7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Classification: Internal Status: Draft Statoils view on the ERGEG GRI Secondary Capacity work Helga Franse – EU & Regulatory Affairs Stockholm – 26 November.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Gas Regional Initiative - Region North / North-West Stakeholders Group Meeting The Hague, October 9th, 2006.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.
Erik Sleutjes (Ofgem) GRI NW Government Meeting The Hague, 6 May 2010 Pilot framework guideline on gas balancing – ERGEG initial steps.
Energy Information Administration Markets, Hubs, Trading Places, and Capacity Release Markets by John H. Herbert.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
26 November th Stakeholder Group Meeting of the Gas Regional Initiative North-West (GRI NW) Brussels, 26 November 2010 Mark Hobbelink Wiekens, GTS.
Pilot Project on Market Coupling PEG Nord / PEG Sud 3rd Workshop on Gas Target Model London 11 APRIL 2011.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
NW GRI Investment Project Virtual Test Case Adam Cooper - EFET.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
DEVELOPMENT OF GAS HUBS South Gas Regional Initiative Madrid, 29th October 2007.
Madrid Forum, 17 October 2007 Gas Regional Initiative Coherence and Convergence.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Gas Regional Initiative – North West Region Governmental Meeting 6 May 2010 – The Hague Secondary capacity markets Project update Betsy ANNEN – CRE Bernhard.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Hub liquidity and efficient transmission and trade of gas between hubs 1.Introduction 2.Operator survey 3.Key issues 4.Way forward.
International Association of Oil and Gas Producers Stakeholder view of EFET R_ISO Proposal Prague – 21 January 2008.
6th Stakeholder Group meeting Stockholm – 26 November 2009 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer,
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Gas Regional Initiative – North West Region RCC meeting The Hague – 5 th July, 2010 Secondary capacity markets Project update.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Gas Regional Initiative South South-East
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Background and Process
Gas Regional Initiative South South-East
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Gas Regional Initiative South South-East
Presentation transcript:

7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON Ruhrgas

2 7th Stakeholder Group meeting The Hague – 07 May 2010 Context ● ERGEG agenda: pilot framework guideline on capacity allocation ● Focus on primary allocation ● Auctions ● Standard bundled products ● Development of “hub to hub” market organization ● Secondary markets for capacity ● Important to provide some flexibility to shippers ● Highly influenced by primary allocation ● Domination of OTC

3 7th Stakeholder Group meeting The Hague – 07 May 2010 What target model for secondary trading? ● Background for efficient secondary markets ● A well functioning primary market is necessary for efficient secondary markets ● The value of secondary capacity depends on the price of primary capacity ● Hub development is an incentive to secondary capacity trading ● Perspectives ● Relevant size for platforms ● Develop secondary markets consistently with the target model for CAM

4 7th Stakeholder Group meeting The Hague – 07 May 2010 Today’s secondary markets can be improved ● Shippers can offer unused transport capacity to other market participants in need of capacity ● This “secondary” trading thus helps to optimize capacity portfolios and facilitates access to capacity ● In particular secondary trading of cross-border capacities supports regional integration ● Currently 3 platforms offer secondary trading in N-W region ● But: liquidity of secondary market should be enhanced to improve access to capacity

5 7th Stakeholder Group meeting The Hague – 07 May 2010 Why platforms? ● Value added by platforms ● Transparency ● Non-discrimination ● Reduction of complexity ● Price reflecting the balance between supply and demand ● Risks and challenges ● Liquidity and value of secondary capacity ● Market power of dominant shippers ● Building stakeholders’ confidence ● Anonymity

6 7th Stakeholder Group meeting The Hague – 07 May 2010 How to enhance platforms active in N-W? ● GRI N-W project aims at further developing the existing platforms ● Capsquare ● trac-x ● APX-Endex ● Products, processes, booking points, contracts, … ● To make the “right” changes we need to fully understand the barriers to trade ● Detailed input by market parties required  Currently a survey is taking place

7 7th Stakeholder Group meeting The Hague – 07 May 2010 Survey on secondary trading (1/2) ● Addresses active and “inactive” shippers (with regard to secondary trading) Answers collected by regulators and confidentiality is guaranteed. Results presented to the stakeholders of the GRI NW but aggregated and anonymously. Survey launched mid-April. Distributed by different groups of stakeholders:  Platform: trac-x  Associations: EFET, BDEW, bne, Dutch Energiened, …  Program Office Results will be basis for report (together with complementary analysis of platform trading data)

8 7th Stakeholder Group meeting The Hague – 07 May 2010 Survey on secondary trading (2/2) General interest for secondary market Use of secondary market (seller and buyer sides) Allocation method Counterparty issue Products Interconnection points Operating hours / trading windows Transfer of capacity A questionnaire focused on specific design of products and procedures (13 questions), written in common by the 3 platform operators, TSOs, shippers and regulators.

9 7th Stakeholder Group meeting The Hague – 07 May 2010 Preliminary results (1/3)  Strong interest of the market: until now 25 answers received 40% large companies 40% medium companies 20% small companies *  Almost all answering companies have already done / tried to do secondary capacity trading. For 52%, this topic is of average importance. * Category (small, medium, large) chosen by the companies themselves

10 7th Stakeholder Group meeting The Hague – 07 May 2010 Preliminary results (2/3) ON THE SELLER SIDE  70% of the companies try to sell capacity on secondary markets to decrease sunk costs of firm primary capacity bookings partly not used.  But, many of them are generally not successful in trying to sell these capacities on platforms. The main reasons provided are: The interconnection points covered were not the right ones No market demand at the price required  Those who are successful trade their capacities via OTC and not platform.  For some companies, the lack of liquidity on platforms is due to: The lack of standardized set of products The lack of possibility for sellers to chose with which parties to trade The lack of economic interest: too short duration compared to high transaction costs The lack of gas market maturity

11 7th Stakeholder Group meeting The Hague – 07 May 2010 Preliminary results (3/3) ON THE BUYER SIDE  76% of the answering companies tried to buy capacity on the secondary market.  Their main objectives were to: Cope with the lack of available primary capacity (68%) Durations of primary capacity were not optimal (24%) Supply customers (52%) Arbitrate between hubs and markets (48%)  In trying to buy capacity, these companies met limited success. For them, this is mainly due to: The interesting interconnection points were not covered by platforms The gas market is not mature enough The lack of standard contract framework No possibility to trade on both sides of one interconnection point at the same time

12 7th Stakeholder Group meeting The Hague – 07 May 2010 Your participation in survey is needed ● Your input is essential to ensure that problems are solved and changes are market driven! ● If you want to influence market design, please take part in the survey ● Regardless of whether you have already traded secondary capacity or not ● What counts is that you have an interest in the market ● New deadline: 21 May 2010  URL: /Priorities1/Capacity/Secondary%20markets ● Next steps:  collect further responses  detailed analysis  agree on amendments to platforms  develop long-term view for project

13 7th Stakeholder Group meeting The Hague – 07 May 2010 Questions related to the project ● Interconnection points covered by the platforms ● Add new IPs? ● Standardization of products ● Same products as on primary markets? ● Bundling? ● Defining standard volumes? ● Standardization of contracts? ● Coordination with the EU agenda

14 7th Stakeholder Group meeting The Hague – 07 May 2010 THANK YOU FOR YOUR ATTENTION!

15 7th Stakeholder Group meeting The Hague – 07 May 2010 Appendix

16 7th Stakeholder Group meeting The Hague – 07 May 2010 Capacity transfer