The World of AUL Presentation by: Atul Pandey, P.E. PANDEY Environmental, LLC 2016 Ohio Brownfield Conference April 7, 2016.

Slides:



Advertisements
Similar presentations
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Advertisements

VAPOR INTRUSION: AN INTRODUCTION OHIO COMMUNITY DEVELOPMENT CONFERENCE JENNIFER MILLER NOVEMBER 7, 2012.
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
Case Study of Subsurface Vapor Intrusion at a Dry Cleaner Site Amy Goldberg Day AEHS Annual East Coast Conference on Soils, Sediments.
2014 Vapor Intrusion Guidance Amendments Discussion Points Waste Site Cleanup Advisory Committee Meeting May 22, 2014.
Vapor Intrusion. What is Vapor Intrusion? The migration of volatile chemical vapors from the subsurface to overlying buildings.
Vapor Intrusion: When to Worry? NAREIM National Assn of Real Estate Investment Managers Las Colinas, TX September 26, 2012 Beverlee E. Silva, Esq. Alston.
ASTM Changes in Presented By Dan Richardson BB&T Roundtable Nashville, Tennessee July 2013.
Introduction to Brownfields New Partners for Community Revitalization, Inc. June 29, 2009.
Basic Economic Development Course in Pennsylvania Environmental and Commercial Real Estate Legal Issues Surrounding Economic Development Act 2 Issues Scott.
Remediation Programs Update MSECA Quarterly Meeting March 13, 2012.
Voluntary Action Program – A Primer Amy Yersavich State and Federal Resources to Redevelop Blighted Properties Lake County November 12, 2010.
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
Voluntary Action Program – A Primer Martin Smith, Ohio EPA State and Federal Resources to Redevelop Blighted Properties Workshop.
Institutional Controls Pamela Elkow and Richard Fil.
Environmental Testing at Immaculate Heart of Mary (IHM) Week of April 21, 2014 Presented by Ohio EPA and Summit County Public Health.
Considerations for Transactions with Environmental Issues Richard M. Fil, Esq.
Vapor Intrusion Workgroup July 29,
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
Vapor Intrusion Guidance Proposed Updates
VAP Environmental Covenant Guidance 2015 CP Coffee - July 14, 2015 Sue Kroeger, Ohio EPA Legal Office.
Common Issues for Exposure Scenarios without GNS VAP CP Summer Coffee July 14 th, 2015 Mike Allen Ohio EPA CO- Supervisor
Ohio EPA Targeted Brownfield Assessment and Technical Assistance Programs.
Revised TCE Fact Sheet (a.k.a. “Status Update”) Q&A’s & Template IH Notice Form March 27, 2014 Paul W. Locke MassDEP Bureau of Waste Site Cleanup (617)
Overview of US EPA’s Vapor Intrusion Guidance VAP CP Summer Coffee July 14 th, 2015 Carrie Rasik Ohio EPA CO- Risk Assessor
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
DTSC VAPOR INTRUSION GUIDANCE California Industrial Hygiene Council 16 th Annual Conference Dan Gallagher Department of Toxic Substances Control California.
Brandon Real Estate Board - June 19/20031 Your Logo Here ENVIRONMENTAL SITE ASSESSMENTS Phase I ENVIRONMENTAL SITE ASSESSMENTS Phase I.
Vapor Intrusion and Environmental Liability Learning From Past Mistakes EDR Insight Webinar, February 12, 2013 Presented by: Joseph Maternowski Hessian.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
New NFA Review Process Updates CP Coffee April 13, 2015.
ENVIRONMENTAL ODDITIES From Here to There, and There to Here… PESTICIDES CAN BE FOUND ANYWHERE! Prepared By: Jeffrey Sotek, PE, CSP, CIH
Fairbanks Areawide Industrial Reclamation Project ADEC AREAWIDE MANAGEMENT GOALS Janice Wiegers ADEC.
THE GEORGIA BROWNFIELD PROGRAM MAY 22, BROWNFIELD: FEDERAL DEFINITION Real property, the expansion, development or reuse of which may be complicated.
Voluntary Action Program Updates Certified Professional Coffee July 14, 2015.
Environmental Covenant Guidance Certified Professional Coffee April 13, 2015 Sydney Poole – DERR-VAP Sue Kroeger – Legal.
Consideration of Brownfields and Contaminated Properties During NEPA 2014 Real Estate Workshop.
Maryland Department of the Environment Harbor Point – Regulatory Overview Horacio Tablada, Director Land Management Administration November 14, 2013.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
REMEDIATION OF CONTAMINATED LAND IN SOUTH AFRICA Part 8 of the Waste Act Ms Mishelle Govender Chemicals and Waste Management.
MOA-Track Updates Certified Professional Training October 27, 2015.
Common VAP Risk Assessment Issues Certified Professional Annual Training October 2015 Mike Allen.
NFA Letter Template: Tips and Hints to Reduce Comments CP Annual Training October 27, 2015 Sydney Poole – DERR.
HAPPY HALLOWEEN 2015 CERTIFIED PROFESSIONAL ANNUAL TRAINING Sue Kroeger and Sue Netzly-Watkins, Ohio EPA Opening the covenant crypt…
Update: AUL Guidance Revisions Summary of Comments June 23, 2011 Peggy Shaw Workgroup Chair.
SABR Updates Amy Yersavich, Ohio EPA VAP Certified Professional Annual Training October 27, 2015.
How does the VAP handle COCs that have left the VAP Property? Certified Professional Coffee February 24, 2016 Sydney Poole DERR-VAP.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Waste Management Workshop FUTURE PROOFING WASTE MANAGEMENT IN SOUTH AFRICA 6 June 2013 Environmental/Waste challenges facing South Africa.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Long-Term Management of Contaminated Soil and Groundwater – Iwilei District, Honolulu April 16, 2015.
Vapor Study Informational Meeting General Mills/Henkel Corp. Superfund Site Van Cleve Recreation Center November 12, 2013 Minnesota Department of Health.
Brownfields 101 Environmental Engineering Considerations Presented By: Ileen Gladstone, P.E., LSP, LEED.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Brownfields 2004, “Light or Heavy Starch: Cleaning the Cleaners” September 2004 Presented by Matt Shurtliff Roosevelt Towne Apartments.
The Indoor Inhalation Exposure Route Heather Nifong Illinois EPA May 5, 2008.
Institutional Controls in Pennsylvania’s Brownfields Program Presented by: Jill Gaito Director, Brownfields Action Team Office of Community Revitalization.
Welcome to the World of AUL Avoiding the voidance of your CNS.
ASTM Standard Practice for Assessment of Vapor Intrusion Into Structures on Property Involved in Real Estate Transactions: Status Report presented by Anthony.
Proposed Plan for No Further Action
Dry Cleaning and the Environment
Overview of Part 213 Amendments Senate Bill 717 – Act 381 of 2016
Redevelopment Authority of the County of Washington O
Chemical Metals Industries, Inc. (CMI)
Sean Anderson, P.Eng., QPESA Steve Russell, B.Sc., QPRA
Connecticut Remediation Standard Regulations: Volatilization Criteria
Hold Your Breath—Ohio EPA’s TCE Initiative
Chemical Metals Industries, Inc. (CMI)
the path less traveled Termination of Post Closure Care
Presentation transcript:

The World of AUL Presentation by: Atul Pandey, P.E. PANDEY Environmental, LLC 2016 Ohio Brownfield Conference April 7, 2016

AUL – Activity and Use Limitation What is it? When is it needed? How is it recorded? Who is responsible? What are some examples of AUL?

AUL – What Is It? “Activity and use limitations” are one or more restrictions or obligations created under sections to of the Revised Code with respect to real property. Activity and use limitations eliminate or mitigate exposure to a release of hazardous substances or petroleum. Examples of activity and use limitations include but are not limited to land use limitations and ground water use restrictions. The term is known as institutional controls in rules , , , , , and of the Administrative Code.

When Is It Needed? When there is a remedy or demonstration of compliance obligation In the VAP Timing of recordation of AUL is post NFA issuance

How Is It Recorded? In the form of an Environmental Covenant (EC) On the deed of the property Usually within 30 days, if part of a Covenant Not to Sue (CNS) package CNS not effective unless EC recorded

Who Is Responsible? The Volunteer(s) as named on the CNS CP NOT responsible unless explicitly retained by Volunteer to do so

Examples of AUL Commercial/ Industrial Land Use Prohibition on Groundwater Use Prohibition on Subsurface Structures for human occupancy, i.e., basements Vapor Intrusion (VI) Pathway AUL

Vapor Intrusion (VI) AUL Usually proposed when VI risk identified for current or reasonably anticipated land uses Remedy is proposed or active remedy not taken Either could not reach source due to buildings or other site factors Or cost Or unknown development (usually the case)

VI AUL If the NFA letter did not demonstrate future buildings complies with VI standards Assess VI risk once development becomes known

VI Pathway AUL Limitation on building occupancy – remedy or demonstration obligation Occupancy may occur after: Engineering control installed and made subject to O&M plan and agreement or Demonstration by CP that no (more) remedy is needed to meet the standards

Time For a New Building? Which AUL option fits? Active remedy? Engineering control?

Time for a New Building After CNS, a new building is planned Assessment (active remedy, if needed) supports that VI standards are met without any controls CP makes demonstration Submits to Ohio EPA – Life goes on...

Time for a New Building If active remedy is implemented to meet VI standards Revise the O&M agreement if it exists Swap out ‘parts’ with the older O&M agreement

Time for a New Building What if? O&M plan just wasn’t needed for NFA letter (AUL used) Create O&M Plan/Agreement Execute agreement, amend CNS

Case Study Former State Road Shopping Center Cuyahoga Falls, OH aka Portage Crossing Development

Property Overview Approx. 24 acres of historically commercial / industrial land Contained a variety of vacant and occupied retail stores with potential environmental impact including: Dry cleaners Auto service stations Auto fueling station Adjacent to historical sites with potential environmental impacts including: Dry cleaners Auto service stations Auto fueling stations

Areas of Concern (Identified Areas)

Groundwater Contamination Concentrations of perchloroethylene were found to exist on the property at high concentrations. Phase II investigations revealed that off-property historical dry cleaning sources were responsible for the majority of the contamination.

Groundwater Solutions Due to contamination sources being comingled, J&E modeling was used to show that the on-site maximum concentration passed vapor intrusion risk thresholds on most of the property (but not all). Institutional controls proposed include: Vapor barrier on future building footpads (in VI failing areas) Commercial / Industrial end use No groundwater use allowed on property

In Conclusion… An NFA Letter was issued in 2013 With soil remediation completed and proposed groundwater restrictions in place, acceptable risk levels were met for development CNS issued by Ohio EPA in 2014

In Conclusion CNS issued with EC with VI pathway AUL (no building yet) Later that year….development’s first building was ready to open for business, but did not yet complete AUL obligations Volunteer contacted CP, who coordinated with Ohio EPA on approach CP drafted O&M plan and proposed agreement with close coordination with Ohio EPA CP submitted certification of effective VI controls

CNS for State Road Shopping Center AUL Language

Portage Crossing Development Underway! In 2014, 7 building projects announced and construction quickly began

Portage Crossing Development Only 5 of 7 buildings within the VI AUL area Further complications arise when multiple tenants in a building are planned

Portage Crossing Development CP contacts Ohio EPA – informs them of plans at site What should we do Uncharted territory

Portage Crossing Development Ohio EPA NEDO & CO work with CP & Volunteer to develop an O&M plan for engineering control Engineering control for each building is a Vapor Barrier (Geo-Seal TM ) system

Portage Crossing Development Each tenant unit in each building treated as its own ‘certification unit’ Each tenant unit has its own ‘engineering control’ Vapor Barrier system has vapor vents that penetrate through the floor slab and discharge to the atmosphere through roof vents (stacks) running along building columns

Portage Crossing Development Each ‘stack’ treated as its own compliance point in the O&M plan Some units have more than 1 stack

Portage Crossing Development The O&M plan provides a schedule for frequent testing of stacks Once every quarter/semi-annually thereafter If no exceedances, then sampling of stack can cease

Portage Crossing Development The stack ‘exit’ criteria are soil gas concentrations for select chemicals of concern Applicable standards for indoor air and associated soil gas values* Contaminant of Concern (COC) Soil Gas Screening Value (Stack Vent) in pg/m 3 Indoor Air Standard pg/m 3 Benzene52016 Tetrachloroethylene (PCE) Trichloroethylene (TCE) *values listed are for single chemical. Adjustment must be made for the presence of multiple chemicals when reporting results.

Portage Crossing Development Unit Certification Process Each tenant unit is sprayed with Geo-Seal TM Vapor Barrier The Vapor Barrier system consists of a venting layer with venting layer with vent risers (stacks) These vent risers discharge to the rooftop and run through the building along a column support

Portage Crossing Development Unit Certification Process We prepare and submit a ‘Unit Certification Report’ to OEPA-NEDO once engineering control is implemented OEPA reviews and approves OEPA invoices the volunteer for review costs under a Technical Assistance account

Portage Crossing Development Upon completion of review, OEPA issues an approval letter of Unit Certification Report Unit cannot be occupied for routine human occupancy until Engineering Control is implemented

Portage Crossing Development Soon after occupancy, the stack testing protocol kicks in

Portage Crossing Development - Status Several units have been constructed, unit certified, and occupied

Portage Crossing Development - Status Several units have passed quarters of stack testing If things go as anticipated, O&M plan/agreement should terminate in 2018

Portage Crossing Development Vapor Barrier Install Example

Portage Crossing Development Vapor Barrier Install Example

Portage Crossing Development Vapor Barrier Install Example

Portage Crossing Development Vapor Barrier Install Example

Portage Crossing Development Vapor Barrier Install Example

Portage Crossing Development Vapor Barrier Install Example

Questions?