APEX RUN-11 APEX Schedule May 11, 2011 Injection 12am8am BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … Spin Flipper Bai, Pablo, Oddo, Craig, Kevin IPM calibration.

Slides:



Advertisements
Similar presentations
RHIC Experience: Optics Measurements, Corrections, and Modeling M. Bai C-A Dept., BNL.
Advertisements

RHIC Optics Correction M. Bai C-A Dept., BNL Mini-workshop on ICA in Beam Measurement and Generic algorithm in Nonlinear beam dynamics, Bloomington, Indiana,
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
The RHIC Collider Fulvia Pilat Collider Workshop, JLAB, February 24, 2009.
Nov. 17, 2005Fermi Lab AP Seminar AC Dipole Based Diagnostics Mei Bai, C-A Department.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
Alignment and Beam Stability
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
J. Pfingstner Jitter studies February 12, 2014 Optics corrections in the ATF damping ring Jürgen Pfingstner, Yves Renier.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
APEX Report March 3, 2010 Fulvia Pilat Time Meeting, March 9, 2010.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Frequency Map Analysis Workshop 4/2/2004 Peter Kuske Refinements of the non-linear lattice model for the BESSY storage ring P. Kuske Linear Lattice My.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Simulation of Spin Interference and Echo Effect Abstract Successively jumping across a depolarization resonance twice produces interesting spin dynamics.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
Advanced Optics Control, CERN, Masamitsu Aiba, PSI Recent optics measurements at SLS M. Aiba, M. Böge, Á. Saá Hernández, D. Mayilyan and.
Orbits, Optics and Beam Dynamics in PEP-II Yunhai Cai Beam Physics Department SLAC March 6, 2007 ILC damping ring meeting at Frascati, Italy.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
First Demonstration of Optics Measurement and Correction during Acceleration Chuyu Liu Collider Accelerator Department, BNL.
APEX Schedule April :30am12:30pm5pm IBS suppression lattice Litvinenko, Tepikian +team Back 2 Phys 4pm Nonlinear Chromaticity (Response.
Beta* leverage during RHIC AuAu Run14 G. Robert-Demolaize, M. Bai, C. Harper, A. Marusic, X. Shen, S. White Work supported, in parts, by the European Commission.
APEX RUN-12 APEX Schedule Feb 22, 2012 Injection 8am 11pm IP transfer matrix Tepikian, Ptitsyn If needed: Beam Scrubbing Blaskiewicz, Montag, Huang Injection.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
Corrections for multi-pass eRHIC lattice with large chromaticity Chuyu Liu ERL workshop 2015 June 7, 2015.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
RHIC Optics Status: Optics Measurements and Corrections M. Bai C-A Dept., BNL On behalf of RHIC Team.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
Operation Notes APEX Status Fulvia Pilat Machine Experiments Meeting January 20, 2009.
APEX RUN-11 APEX Schedule Planned Feb. 23, pm ~ 3 ramps 8am 12x12 store Physics store Beta* unsqueeze +s* adjustment GRD+team 6x6 store AC dipole.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
Operational experience of the AGS eIPMs
Orbit Response Matrix Analysis
Sextupole calibrations via measurements of off-energy orbit response matrix and high order dispersion Nicola Carmignani.
Summary of experience with IPM measurements at BNL-RHIC
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Coupling Correction at the Australian Synchrotron
Linear and Nonlinear Lattice Correction Via Betatron Phase
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Status and Plan for the PEP-II Lattices
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
Planning at 5 o’clock meeting Friday
450 GeV Preliminary Commissioning: Measurement Programme
Another Immortal Fill….
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

APEX RUN-11 APEX Schedule May 11, 2011 Injection 12am8am BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … Spin Flipper Bai, Pablo, Oddo, Craig, Kevin IPM calibration R. Connolly, Minty, Marusic 1am2am IPM calibration R. Connolly, Minty, Marusic Injection 6am IP Transfer Matrix Tepikian, Ptitsyn On/Off momentum beta beat, and beta* measurement Calaga, White, Luo, Bai 5am ORM for GOFB Minty, Liu, Rob, Rob, Kevin, … Store

APEX RUN-11 IPM Channel2Channel Calibration PI: R. Connolly, M. Minty, S. Tepikian Confirmed that the emittance dependence on beam position at IPM, i.e. separation bumps at IP2 was due to the gain depletion of the MCPs at the center of the measurement aperture

APEX RUN-11 IPM Channel2Channel Calibration Uncorrected data and indicates a vertical beam size increase of 16% or emittance increase of 35% when bump is removed Same data with gain and offset corrections. Now the size change is 5%, about the scatter in shot-shot measurements

APEX RUN-11 Blue Spin Flipper Commissioning: M. Bai, P. Oddo, C. Dawson, T. Roser, P. Pile, … 1 st ac dipole bump 2 nd ac dipole bump both ac dipole bumps

APEX RUN-11 Blue Spin Flipper Commissioning: M. Bai, P. Oddo, C. Dawson, T. Roser, P. Pile, … #5 #1 #2#4 Each individual ac dipole DSA response Conclusion: H DSA response is due to the difference of roll of each ac dipole took both 1024 turn by turn bpm data and million turn bpm data for all cases. Offline analysis to extract the roll of each ac dipole

APEX RUN-11 BBA Reproducibility: M. Minty, J. Ziegler,… May 2, In Yellow ring with 9GeV Au beam May 11, In Blue ring with 100 GeV Au beam Checked stability of quadrupole power supply Yi6-qf3-ps is stable from tune data Checked stability of corrector power supplies Yo5-tv3, yi6-tv2 and yi6-tv4 current reproducibility reaches the power supply regulation specs, i.e. +-50A/2^12= 24 mA reproducibility of bump settings are limited by corrector power supply controller resolution

APEX RUN-11 BBA Reproducibility

APEX RUN-11 Measure Twiss and Coupling PI: S. Tepikian, V. Ptitsyn

APEX RUN-11 Measure Twiss and Coupling Yellow Ring IP6 Varied Q1, Q2 and QS Beta*: 0.875m Horizontal, 0.878m vertical Yellow Ring IP8 Varied Q1, Q2 and QS Beta*: 0.923m Horizontal, 0.919m Vertical Plan Need to compare this with the analysis of coupling-free to demonstrate the effect of coupling on beta* measurement Repeat yellow measurement with better vertical tune measurements Measure blue ring IPs

APEX RUN-11 Effect of Measured ORM for GOFB PI: Chuyu Liu, M. Minty, Rob M, Rob H

APEX RUN-11 Effect of Measured ORM for GOFB With model matrix With measured matrix Time domain Frequency domain

APEX RUN-11 Off Momentum Beta Beat PI: R. Calaga, Y. Luo, S. White, M. Bai ~40% chromatic beta beat was observed during 250 GeV pp run in 2009 Two correction techniques: adjust phase advance between IP6 and IP8: R. Calaga correct non-linear chromaticity: Y. Luo Measured on-momentum optics ~ 20% beta beat(peak) in both rings Blue beta* Yellow: first attempt of radial steering killed beam orbit xmean wasn’t properly zeroed before activating radial steering

APEX RUN-11 Off Momentum Beta Beat

APEX RUN-11 APEX Schedule May 25, 2011 Injection 8am 11pm BBA Minty, Jordan, Liu, Rob, Rob Beam-beam Space charge Alexei 10am2pm Local decoupling Zimmer, Vadim Bai Injection IP Transfer Matrix Tepikian, Ptitsyn Off momentum beta beat measurement/correction Calaga, White, Luo, Bai 6pm 10 Hz GOFB for Ramp Minty, Liu, Rob, Rob, GRD Store 12pm Ramp Dynamic beta* knob GRD, Al 5pm Local decopling Zimmer, Vadim, Bai 8pm Back2Physics 12am Q1 modulation for beta* Yun, Al