Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.

Slides:



Advertisements
Similar presentations
Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
Advertisements

Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova /02/20111SPSU meeting.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
Theoretical studies of IBS in the SPS F. Antoniou, H. Bartosik, T. Bohl, Y.Papaphilippou MSWG – LIU meeting, 1/10/2013.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
SPS Scrubbing Runs 2014 week 45 and week 50 (part I) H. Bartosik, G. Iadarola, K. Li, L. Mether, G. Rumolo, M. Schenk Thanks to: SPS OP crew, G. Arduini,
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Lessons from SPS studies in 2010 E. Shaposhnikova Chamonix’11 session 09: LHC injectors upgrade.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
RF improvements over the weekend Giulia on behalf of Delphine, Philippe, Andy and many other people in the RF team LHC Beam Commissioning Working Group,
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Crossing transition at RHIC V.Ptitsyn, N.Abreu, M. Brennan, M.Blaskiewicz, W. Fischer, C. Montag, R. Lee, S.Tepikian.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
Momentum slip-stacking of the nominal I-LHC beam in the SPS Particle simulations (preliminary) T. Argyropoulos, E. Shaposhnikova LIU-SPS BD WG 30/01/2014.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting
Longitudinal Limitations of Beams for the LHC in the CERN PS 0.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Longitudinal impedance of the SPS
Plans for ions in the injector complex D
Space charge studies at the SPS
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Multiturn extraction for PS2
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
The LHC25ns cycle in the PS Triple splitting after 2nd injection
Introduction to LHC beam production in PSB and PS
Beam dynamics requirements after LS2
Generation of Higher Brightness Beams for LHC
Collective effects in the SPS and LHC (longitudinal plane)
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V. Kain, G. Kotzian

Measurements in 2015: general remarks 1 st LHC Pb run after LS1 More experience with Q20 → better transmission than before LS1 (now similar to Q26) Beam transmission strongly depends on intensity Beam is unstable in longitudinal plane after transition crossing PS controlled emittance blow-up helps for the SPS beam SPS controlled emittance blow-up was tried many times in the past but without success (in a single RF) No effect of bunch spacing (150 ns and 175 ns) on longitudinal bunch parameters

Measurements in 2015: longitudinal plane (short cycle) → Transmission and bunch length strongly depend on bunch intensity → Bunch length is reducing on the flat bottom T. Bohl

Effect of PS controlled emittance blow-up on bunch length/stability PS BUP → Very similar bunch lengths at extraction! instability T. Bohl

Slip stacking MDs: effect of phase loop T. Bohl, 2015 Intermediate flat portion could be better for beam stability

Slip stacking MDs Radial steering limits at flat top Limits (for mean closed orbit) measured on flat top - with extraction bumps: (-1 mm, +20 mm) -without extraction bumps: ±20 mm - ±6 mm (1.64x10 -3 ) assumed in simulations give slippage time of 300 ms (for distance of 2.7 us) at 300 GeV/c (γ=127) Beam survives w/o phase loop but with emittance BUP ~ 20% during 400 ms (1.3 ns => 1.45 ns) BUP due to slip stacking: => 0.36 eVs/u (simulations without intensity effects) → bunch rotation at extraction → 800 MHz during slip stacking?

Observations & damper performance in 2015 (G. Kotzian) Proton dampers successfully operated with ions!  operation problematic due to inherent FSK (Frequency Shift Keying) Beam position sampling: shifted “Sliding”  bunches assigned to wrong bucket Due to shifting a correct tagging not possible  the signal processing “sees” more than 2x12 bunches Feedback correction signal: shifts for subsequent injections Degraded injection damping for batches For most of the Ion run damper was deactivated after 11 th injection: damping only at flat bottom (no feedback during ramp) One horizontal damper used Feedback phase arbitrarily detuned by +20 deg  erratic beam losses during acceleration when using optimum feedback phase

SPS transmission H. Bartosik

Summary and outlook (H. Bartosik) Pb-Pb run 2015 showed clearly that SPS is a big bottleneck in ion injector chain Significant losses in SPS – up to 50% on average over all bunches injected Flat bottom losses significantly increase with intensity Losses during acceleration and transition are less dependent on intensity Transverse emittance growth up to 50% Systematic measurements performed in 2015 – data analysis still to be done! Systematic working point scan recording losses, bunch length and emittance on flat bottom Measurement of emittance evolution along flat bottom for nominal working point Measurements planned for 2016 If possible, optimize working point in order to minimize losses (based on 2015 data) Characterize the dependence of losses on intensity in dedicated measurements Comparison of losses between FFA and FHA for operational intensity (measurements of Thomas in the past with low intensity, but results are very promising) If time allows: comparison of Q20 and Q26 (in particular losses)

Ion studies made in 2015 (B. Goddard) MKP rise time Transverse damper commissioning and performance Systematic scans of working point with fixed frequency at FB IBS/emittance growth on FB Effect of RF noise on lifetime and beam at FB in fixed frequency mode Longitudinal stability versus longitudinal emittance and intensity Slip stacking: momentum aperture beam behavior without phase loop Detuning with amplitude for modeling of tails with injection errors and damping

Possible beam tests in 2016 (B.G. + E.S.) ns for p beam to keep gains made with Pb for proton-ion run? Investigate p+ 17 GeV/c PS->SPS transfer and transition crossing in SPS Low intensity 1e10, 2 bunches per injection at 100 ns spacing 2.Work out what prevents injecting later on FB, develop and test solutions 3.Analyse systematic WP scans and test better WP with nominal beam. Tests with fixed harmonic? 4.Deploy and test damper with proper compensation for bunch timing 5.Test of slip-stacking with RF frequency modulated at 0.5 F RF ? => LLRF work? 6.Q26 versus Q22 optics: beam tests if advantages seen in simulations 7.Optimisation of SPS cycle and filling scheme based on LHC performance 8.Investigate use of 800 MHz with 200 MHz for ions stability during cycle and slip stacking 9.Test controlled longitudinal emittance blow-up in the SPS (single and 2RF) 10.Bunch rotation on the flat top (after controlled BUP)

Priorities for 2016 studies Losses WP FF vs FH SC, Touschek/IBS Optimisation of LHC filling time and pattern Q20 vs Q26 Transverse damper for ions Longitudinal stability and use of 800 MHz Slip stacking measurements at 300 GeV/c => special new magnetic cycle? Preparation for p-Pb run

RF Modulation: FSK (Frequency Shift Keying) 07. Jan 2016 Ions Gerd Kotzian14 Proton Beam Beam Revolution Time (normalized) NB: NOT IN SCALE! Signal Processing Time (normalized) NB: FSK technique is a result of Fixed Frequency Acceleration (FFA) FSK in BA2 shifted w.r.t. BA3 by transport delay ~9.535 us (Fiber Link) Ions (BA3) Ions (BA2) SOLUTION: Additional delay by means of local fibers in BA2 (~10us)

Can losses be reduced? RF noise reduction on the SPS flat bottom Investigate if the IBS/Touschek are the main effects Q20 compared with Q26 Verify space charge limit for ions (scaled from protons) Space charge and working point optimisation at the long injection plateau to establish performance reach Slip-stacking: Determine max radial displacement on intermediate flat top Investigate emittance blow-up and losses Use existing LLRF for separate capture of 2 bunches (batches) Q20 or Q26? Tests with 200 MHz and 800 MHz RF systems (?) Bunch rotation on the flat top (with a phase jump?) Transverse damper for different bunch spacings (100 ns ns) Bunch after slip-stacking and rotation Q ns