October 30 th 2013. 10/28/2013 Requirements Specification 2 Client: Dr. Timoth Lederman Guest: Dr. Darren Lim Guest: Dr. Meg Fryling.

Slides:



Advertisements
Similar presentations
Hobb-IT Hobby Information Tracker By Illumination Technologies Software Plan September 23 rd 2013 Illumination Technologies 1.
Advertisements

Requirements Specification Presented By: Code Shark Solutions 11/3/10.
Title 1 Software Linked Interactive Competitive Environment Preliminary Design November 7 th, 2011.
Preliminary Design: Smart Scheduling Client: Dr. Robert Yoder.
April 29, Simnet View Acceptance Test by InnoSmart Technologies.
Seraphim.  Our Clients: ◦ Ms. J’aimé Pfeiffer (Capital Region BOCES) ◦ Ms. Jen Cannell (Questar III)  Guests ◦ Dr. Meg Fryling ◦ Dr. Darren Lim.
04/27/2010 Acceptance Test 1. Our Client… Dr. Timoth C. Lederman Professor of Computer Science Siena College And To All Other Guests 04/27/2010 Acceptance.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
10/28/2005 SaintSoft: Requirements Specifications 1 Environmental Monitoring System Requirements Specification by SaintSoft.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
9/25/2009 Software Plan. Our Client… Dr. Timoth C. Lederman Professor of Computer Science Siena College And To All Other Guests 9/25/2009 Software Plan.
1 Remote Monitoring System EIN Systems Environmental Intelligence Network Systems Remote Monitoring System - Requirements Specification - Welcome Mr. Ken.
October 26th, Simnet View Requirements Specification by InnoSmart Technologies.
Title 1 Software Linked Interactive Competitive Environment Software Requirements Specification November 2 nd, 2011.
IOS Requirements Specification Bad Robot Enterprises 1 BAD ROBOT ENTERPRISES INTERNATIONAL ONLINE SURVEY (IOS) REQUIREMENTS SPECIFICATION Roger Bacon Science.
IOS Preliminary Design Bad Robot Enterprises 1 BAD ROBOT ENTERPRISES INTERNATIONAL ONLINE SURVEY (IOS) PRELIMINARY DESIGN Roger Bacon Science Center, Room.
Requirements Specification MAJIK Software Solutions 1 Virtual Network Device Mapping System Requirements Specification By MAJIK Software Solutions October.
Title 1 Software Linked Interactive Competitive Environment Software Plan September 23 rd, 2011.
2/21/2006 SaintSoft: Detailed Design 1 Environmental Monitoring System Detailed Design by Saint Soft.
School of Science Network Device Display System Requirements Specification by Orion Technologies Roger Bacon Hall Room 328 October 24, :15 AM.
Alumni Spotlight Web Systems Requirements Specification by Initrode Solutions 10/25/2006.
IOS Detailed Design Bad Robot Enterprises 1 BAD ROBOT ENTERPRISES INTERNATIONAL ONLINE SURVEY (IOS) DETAILED DESIGN Roger Bacon Science Center, Room 328.
Requirements Specification: Smart Scheduling Client: Dr. Robert Yoder.
12/02/2005 SaintSoft: Preliminary Design 1 Environmental Monitoring System Preliminary Design by SaintSoft.
Welcome Ms. Jami Cotler & Dr. Scott Hunter NSG Software Development October 26, 2005 NSG Software Development October 26, Requirements Specifications.
11/4/2009 Requirements Specification. Our Client… Dr. Timoth C. Lederman Professor of Computer Science Siena College And To All Other Guests 11/4/2009.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Requirements Specification 11/2/2011 Presented By: ExoNET Solutions 1.
10/24/2007SKYNET Requirements Specification Dynamic Network Device Mapping System (DNDMS) Requirements Specification By SKYNET Software.
1 SWE Introduction to Software Engineering Lecture 11 - Requirements Engineering Processes.
Alumni Spotlight Web System Detailed Design by Initrode Solutions 03/06/2007.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Preliminary Design 12/7/2011 Presented By: ExoNET Solutions 1.
Detailed Design: Smart Scheduling Client: Dr. Robert Yoder.
Software Plan Presented By: Code Shark Solutions 9/24/10.
Monday, October 29 st 2012 Requirements Specification.
©Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 6 Slide 1 Chapter 6 Requirements Engineering Process.
1 Software Requirements Specification Presentation Client Dr. Darren Lim Friday October 30, 2009 Java.Online.Learning.Tutor.
S.W.I.F.T. Preliminary Design SMARK Solutions December 4, 2014 SMARKSOLUTIONS BE INTUITIVE.BE EFFICIENT.BE SMARK.
Seraphim.  Our Clients: ◦ Ms. J’aimé Pfeiffer ◦ Ms. Jen Cannell  Guests ◦ Dr. Meg Fryling ◦ Dr. Darren Lim.
GUEST REGISTRATION ADVANCEMENT BY SUNNY SOLUTIONS (G.R.A.S.S) Acceptance Test 05/01/ GUEST REGISTRATION ADVANCEMENT SUNNY SOLUTIONS ACCEPTANCE TEST.
Hobb-IT Hobby Information Tracker By Illumination Technologies Requirements Specification October 28 rd Illumination Technologies Hobb-IT.
CCRS Comprehensive Conference Registration System Detailed Design March 6 th,
Seraphim.  Our Clients: ◦ Ms. J’aimé Pfeiffer (Capital Region BOCES) ◦ Ms. Jen Cannell (Questar III)  Guests ◦ Dr. Meg Fryling ◦ Dr. Darren Lim.
CCRS Comprehensive Conference Registration System Acceptance Test May 1 st,
March 19 nd /19/2014 Detailed Design 2 Client: Dr. Timoth Lederman Guest: Dr. Darren Lim Guest: Dr. Meg Fryling.
Title 1 Software Linked Interactive Competitive Environment Detailed Design March 1 st, 2012.
ID-10t Consultants Generation Java Software Plan Roger Bacon Science Center, Room 328 September 19, :15 am 09/19/20081 ID-10t Consultants Software.
Advanced Software Engineering Association for Computing Machinery High School Competition System Prof: Masoud Sadjadi Fall 2004 First Deliverable By: Prasad.
Welcome Dr. Eric Breimer Associate Professor of Computer Science Siena College 515 Loudon Road Loudonville, NY /2/2009Digital Evolutions | Requirements.
GUEST REGISTRATION ADVANCEMENT BY SUNNY SOLUTIONS (G.R.A.S.S) Software Plan 9/21/2012 SUNNY SOLUTIONS SOFTWARE- PLAN PRESENTATION 1.
R.O.S.E.S. Preliminary Design Presented By: Code Shark Solutions 12/8/10.
EPICS Presentation Template. Note Slide (WILL NOT BE INCLUDED) Numbers in () mean slide length.
April 30 th 2014 oldGMCtrucks Mapper. 4/30/2014 Detailed Design 2 oldGMCtrucks Mapper Client: Dr. Timoth Lederman Guests & Class.
CCRS Comprehensive Conference Registration System Preliminary Design December 7 th,
FSH Technologies Acceptance Test: F.I.L.E.T. April 26th, 2012.
1. Agenda Introduction Problem Restate Project Progression Use Case Narratives UML Use Case Diagram Data Flow Diagrams Functional Requirements Prototype.
Seraphim.  Our Clients: ◦ Ms. J’aimé Pfeiffer (Capital Region BOCES) ◦ Ms. Jen Cannell (Questar III)  Guests ◦ Dr. Meg Fryling ◦ Dr. Darren Lim.
Hobb-IT Hobby Information Tracker By Illumination Technologies Detailed Design March 19, 2014 Illumination Technologies Hobb-IT 1.
 Client: Dr. Erik Eddy › CEO of TEAMS 101  Guest: Dr. Meg Fryling  Guest: Dr. Darren Lim.
Using the IAA Website Bill Greer Penn State University.
1 Acceptance Test Presentation Client Dr. Darren Lim 4/27/2010.
Seraphim.  Our Clients: ◦ Ms. J’aimé Pfeiffer (Capital Region BOCES) ◦ Ms. Jen Cannell (Questar III)  Guests ◦ Dr. Meg Fryling ◦ Dr. Darren Lim.
Software Plan By Phoenix Tech. Dr. Darren Lim Assistant Professor Department of Computer Science Siena College Mrs. Pauline White Visiting Instructor.
GUEST REGISTRATION ADVANCEMENT BY SUNNY SOLUTIONS (G.R.A.S.S) Requirements Specification 10/29/2012 SUNNY SOLUTIONS REQUIREMENTS SPECIFICATION PRESENTATION.
MARITIME AFFAIRS Slide DG Maritime Affairs and Fisheries Maritime Forum E-learning module.
 Capstone Project : Team #6  October 4 th,2007.
SCIPAnet Software Requirements Specification Requested By: Tim Lederman Team Members: Daniel Hopkins Heather Addison Matthew Begley Scott Dakers Victoria.
DETAILED DESIGN EFFICIENT AND SIMPLE Maroon Solutions 1.
CCRS Comprehensive Conference Registration System Requirements Specification October 29 th, 2012 S.E.E. Solutions 1.
Requirements Specification
Preliminary Design Presentation
Presentation transcript:

October 30 th 2013

10/28/2013 Requirements Specification 2 Client: Dr. Timoth Lederman Guest: Dr. Darren Lim Guest: Dr. Meg Fryling

10/28/2013 Requirements Specification 3 Introduction Problem Definition Current Status Prototypes used for discovery What is next for our project Questions Data Flow Diagrams Functional Requirements / Use Case Narratives UML Use Case Diagram

10/28/2013 Requirements Specification 4 Zachary Witter Team Leader Dustin Clark Webmaster Devin Hurley Lead Developer Chan Tran Data Scientist Josh Tomaszewski Database Administrator

10/28/2013 Requirements Specification 5 Introduction Problem Definition Current Status Prototypes used for discovery What is next for our project Questions Data Flow Diagrams Functional Requirements / Use Case Narratives UML Use Case Diagram

10/28/2013 Requirements Specification 6 Difficult to find other forum members Current system is time consuming Forum members can not add their own data Intuitive implementation needed

10/28/2013 Requirements Specification 7 Introduction Problem Definition Current Status Prototypes used for discovery What is next for our project Questions Data Flow Diagrams Functional Requirements / Use Case Narratives UML Use Case Diagram

10/28/2013 Requirements Specification 8

10/28/2013 Requirements Specification 9 Introduction Problem Definition Current Status Prototypes used for discovery What is next for our project Questions Data Flow Diagrams Functional Requirements / Use Case Narratives UML Use Case Diagram

10/28/2013 Requirements Specification 10 General Requirements – Map with pins – Slide out panel with tabs Functional Requirements and Narratives for oldGMCtrucks Mapper’s four users

10/28/2013 Requirements Specification 11 Random User Narrative Functional requirements – Will see blank map – Will have the ability to sign up for an account on oldGMCtrucks forum.

10/28/2013 Requirements Specification 12 Narrative Functional requirements – Access the site through the oldGMCtrucks forum. – View a map with user information on the map. – Request an account on the oldGMCtrucks Mapper site.

10/28/2013 Requirements Specification 13 Narrative Functional requirements – Ability to log in. – Ability to update information in their profile. – Can derive directions to an event or to another member’s location. – Can create/edit events

10/28/2013 Requirements Specification 14 Narrative Functional requirements – Extends oldGMCtrucks Mapper Member. – Can modify any member’s data. – Can create user accounts.

10/28/2013 Requirements Specification 15 Introduction Problem Definition Current Status Prototypes used for discovery What is next for our project Questions Data Flow Diagrams Functional Requirements / Use Case Narratives UML Use Case Diagram

10/28/2013 Requirements Specification 16 Actor

10/28/2013 Requirements Specification 17

10/28/2013 Requirements Specification 18 Introduction Problem Definition Current Status Prototypes used for discovery What is next for our project Questions Data Flow Diagrams Functional Requirements / Use Case Narratives UML Use Case Diagram

10/28/2013 Requirements Specification 19

10/28/2013 Requirements Specification 20

10/28/2013 Requirements Specification 21

10/28/2013 Requirements Specification 22

10/28/2013 Requirements Specification 23 Introduction Problem Definition Current Status Prototypes used for discovery What is next for our project Questions Data Flow Diagrams Functional Requirements / Use Case Narratives UML Use Case Diagram

10/28/2013 Requirements Specification 24

10/28/2013 Requirements Specification 25 Introduction Problem Definition Current Status Prototypes used for discovery What is next for our project Questions Data Flow Diagrams Functional Requirements / Use Case Narratives UML Use Case Diagram

10/28/2013 Requirements Specification 26 oldGMCtrucks Mapper

10/28/2013 Requirements Specification 27 Dr. Timoth Lederman Dr. Darren Lim Dr. Meg Fryling Software Engineering Class