Marble Cake Process Improvement – Final Review Aaron Delahanty Arwen Sharp Benson Yu Kenyon Zitzka Ryan Norris.

Slides:



Advertisements
Similar presentations
Source Driver Status CMS Week November 2007 P. Debbins University of Iowa.
Advertisements

Feasibility Study of Replacing an Industrial Hydraulic Lift System with an Electro-Mechanical Lift System Critical Design Review Thursday, 21 September.
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Ford/Lincoln Company ECEN 4610 Preliminary Design Review January 28, 2003 Oliver Mansour, Dan Spendley, Davy Odom, Lincoln Ritchie, Kelli Settell.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
P11213: Modular Student Attachment to the Land Vehicle for Education Jared Wolff, Andrew Komendat, Oyetunde Jolaoye, Dylan Rider.
P11310: Parabolic Dish Autopoint Solution Project Family Team Leader: Trae Rogers (ME) Project Engineer: Pat Ryan (EE) Kyle Norlin (ME) Chris Reed (CE)
1. P09203 – 1kg Robotic Motor Module Gen 2 Platform This project is Sponsored by the Kate Gleason Foundation.  Team Members:  Lauren Farnsworth → Team.
FRIDAY, DECEMBER 18, 2009 RYAN MILLER – ME, PROJECT MANAGER CHRIS OXLEY – EE, LEAD ENGINEER RYAN ENYEART – ME, SYSTEM ENGINEER ALEX MANLEY – EE, SYSTEM.
MSD-I Project Review Modular Motion Tracking Sensors 1.
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
Nandini Vemuri (EE) Jason Jack (CE) Ryan Schmitt (CE) Jeff Howe (EE) John Corleto (CE) Emily Phillips (EE) Power Distribution Subsystem Wireless Communication.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
‘Iole o Mãnoa Mouse of Mãnoa. Team Members Jeff Fines Designer, Fabricator, Programmer & Thomas Matsushima Designer, Fabricator, Programmer.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Nandini Vemuri (EE) Jason Jack (CE) Ryan Schmitt (CE) Jeff Howe (EE) John Corleto (CE) Emily Phillips (EE) Power Distribution Subsystem Wireless Communication.
Airbag Automaton John Bailey Hattie Hiatt Chun Hau Low Jason Harwood Wayne Gallup Jason Canaday.
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Mechatronics: An On-Boarding Corporate Training Example Jay Bouis Coordinator of Technical Training The Community College of Baltimore County Penny Jung.
Athletic Field Marking Device Anthony Cortese, Ryan Crump, Matthew Lawler, Patrick Shaughnessy (Team Leader), John Sudia.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PLC: Programmable Logical Controller
The Design Process Drawing And Design For Production Engineering.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
THE ULTIMATE TAILGATE SENIOR DESIGN: P10811 High Level Design Meets or exceeds functions and capacities of stock tailgate Provide a flat work surface for.
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
Reducing Scrap and Rework John Buchowski Director, MCAD Product Management PTC.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
TEAM 14 John Armitage Douglas DeVoto Brian Polkowski Marykate Wioncek SOUTHCO Vibration Fatigue Tester.
Consulting Business Start-up Evaluation Progress Report #2 EMMP Capstone Project Central Team 03/04/2003.
Wegman's Swirl Cake Process Improvement: Detailed Design Review Aaron Delahanty Ryan Norris Arwen Sharp Benson Yu Kenyon Zitzka Nov. 11th, 2011.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
Methodologies. Contents Waterfall Model Evolutionary Models Incremental Development.
1 AutoCAD Electrical 2008 What’s New Name Company AutoCAD Electrical 2008 What’s New AMS CAD Solutions
Drop Testing Apparatus Team Members: Deatly Butler Mark Clouse Chris Dux Kris Honas Shaun Scott Drew Stephens Client: Itron, Inc. Brian Priest Technical.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
DAVID ANDERSON RYAN DUNN BRYON ELSTON ELIZABETH FISCHER ROBERT MENNA GUIDE : BILL NOWAK CUSTOMER: DR. MICHAEL SCHRLAU (ME DEPARTMENT) P13375 : Computer.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
1 TDTWG Report to RMS Recommended Solutions for SCR 745 ERCOT Unplanned System Outages and Failures Wednesday, August 10th.
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
Project Final Presentation Joe Featherall.
What has been accomplished at the end of MSD 1 & 2?
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Meet with groups and guide1 day9/11/2009 Identify team leader1 day9/11/2009 Decide on team norms and behaviors5.5 days9/11/20099/18/2009 Decide group.
7 November 2006Program Management Basics Purdue FIRST Programs Slide 1 Program Management Basics Purdue FIRST Programs Chris Fultz Rolls-Royce Corporation.
Wegmans Swirl Cake Process Improvement Multidisciplinary Senior Design RIT Fall / Winter
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Integrated Hands-On Mechanical System Laboratories Arif Sirinterlikci, Ph.D., Professor of Engineering Tony Kerzmann, Ph.D., Assistant Professor of Mechanical.
AUTOMATED ROD SINGULATION SYSTEM Student: James Welch Concentration: Mechanical Class: ET-494 Spring 2015 Instructor: Dr. Cris Koutsougeras Advisors: Dr.
Project Management Process Interim Update for ERCOT Board of Directors.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
Wegmans Swirl Cake Automation
7th Belle II VXD Workshop, Prague
Component Functionality
P08002-Automated Parallel Bars
Automated Oiling System
Feed horn array sub-system for QUBIC
Control System Summary of Changes Since PDR
Simulated Assembly Line and Processing Workstation
Presentation transcript:

Marble Cake Process Improvement – Final Review Aaron Delahanty Arwen Sharp Benson Yu Kenyon Zitzka Ryan Norris

Presentation Outline Mentality – As a team we have invested a lot into this project and have unavoidably become attached. Despite this, the goal for this final review is to asses our progress up to present, our current project state, and future work in an honest and clear way that provides the most value to our customer. Project Re-scope –Schedule –Customer Needs Current Status –Near future test plans Known Issues Deliverables Project Insights Acknowledgements

Project Re-scope Due mainly to a quickly approaching deadline, fabrication, assembly and testing of the system components critical for task completion have been major focus of the second quarter. Fabrication, assembly, and testing of the following system components has been halted: Cart Shielding Gate Mechanism Team resources have been allocated to: Assembly / calibration of Machine Head Development of test process (product line mock-up) PLC / Controls integration

Project Re-scope – Further Justification Option 1 Force the delivery of a under tested, unproven system Option 2 Deliver well developed machine ‘head’ prototype Spend more resources further investigating primary mechanisms Better develop PLC logic More time testing and revising Provide Wegmans with more thorough documentation (including complete system design)

Current Project Status Completion of Motor Module Motor Gear Train Quick Disconnect Swirlers Complete Assembly of Machine Head/Chassis Pneumatic Actuation Sensor Integration Initial PLC programming complete Sensor / PLC integration Development of a test stand Simulation of product line environment

Initial Motor Module Testing (out of chassis) Swirl performance: Initial Swirlers provide satisfactory results Further refinement of design could significantly improve swirl aesthetics

Near future Test Plans Prototype capability: Full mock-up of bakery conveyor line, designed to test and debug PLC integration Complete sheet pan batter testing Quality Repeatability Process Cycle Time Batter Drip Fatigue / Endurance Testing

Known Issues Vertical Translation – Pneumatics / Guide Rails Design: Root Cause – Design requires unrealistic precision given available resources Warping of box frames Low angular misalignment allowance Even if consistently smooth translation achieved, must be secured as well Potential Solution: Alternative linear bearings Neutrally load the middle frame (Solutions 1 & 2, low cost, easily implemented) Stronger box frame High precision machining Investigation of alternative lift / alignment mechanisms Signal communication between sensors, actuators, PLC Root Cause – Poor schematic documentation Temporary Test Set-up Potential Solution: 1. Complete electrical schematic 2. Cleaner wire routing

Known Issues Inadequate Aesthetic Swirler Performance (unconfirmed): Root Cause – Untested final swirler prototype Variability due to manufacturing Potential Solution: Further testing Swirler redesign and remanufacture (Relatively low cost, easily implemented) Further Pan Alignment Calibration Root Cause – Edge tolerances (Both inductance sensor and Swirler Maximum Radius Condition) Potential Solution: 1.Development of auxiliary guide mechanism 2. Loosen Edge Tolerances (Sacrifice swirl area)

Summary of Deliverables Complete functioning prototype PLC Logic Wiring Schematics Complete CAD library –Drawings –3D models –Hierarchy BOMs Explanation of current design choices and recommendations for future work

General Insights / Recommendations for future work Early communication with machinists Lack of PLC / ladder logic from either ME or EE RIT curriculum Make availability of resources known PLC programming Wegmans recommended parts and specs Manufacturability of Design

Acknowledgments Professor John Kaemmerlen Mike Least Gary Kittrell Rick Norder Tony Contrera and Dean Wight Professor Scott Bellinger and his class

And thank you to Wegmans for the opportunity.