Protocol Revision Subcommittee Sandy Morris May 5, 2011.

Slides:



Advertisements
Similar presentations
Protocol Revision Subcommittee Tom Burke June 28, 2012.
Advertisements

Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
Protocol Revision Subcommittee Tom Burke July 2, 2013.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Protocol Revision Subcommittee Sandy Morris October 6, 2011.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
1 Impact Assessment of Parking Deck NPRRs/SCRs/NOGRRs Phase 1 March 2011.
1 Impact Assessment of Parking Deck and New NPRRs/SCRs Phase 1 February 2011.
NPRRs NPRR 681 Clarifications to Dynamic Ratings. This Nodal Protocol Revision Request (NPRR) adds clarification for Dynamic Ratings provided via ICCP.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
TAC Meeting Update. Board Update and TAC Voting Item Kenan Ogelman, Vice Chair of TAC gave the Board Update. It included recommendation that TAC.
Item 5: PRS Report John Varnell 2014 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public August 28, 2014.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
Protocol Revision Subcommittee Sandy Morris December 1, 2011.
Protocol Revision Subcommittee Tom Burke June 7, 2012.
MISUG Meeting Materials ERCOT 4/28/ MISUG4/28/2011 Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3.Market Data.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 9, 2009.
Project Funding Report November 1, Business Integration Update – Agenda –Project Portfolio Updatep Revision Request Funding Reconciliation.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
Kenan Ogelman 2012 TAC Chair Tab 7: TAC Report Board of Directors Meeting ERCOT Public November 13,
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management August 18, 2011.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
Technical Advisory Committee (TAC) update to RMS Kathy Scott January 3, 2013Technical Advisory Committee 1.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2004.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 6, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 16, 2007.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Protocol Revision Subcommittee Tom Burke April 5, 2012.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
1 Business Integration Update April –2011 Project Portfolio Update p. 3-7 Project Portfolio Gantt Chart Recent Developments –Remaining Phases.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
Protocol Revision Subcommittee Tom Burke January 3, 2013.
Protocol Revision Subcommittee John Varnell September 5, 2013.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors November 17, 2008.
Protocol Revision Subcommittee Sandy Morris August 4, 2011.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 05, 2008.
Protocol Revision Subcommittee
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Protocol Revision Subcommittee
Initial ERCOT Parking Deck Prioritization Recommendation
Initial ERCOT Parking Deck Prioritization Recommendation
Presentation transcript:

Protocol Revision Subcommittee Sandy Morris May 5, 2011

2 Summary of Revision Requests 8 NPRRs Recommended for Approval

3 Items for a Vote Unanimous Recommendations with No Impacts NPRR311, Correction of Wind Adjust Formula to Account for Daylight Savings Time NPRR317, Clarification of Entity Responsible for Hydro Responsive Testing NPRR318, Alignment of Nodal Registration Requirements with Current Registration Process

4 Items for a Vote Non-unanimous Recommendations NPRR264, Clarification of Nodal Protocol Requirements for Generators With Multiple Points of Interconnection NPRR326, Adjust the Calculation of the Real-Time Settlement Point Price for a Resource Node NPRR330, Change in Frequency of Five Protocol Required Audits from Annual to Periodic NPRR350, Change to the Security Classification of the System Ancillary Service Capacity Monitor Dashboard – URGENT NPRR352, Real-Time HSL Telemetry for WGRs - URGENT

5 NPRRs Recommended for Approval

6 NPRR264, Clarification of Nodal Protocol Requirements for Generators With Multiple Points of Interconnection Purpose (WMS) This NPRR adds language to specify that Nodal Protocol requirements applicable to Generation Resources which are based upon the date of an executed Standard Generation Interconnection Agreement (SGIA) are applied to the date of the original SGIA for Resources with more than one point of interconnection. PRS VoteOn 3/24/11, PRS voted to recommend approval of NPRR264 as amended by the 1/11/11 ERCOT comments and as revised by PRS. There was one abstention from the Investor Owned Utility (IOU) Market Segment. On 4/21/11, PRS unanimously voted to endorse and forward the 3/24/11 PRS Report and Impact Analysis for NPRR264 to TAC. Effective Date/PriorityJuly 1, 2011 ERCOT ImpactNo impacts

7 NPRR311, Correction of Wind Adjust Formula to Account for Daylight Savings Time Purpose (ERCOT) This NPRR corrects the formula for the reduction of wind excess generation to account for Daylight Savings Time (DST) adjustments in the Spring and Fall for Electric Service Identifiers (ESI ID)s with non-Interval Data Recorders (IDR)s. PRS VoteOn 3/24/11, PRS unanimously voted to recommend approval of NPRR311 as submitted. On 4/21/11, PRS unanimously voted to endorse and forward the 3/24/11 PRS Report and Impact Analysis for NPRR311 to TAC. Effective Date/PriorityUpon System Implementation ERCOT ImpactNo additional impacts to implement NPRR311 beyond what was captured in the Impact Analysis for NPRR208, Registration and Settlement of Distributed Generation (DG) Less Than One MW.

8 NPRR317, Clarification of Entity Responsible for Hydro Responsive Testing Purpose (ERCOT) This NPRR clarifies the Entity responsible for hydro responsive testing. PRS VoteOn 3/24/11, PRS unanimously voted to recommend approval of NPRR317 as submitted. On 4/21/11, PRS unanimously voted to endorse and forward the 3/24/11 PRS Report and Impact Analysis for NPRR317 to TAC. Effective Date/PriorityJuly 1, 2011 ERCOT ImpactNo impacts

9 NPRR318, Alignment of Nodal Registration Requirements with Current Registration Process Purpose (ERCOT) This NPRR aligns the registration requirements in Section 16.1, Qualification, Registration, and Execution of Agreements, with the current registration process. PRS VoteOn 3/24/11, PRS unanimously voted to recommend approval of NPRR318 as submitted. On 4/21/11, PRS unanimously voted to endorse and forward the 3/24/11 PRS Report and Impact Analysis for NPRR318 to TAC. Effective Date/PriorityJuly 1, 2011 ERCOT ImpactNo impacts

10 NPRR326, Adjust the Calculation of the Real-Time Settlement Point Price for a Resource Node Purpose (ERCOT) This NPRR adjusts the calculation of the Real-Time Settlement Point Price for a Resource Node. The adjustment is to remove the Base Point weighting of the Real-Time Locational Marginal Prices. PRS VoteOn 3/24/11, PRS voted to recommend approval of NPRR326 as submitted. There were two abstentions from the IPM and Consumer Market Segments. On 4/21/11, PRS voted to endorse and forward the 3/24/11 PRS Report, Impact Analysis and Cost Benefit Analysis as revised by PRS for NPRR326 to TAC with a recommended priority of High and rank of There were two abstentions from the Independent Generator and Consumer Market Segments. Effective Date/PriorityUpon System Implementation – Priority High; Rank 12.9 ERCOT Impact$15k - $20k (2011 Post Go-Live Funding); impacts to Market Management System (MMS). Cost Benefit Analysis Highlights Net (Cost) - Benefit of $92k; Cost Benefit Ratio of 6.1 More accurate dollar amounts for PTP Obligations and PTP Options settled in Real-Time. Improve the accuracy of the Real-Time Energy Imbalance at a Resource Node. Market benefit of mitigating DAM solution risk.

11 NPRR330, Change in Frequency of Five Protocol Required Audits from Annual to Periodic Purpose (ERCOT) This NPRR revises the frequency for the ERCOT Internal Audit Department to perform audits from an annual basis to a periodic basis. PRS VoteOn 3/24/11, PRS voted to recommend approval of NPRR330 as revised by PRS. There was one abstention from the Consumer Market Segment. On 4/21/11, PRS unanimously voted to endorse and forward the 3/24/11 PRS Report as amended by the 4/5/11 ERCOT comments and Impact Analysis for NPRR330 to TAC. Effective Date/PriorityJuly 1, 2011 ERCOT ImpactNo impacts

12 NPRR350, Change to the Security Classification of the System Ancillary Service Capacity Monitor Dashboard - URGENT Purpose (MIS User Group) This NPRR proposes changing the posting category of items that make up the System Ancillary Service Capacity Monitor Dashboard from Market Information System (MIS) Secure Area to MIS Public Area. PRS VoteOn 4/21/11, PRS voted to grant NPRR350 Urgent status. There was one opposing vote from the Independent Generator Market Segment and two abstentions from the Municipal and IPM Market Segments. PRS then voted to recommend approval of NPRR350 as submitted and to forward NPRR350 to TAC. There was one abstention from the Independent Generator Market Segment. Effective Date/PriorityUpon System Implementation – Priority and Rank Pending ERCOT Impact$5k - $10k (2011 Post Go-Live Funding); impacts to Current Day Reporting (CDR), MIS, and ERCOT.com. Cost Benefit Analysis Highlights Increases transparency Provides enhanced public visibility into ERCOT system conditions Potential for reduction of Digital Certificate cost and administration Enables more level playing field between certificate and non- certificate holders Enables development of new products by third parties.

13 NPRR352, Real-Time HSL Telemetry for WGRs - URGENT Purpose (ERCOT) This NPRR changes the process by which Qualified Scheduling Entities (QSEs) determine the HSLs to telemeter for Wind- powered Generation Resources (WGRs). The requirement that QSEs set the HSL equal to output immediately following a release from curtailment is removed. Instead QSEs will be expected to use their best judgment to determine the output capability of the WGR with the expectation that the value will consider the net real power of the WGR, turbine availability, weather conditions, and whether the WGR output is being affected by compliance with a Security-Constrained Economic Dispatch (SCED) instruction. PRS VoteOn 4/21/11, PRS unanimously voted to grant NPRR352 Urgent status. PRS then voted to recommend approval of NPRR352 as submitted and to forward NPRR352 to TAC. There was one abstention from the IPM Market Segment. Effective Date/PriorityJune 1, 2011 ERCOT ImpactNo impacts