29 MV/m at 2K; some FE observed. grad=1.4E10 max gradient to be confirmed by 24.Mar –retest with second sound and different thermometry configuration second sound system in IB1 to be complete April 5 TB9ACC010, ACCEL9, TB9AES005, TB9ACC015 Cornell) –are in various stages of tumbling and VEP. Being used for VEP commissioning and performance improvement. TS7MSU001 & TS7MSU002 (visual inspection and tuning only, then return) –Visual inspection complete, field flatness measurement complete, tuning complete –In transit back to MSU

15 Mar 2010CM Ginsburg SRF Mtg5 9-cell Cavities - By Facility Incoming inspection New RI cavities, alternating not-EP’d and EP’d Tuning/field flatness measurement AES003 (tuning), TB9RI026 (tuning, when back from JLab), TB9RI022* (FF,when other incoming inspections complete); next will be TB9RI025*(FF), TB9RI027(FF), TB9RI028 (FF) [order uncertain] Optical Inspection TB9RI026, TB9RI029* done; AES003 done and to re-appear, next: TB9RI026 (again, after return from JLab 800C HT); up to 3 additional production cavities available [TB9RI020, TB9RI021*, TB9RI022*] FNAL/ANL (dressed – for HTS prep) ACCEL8, TB9AES008, TB9AES010 (bare – for VTS prep) facility maintenance; TB9RI024* light EP+VTS prep; TB9RI026 light EP+VTS prep (after JLab 800C HT and optical inspection); more light EPs to come down pipeline [TB9RI029*, TB9RI021*, TB9RI022*, TB9RI025*, TB9RI023*]; also several heavy EPs on NR and AES cavities Weighing device to be procured VTS Second sound system to be completed TB9RI024* (after light EP); TB9RI026 (after tuning, light EP); TB9ACC014 (with second sound and modified thermometry), same subsequent list as FNAL/ANL (bare) above HTS TB9ACC013, TB9AES009 (installation ~18.March; 3 weeks duration), ACCEL8 (test duration: 2 weeks proposed), TB9AES008 (test duration: 2 weeks proposed), TB9AES010 (test duration: 2 weeks) MP9 TB9ACC013 (dressed) remove cold coupler in cleanroom and inspect, then Questar inspection; TB9AES009 (dressed) to be delivered to HTS before installation 18.Mar.; HTS prep follows for ACCEL8 (dressed), TB9AES008 (dressed), TB9AES010 (dressed); TB9ACC016 is next for dressing NB: when in doubt, production cavities always have priority