PDCWG Report to ROS October 16, 2008 Bob Green PDCWG Chair Garland Power & Light.

Slides:



Advertisements
Similar presentations
PJM© PJM DOCs # Frequency Response Drafting Team Frequency Response Background Frequency Response Standard History Briefing on Frequency Response.
Advertisements

WECC Reliability Based Control Field Trial
BAL-002-WECC-1 Contingency Reserves
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Impact of Variability on Control Performance Metrics James D. McCalley Harpole Professor of Electrical & Computer Engineering Iowa State University 1.
Don Blackburn Vice Chair
SAR-003-TRE-001 FERC-Ordered Modification to ERCOT waiver CPS2 Prepared By Ananth Palani, EnergyCo.
ERCOT Under Frequency Load Shed Testing
Bob Green Garland Power and Light
The Months and The Seasons Prepared by Claudia Doria and Terra Myers.
2012 CALENDAR. JANUARY 2012 Sunday 日 Monday 月 Tuesday 火 Wednesday 水 Thursday 木 Friday 金 Saturday 土
Generator Governor Frequency Response Alert
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
Frequency Control Turbine Governor Droop NERC Requirement
 FACTS :  Departure time : Tuesday 30th September, 2014 at 8.30 pm  Length of flight : 6 hours, 56 minutes  Seoul is 2 hours ahead of Surabaya  ARRIVAL.
MY fLIGHT pLAN By Josephine. DeStInAtIoNDuRaTiOnTiMe ZoNe Surabaya  Singapore2 hours 13 minutesSingapore is 1 hour ahead of Surabaya Singapore  Suva11.
1 Texas Regional Entity Report December Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
ROS June 12, 2008 Meeting ROS Report for June 26, 2008 TAC Meeting Randy Jones ROS Vice Chair.
RTWG Report to TAC August 5, 2010 Howard Daniels.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
Comparison of Governor Deadband & Droop Settings of a Single 600 MW Unit A Hz Deadband with a Straight Line Proportional 5% Droop Curve Compared.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
1 Texas Regional Entity Compliance Update July 2007.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Texas Regional Entity Compliance Report Board of Directors February 16, 2009.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, ROS Action Plan Item 1e.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Free Phone $25 a month 100 minutes then 35c per min Free Phone $25 a month 100 minutes then 35c per min Free Phone $20 a month 75 minutes then 25c per.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
PDCWG Report to ROS January 14, 2010 Sydney Niemeyer.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
Texas Regional Entity Report Mark Henry June 6, 2008.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
PDCWG 8/25/2015 GTBD Bias Analysis ERCOT Market Analysis and Design PDCWG August 25, 2015.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Economic Analysis Proposed Scope ERCOT RPG Meeting September 17, 2010.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
Improving Primary Frequency Response Bob Green PDCWG August 3, 2011.
QSE Managers Working Group November 7 th 2011 NPRR 334 – Additional Analysis.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Generation: Control & Economic Dispatch 2016 System Operator Seminar.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
1 Frequency Control Task Force Report to WMS July 19 th, 2006.
BAL-001-TRE-1 CPS2 Waiver FERC-Ordered Modification to ERCOT waiver CPS2 Report to RSC December 16, 2008.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Market Operations Standing Committee of the IMO Market Operations Standing Committee July 23, 2003.
Page 1 of 21 Texas Regional Entity ROS Presentation June 11, 2009 T EXAS RE ROS P RESENTATION J UNE 2009.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
Compliance Report to ERCOT BOD December 2006
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Standards Review Subcommittee Update
Presentation transcript:

PDCWG Report to ROS October 16, 2008 Bob Green PDCWG Chair Garland Power & Light

NERC CPS1 for September 2008 = NERC Twelve Month rolling Average CPS1 =

119.25

133.03

ERCOT’s Performance to the Proposed New Balancing Authority ACE Limit Standard Based on 1 minute averages of frequency For ERCOT: FreqTrigLow= Hz FreqTrigHigh=60.068Hz first minute: Event 5 minutes in a row: Alarm 30 min in a row: Violation Hurricane Ike made landfall at 02:10 am Saturday, Sept. 13 th.

Tuesday, Sept 16th Sunday, Sept 14 th

Governor dead bands can create resource MW output oscillations

Comments The PDCWG met on October 14 and 15. The PDCWG has been working with the TRE to develop SAR-003, the CPS2 Waiver (BAL-001 Regional Variance). The PDCWG completed analysis of Wind Generator inertia and governor response. The PDCWG continues to discuss Nodal market expected control performance. The next meeting is November 11 and 12.