Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.

Slides:



Advertisements
Similar presentations
Chapter 6 Annual Equivalence Analysis
Advertisements

1 By Assoc. Prof. Dr. Ahmet ÖZTAŞ Gaziantep University Department of Civil Engineering CHP V-ANNUAL WORTH ANALYSIS CE ECONOMIC DECISION ANALYSIS.
Engineering Economy Practice Problems
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
ENGINEERING ECONOMY DR. MAISARA MOHYELDIN GASIM Chapter 4-5 Comparison of Alternatives Annual Worth Analysis.
Evaluating Business and Engineering Assets Payback Period.
ENGINEERING ECONOMY DR. MAISARA MOHYELDIN GASIM Chapter 4-5 Comparison of Alternatives Annual Worth Analysis.
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
Annual Worth Analysis Lecture No.18 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Dealing With Uncertainty
Chapter 11 Replacement Decisions
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
Sensitivity and Breakeven Analysis
Chapter 15 Replacement Decisions
Machine Replacement or Retention Pertemuan 21 s.d 22 Matakuliah: D 0094 Ekonomi Teknik Tahun: 2007.
Contemporary Engineering Economics, 4 th edition, © 2007 Life-Cycle Cost Analysis Lecture No.22 Chapter 6 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Annual Equivalent Worth Criterion Lecture No.17 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary engineering Economics, 4 th edition, © 2007 Design Economics Lecture No.23 Chapter 6 Contemporary Engineering Economics Copyright © 2006.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. 1 Blank & Tarquin: 5th Edition. Ch. 6 Authored by: Dr. Don.
Chapter 8 Annual Equivalent Worth Analysis
Annual Equivalent Worth Criterion
Present Worth Analysis Lecture slides to accompany
Lecture slides to accompany
Engineering Economy IEN255 Chapter 5 - Annual Equivalent Worth Analysis  Another common method  Equal payments on an annual basis  Convert NPW to AE.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Annual Equivalent Worth Criterion.
Comparing Projects Using Time Value of Money
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Lecture No.19 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Developed.
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
ENGINEERING ECONOMICS ISE460 SESSION 13 Annual Equivalent, June 17, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? Annual Equivalent Examples.
Evaluating a Single Project
L15: Present Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Design Economics Lecture No. 22 Chapter.
L29: Sensitivity and Breakeven Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Present Worth and Annual Worth Course Outline 6.
Chapter 7 Annual Worth Analysis.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Applying Annual Worth Analysis Lecture.
Contemporary Engineering Economics, 4 th edition, © 2007 Applying Annual Worth Analysis Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright.
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Incremental Analysis Lecture No.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Powerpoint Templates Page 1 Powerpoint Templates Chapter 7 An Economic Appraisal II: NPV, AE, IRR Technique.
Project cash flow n A B Example 1: Consider the following two mutually exclusive investment projects. Assume.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Annual Worth Analysis Course Outline 5.
L18: Annual Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Annual Equivalence Analysis Chapter 6 Fundmentals of Engineering Economics Copyright © 2008.
Variations in Present Worth Analysis
Applying Annual Worth Analysis
Annual Equivalent Worth Criterion
Present Worth Analysis Lecture slides to accompany
Discounted Cash Flow Analysis
Chapter 7 Present Worth Analysis
Present Worth Analysis Lecture slides to accompany
Present Worth Analysis Lecture slides to accompany
Chapter 6: Comparison and Selection Among Alternatives
Adopted and modified by Dr. W-.W. Li of UTEP, Fall, 2003
Applying Annual Worth Analysis
OUTLINE Questions? News? New homework due Wednesday
OUTLINE Questions? News? New homework due Wednesday
Presentation transcript:

Chapter 6 Annual Equivalent Worth Criterion

Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually exclusive projects

Annual Worth Analysis Principle: Measure an investment worth on annual basis Find the net present worth of the original series and multiply by the capital recovery factor Annual Equivalent (AE) = PW (A/P,i%,N)

Annual Worth Analysis Evaluating a single revenue project AE > 0  accept the investment AE = 0  indifferent AE < 0  reject the investment Comparing multiple alternatives Revenue project: alternative with highest AE is selected Service project: alternative with lowest annual equivalent cost is selected

Annual Worth Analysis Benefit: By knowing the annual equivalent worth, we can: Seek consistency with the annual report format Determine the unit cost (or unit profit) Facilitate the unequal project life comparison

Computing Equivalent Annual Worth $15 $3.5 $5 $12 $ A = $ AE(15%) = $6.946(A/P, 15%, 6) = $1.835 $ PW(15%) = $6.946 $9 $10

Annual Equivalent Worth - Repeating Cash Flow Cycles $500 $700 $800 $400 $500 $700 $800 $400 $1,000 Repeating cycle

First Cycle: PW(10%) = -$1,000 + $500 (P/F, 10%, 1) $400 (P/F, 10%, 5) = $1, AE(10%) = $1, (A/P, 10%, 5) = $ Both Cycles: PW(10%) = $1, $1, (P/F, 10%, 5) = $1, AE(10%) = $1, (A/P, 10%,10) = $304.87

Annual Equivalent Cost When only costs are involved, the AE method is called the annual equivalent cost. Revenues must cover two kinds of costs: Operating costs (incurred by operation of plants or equipment) and Capital costs (incurred by purchasing the assets). Capital costs are one-time costs, whereas operating costs are recurring. Capital costs Operating costs + Annual Equivalent Costs

Capital (Ownership) Costs Def: Owning an equipment is associated with two transactions—(1) its initial cost (I) and (2) its salvage value (S). Capital recovery cost: the annual equivalent of a capital cost N 0 N I S CR(i)

Example What is the equivalent annual cost of a machine that has an initial cost of $8,000, a salvage value of $500 after 8 years and annual operating costs of $900 if MARR=20%?

Solution AE = 8000 (A/P,20%,8) – 500 (A/F,20%,8) = 8000 (0.2606) – 500 (0.0606) = $ OR AE = ( ) (A/P,20%,8) (0.2) = 7500 (0.2606) = $2954.5

Example

Applying Annual Worth Analysis Some economic analysis problems can be solved more efficiently by annual worth analysis Unit Cost (Unit Profit) Calculation Make-or-Buy Decision

Unit Cost (Unit Profit) Calculation Determine the number of units to be produced each year Identify the cash flow series Calculate the annual worth Divide the annual worth by the number of units to be produced each year. If the number of units varies, then convert to equivalent annual units.

Example Equivalent Worth per Unit of Time $24,400 $55,760 $27,340 $75,000 Operating Hours per Year 2,000 hrs. Compute the equivalent savings per machine hour with i=15%.

Example Equivalent Worth per Unit of Time PW (15%) = -75,000+24,400(P/F,15%,1) +27,370(P/F,15%,2)+55,760(P/F,15%,3) = $3,553 AE (15%) = $3,553 (A/P, 15%, 3) = $1,556 Savings per Machine Hour = $1,556/2,000 = $0.78/hr.

Example: Mutually Exclusive Alternatives with Equal Project Lives StandardPremium MotorEfficient Motor25 HP $13,000$15,60020 Years$0 89.5%93%$0.07/kWh3,120 hrs/yr. Size Cost Life Salvage Efficiency Energy Cost Operating Hours (a) At i= 13%, determine the operating cost per kWh for each motor. (b) At what operating hours are they equivalent?

Solution: (a) Operating cost per kWh per unit Determine total input power 1 HP = kW  25HP=18.65 kW  Standard motor: input power = kW/ = kW  PE motor: input power = kW/ 0.93 = kW

Determine total kWh per year with 3120 hours of operation  Standard motor: 3120 hrs/yr ( kW) = 65,018 kWh/yr  PE motor: 3120 hrs/yr ( kW) = 62,568 kWh/yr Determine annual energy costs at $0.07/kwh:  Standard motor: $0.07/kwh  65,018 kwh/yr = $4,551/yr  PE motor: $0.07/kwh  62,568 kwh/yr = $4,380/yr

Capital cost:  Standard motor : $13,000(A/P, 13%, 20) = $1,851  PE motor : $15,600(A/P, 13%, 20) = $2,221 Total annual equivalent cost = Capital Cost + Energy Cost  Standard motor: AE(13%) = $4,551 + $1,851 = $6,402 Cost per output kwh = $6,402/58,188* kwh = $0.11/kwh  PE motor: AE(13%) = $4,380 + $2,221 = $6,601 Cost per output kwh = $6,601/58,188 kwh = $0.1134/kwh (* 58,188 kwh/year = 3120 hours/year*25 HP*0.7457kwh/HP)

(b) break-even Operating Hours = 6,742

Model A: $12,500 $5,000 $3,000 Model B: $15,000 $4,000 $2,500 Example: Mutually Exclusive Alternatives with Unequal Project Lives Required service Period = Indefinite Analysis period = LCM (3,4) = 12 years

Model A: $12,500 $5,000 $3, First Cycle: PW(15%) = -$12,500 - $5,000 (P/A, 15%, 2) - $3,000 (P/F, 15%, 3) = -$22,601 AE(15%) = -$22,601(A/P, 15%, 3) = -$9,899 With 4 replacement cycles: PW(15%) = -$22,601 [1 + (P/F, 15%, 3) + (P/F, 15%, 6) + (P/F, 15%, 9)] = -$53,657 AE(15%) = -$53,657(A/P, 15%, 12) = -$9,899

Model B: $15,000 $4,000 $2, $4,000 First Cycle: PW(15%) = - $15,000 - $4,000 (P/A, 15%, 3) - $2,500 (P/F, 15%, 4) = -$25,562 AE(15%) = -$25,562(A/P, 15%, 4) = -$8,954 With 3 replacement cycles: PW(15%) = -$25,562 [1 + (P/F, 15%, 4) + (P/F, 15%, 8)] = -$48,534 AE(15%) = -$48,534(A/P, 15%, 12) = -$8,954

Summary Annual equivalent worth analysis, or AE, is—along with present worth analysis—one of two main analysis techniques based on the concept of equivalence. The equation for AE is AE(i) = PW(i)(A/P, i, N). AE analysis yields the same decision result as PW analysis.

The capital recovery cost factor, or CR(i), is one of the most important applications of AE analysis in that it allows managers to calculate an annual equivalent cost of capital for ease of itemization with annual operating costs. The equation for CR(i) is CR(i)= (I – S)(A/P, i, N) + iS, where I = initial cost and S = salvage value.

AE analysis is recommended over NPW analysis in many key real-world situations for the following reasons: 1. In many financial reports, an annual equivalent value is preferred to a present worth value. 2. Calculation of unit costs is often required to determine reasonable pricing for sale items. 3. Calculation of cost per unit of use is required to reimburse employees for business use of personal cars. 4. Make-or-buy decisions usually require the development of unit costs for the various alternatives.