T o t a l s u b s e a s o l u t i o n s AB-X-PR-00265 Subsea 7 Inc. Results for First Quarter 2006 25 April 2006 1.

Slides:



Advertisements
Similar presentations
The LGL Group, Inc. (AMEX: LGL) Q Earnings Report August 4, :30 a.m. Eastern.
Advertisements

July 18, 2008, Atlas Copco Group Q2 Results July 18, 2008.
Results Q2/ Q2: STRONG GROWTH AND MARGIN IMPROVEMENT CONTINUES 3 August, 2006 Pekka Lundmark, President & CEO.
February 4, 2008, Atlas Copco Group Q4 Results February 4, 2008.
February 1, Atlas Copco Group Q4 Results February 1, 2007.
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
ASM & COAA Adding Value to Alberta Energy Sector projects.
IPAA 2004 Oil & Gas Investment Symposium April 19, 2004 Robert L. Parker Jr.James W. Whalen President and CEO Senior Vice President - CFO.
AGM Finance Update Derrick Sturge, Vice-President, Finance & CFO June 4, 2014.
Field Location The Kristin Field, discovered in 1997, is situated 20 km south west of Åsgard (Smørbukk) and stretches into PL 134B and PL 199. The Kristin.
April 27, Atlas Copco Group Q1 Results April 27, 2006.
Rev 1.
Helix Energy Solutions Group, Inc. (HLX) NYSE Recommendation: BUY Price (10/3/14): $21.55.
Projects is one of the sectors of the engineering department that is paid a great attention because it supports all other departments to achieve its requirements.
SHORT - TERM NATURAL GAS OUTLOOK National Association of State Energy Officials State Heating Oil and Propane Conference August 7, 2006 Barbara Mariner-Volpe,
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
1) The history of Technip 2) Range of services
Results of «Ak Bars» Bank Group in according with IFRS FY’2012.
05 March 2009 PAGE 1 A.P. Møller - Mærsk A/S Annual Report March 2009 Conference call 1.30 pm CET Webcast available at PAGE 1.
Deepwater Development - An Industry Perspective
Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.
Second quarter report 2014 August 14, 2014
Subsea Light Well Intervention
Third Quarter 2012 Earnings Conference Call October 25, 2012.
March 9 th, 2010 Money Marine Conference Mustapha Boussaid Director - Maritime Investments 7 th Annual Gulf Ship Finance Forum Dubai, UAE 1.
October 24, Atlas Copco Group Q3 Results October 24, 2006.
DSND Inc. PRESENTATION 1 Quarter May 2003.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
New Challenges in Deepwater Ultra-deep water and remote locations Harsh environments Small and/or sub-economic accumulations Viscous oil, low energy drive.
October 21, 2005www.atlascopco.com1 Atlas Copco Group Q3 Results October 21, 2005.
Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.
TMR4225 MARINE OPERATIONS SPRING 2007 Introduction.
North America Polyurethane (PU) Market Phone No.: +1 (214) id:
Atlas Copco Group Q1 Results April 29, Page 2 April 29, 2002www.atlascopco-group.com Contents  Q1 Highlights and Strategic Moves  Market Development.
Atlas Copco Group Q2 Results July 17, Contents  Q2 Business Highlights  Market Development  Business Areas  Financials  Outlook.
Group Handout Atlas Copco Group – September 30 th 2000 The face of interaction.
Giulio Mazzalupi Atlas Copco Group - Q4 Results Stockholm, February 12, 2001.
Atlas Copco Group Q1 Results April 28, Contents  Q1 Business Highlights  Market Development  Business Areas  Financials  Outlook.
Index Group Handout Atlas Copco Group – June 30 th 2000 The face of interaction.
BB&T Capital Markets 10 th Annual Commercial & Industrial Investor Conference March 23, 2016.
Investor Presentation Oslo / London February
YOUR RELIABLE PARTNER BINTANG SUBSEA.
Offshore Research AS 1 Offshore Markets Offshore Research AS 2 Business concept Data from several reliable sources are processed, interpreted.
1 ICON plc Bank of America May, Certain statements contained herein including, without limitation, statements containing the words “believes,”
Presentation Pareto seminar. Status Petrolia Drilling.
Pareto Oil & Offshore Conference 29. September 2007.
Fred. Olsen Energy ASA 3Q 2005 presentation 26 October 2005.
Petrolia Drilling ASA 4th quarter Key events  SS Petrolia - Good performance through 4th. quarter and into 1st. Quarter 2007.Contract coverage.
PETROLIA DRILLING 1ST QUARTER PETROLIA – COMPANY STRUCTURE Petrolia Drilling ASA Venture Drilling AS PetroMena ASA PetroJack ASA PetroProd Ltd Petrolia.
World Offshore Maintenance, Modifications & Operations Market Forecast World Offshore Maintenance, Modifications & Operations Market Forecast.
1MEDSERV Operations Ltd Medserv p.l.c. 15 April 2010.
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
Stifel Nicolaus 2017 Industrials Conference June 15, 2017.
Quarter Two 2016 July 28, 2016.
First Quarter Fiscal Year 2009 Financial Results December 19, 2008
Global Geo Services ASA
Atlas Copco Group Q1 Results April 27, 2004 April 27, 2004.
Q2 Results Stockholm, July 19, 2001
Every Challenge is an Opportunity
Q Earnings Call.
By George Shard & Ray Pickens
Subsea Systems Market report categorizes the global market by Subsea Processing, Subsea Production & Geography.
Pump Jack Market research report categorizes by Well Type (Vertical and Horizontal), Application (Onshore and Offshore), Weight,
Q4 and fiscal 2017 results March 15, 2018.
Teleconference - 12 November 2008
Michael Cowie, Technical Director
Merrill Lynch Global E&C/ Infrastructure Conference
Riser and Flowline Hose Systems Design to Installation
© 2016 Global Market Insights. All Rights Reserved Subsea equipment Market trends research and projections for 2019 – 2025.
© 2018 Global Market Insights, Inc. USA. All Rights Reserved Subsea Umbilicals, Risers and Flowlines Market Growth | Trends Analysis.
Presentation transcript:

t o t a l s u b s e a s o l u t i o n s AB-X-PR Subsea 7 Inc. Results for First Quarter April

t o t a l s u b s e a s o l u t i o n s AB-X-PR Highlights Q Successful completion of Woodside Chinguetti project in West Africa and BP Thunderhorse in Gulf of Mexico Order for new flexlay/J-lay and construction vessel placed Activity levels high in all regions Tendering activity strong Satisfactory financial result for Q

t o t a l s u b s e a s o l u t i o n s AB-X-PR BP Thunderhorse (Fabrication & Installation) Workscope 50km of umbilicals Fabrication & installation of 30 rigid jumpers 9 intermediate SLEDs 50 steel flying leads 69 electrical flying leads 320 concrete mattresses Highlights Successfully met the expectations of BP on one of its key worldwide projects All hardware installed successfully, safely and on time 30 month project duration (completed March 2006) 17 month offshore duration (480 vessel days) 1.3 million man hours The Thunderhorse field is located in 2,200m of water, offshore Louisiana, USA. Subsea 7 was contacted by BP in 2003 to install umbilicals, jumpers and flying leads on its deepest development to date. 3

t o t a l s u b s e a s o l u t i o n s AB-X-PR The Chinguetti field is located in 800 metres of water, offshore Mauritania. Subsea 7 was contracted in July 2004 for the design, supply and installation of flexible flowlines, risers and umbilicals. Chinguetti Project (Design, Procure & Install) Workscope 45km of flexible flowlines 28km of umbilicals 6 risers Delivered on 33 reels 3 manifolds (70t each) 1overtrawlable structure 40km of flexible/umbilicals trenched Highlights Project completed on schedule to meet client’s planned 1 st oil Feb month duration 5 month offshore 800,000 man hours 4

t o t a l s u b s e a s o l u t i o n s AB-X-PR New Flexlay and J-lay Vessel Length overall153.24m Breadth28.4m Depth to main deck12.5m Draught design7.5m Service speed13 knots Accommodation120 persons Construction Capabilities Water depth:Down to maximum 3000m Flexible pipe:Vertical lay system up to 24” diameter and 400t top tension Under deck storage:2 x 1250t carousels Deck storage:3000t carousel or 8-10 reels (not simultaneous) Rigid pipe:J-lay system up to 15° off vertical; double joints; twin work stations; 400t top tension Riser systems:J-lay system with up to 700t lift capability for riser tower deployment ROVs:Twin work class 3000m ROV built in Main crane:400t heave compensated offshore mast crane (400t harbour/350t offshore) PLETs:60t handling system Principal Particulars 5

t o t a l s u b s e a s o l u t i o n s AB-X-PR Breakdown of Backlog Q1 2005, Q & Q Note : Backlog excludes letters of intent totalling $200m as at 31 December 2005 and $150m as at 31 March

t o t a l s u b s e a s o l u t i o n s AB-X-PR Market Outlook Forecast for 2007/2008 indicates growth on 2006 Activity levels strong in all regions Bid levels high:- Subsea 7 live tenders awaiting outcome circa USD 1.7 billion - anticipated tenders in next 3/5 months >USD 5 billion ROV utilisation in drill rig support sector growing 7

t o t a l s u b s e a s o l u t i o n s AB-X-PR Income Statement – Subsea 7 Inc. Accounts prepared in accordance with IFRS 8

t o t a l s u b s e a s o l u t i o n s AB-X-PR Balance Sheet – Subsea 7 Inc. Accounts Prepared in Accordance with IFRS 9

t o t a l s u b s e a s o l u t i o n s AB-X-PR Net Interest Bearing Debt - Subsea 7 Inc. Accounts prepared in accordance with IFRS 10