McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.

Slides:



Advertisements
Similar presentations
Agenda of Week IX. Capacity and Process Capacity planning Midterm exam Capacity planning Review of week 8 12 Approaches Purposes : Finishing the capacity.
Advertisements

Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Chapter 6 Process Selection and Facility Layout.
Process Selection and Facility Layout
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 6 Process Selection and Facility Layout.
Operations Management
Lesson 09 Facilities Layout
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Facility Decisions: Layouts © The McGraw-Hill Companies, Inc., 2003.
Process Selection and Facility Layout
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Process Selection and Facility Layout
Beni Asllani University of Tennessee at Chattanooga
Facility Layout 1. General Observations Facility Planning includes planning for: (1) the number of facilities and general facility type, (2) facility.
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
Process Selection and Facility Layout
Process Selection and Facility Layout
Process Selection and Facility Layout
Session Pooja patnaik.
Process Selection and Facility Layout
Process Selection and Facility Layout
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Selection and Facility Layout
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 6 Process Selection and Facility Layout.
Facility layout.
Chapter 10 – Facility Layout
Process (Job Shop) Layouts
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection Facilities Layout Line Balancing.
Facility Layout Technical Note 6.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 5 Facilities To Accompany.
MGT Operations Management
McGraw-Hill/Irwin.
6-1Process Selection and Facility Layout William J. Stevenson Operations Management 8 th edition.
Process Selection and Facility Layout
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 6 Process Selection and Facility Layout.
Process Layout Chapter 7 July 20, 2005.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Process Selection and Facility Layout
Process Selection and Facility Layout. Process selection – Deciding on the way production of goods or services will be organized Major implications –
Slide 0 of 96 Manufacturing Facility Layout. Slide 1 of 96 Basic Layout Forms Process Product Cellular Fixed position Hybrid.
Chapter 6 Facilities Layout.
Chap 4 - Facility Layout: Manufacturing and Services.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Selection and Facility Layout Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 6 Process Selection and Facility Layout.
6 Process Selection and Facility Layout. 6-2 Learning Objectives  Explain the strategic importance of process selection.  Describe the basic processing.
Facility Layout Objectives of Facility Layout Basic Types
Basic Layout Types Product layouts Process layouts
Part 3.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Design and Facility Layout
Cellular Layouts Cellular Production Group Technology
Chapter 6 Process Selection and Facility Layout
Process Selection and Facility Layout
Process Selection and Facility Layout
FACILITY LAYOUT Facility layout means:
Process Selection and Facility Layout. Process selection – Deciding on the way production of goods or services will be organized Major implications –
Process Selection and Facility Layout
Facility Layout Configuration of departments, work centres and equipment, with particular emphasis on movement of work through the system Why Important?
Facilities Planning and Design Course code:
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Operations Management
Process Selection and Facility Layout
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout

6-2  Layout: the configuration of departments, work centers, and equipment, with particular emphasis on movement of work (customers or materials) through the system  Product layouts  Process layouts  Fixed-Position layout  Combination layouts Facilities Layout

6-3  Requires substantial investments of money and effort  Involves long-term commitments  Has significant impact on cost and efficiency of short-term operations Importance of Layout Decisions

6-4 Inefficient operations For Example: High Cost Bottlenecks Changes in the design of products or services The introduction of new products or services Accidents Safety hazards The Need for Layout Decisions

6-5 Changes in environmental or other legal requirements Changes in volume of output or mix of products Changes in methods and equipment Morale problems The Need for Layout Design (Cont’d)

6-6  Product layouts  Process layouts  Fixed-Position layout  Combination layouts Basic Layout Types

6-7  Product layout  Layout that uses standardized processing operations to achieve smooth, rapid, high- volume flow  Process layout  Layout that can handle varied processing requirements  Fixed Position layout  Layout in which the product or project remains stationary, and workers, materials, and equipment are moved as needed Basic Layout Types

6-8 Raw materials or customer Finished item Station 2 Station 2 Station 3 Station 3 Station 4 Station 4 Material and/or labor Station 1 Material and/or labor Material and/or labor Material and/or labor Used for Repetitive or Continuous Processing Figure 6.4 Product Layout

6-9  High rate of output  Low unit cost  Labor specialization  Low material handling cost  High utilization of labor and equipment  Established routing and scheduling  Routing accounting and purchasing Advantages of Product Layout

6-10  Creates dull, repetitive jobs  Poorly skilled workers may not maintain equipment or quality of output  Fairly inflexible to changes in volume  Highly susceptible to shutdowns  Needs preventive maintenance  Individual incentive plans are impractical Disadvantages of Product Layout

In Out Workers Figure 6.6 A U-Shaped Production Line

6-12 Dept. A Dept. BDept. D Dept. C Dept. F Dept. E Used for Intermittent processing Job Shop or Batch Processes Process Layout (functional) Figure 6.7 Process Layout

6-13 Work Station 1 Work Station 2 Work Station 3 Figure 6.7 (cont’d) Product Layout (sequential) Used for Repetitive Processing Repetitive or Continuous Processes Product Layout

6-14  Can handle a variety of processing requirements  Not particularly vulnerable to equipment failures  Equipment used is less costly  Possible to use individual incentive plans Advantages of Process Layouts

6-15  In-process inventory costs can be high  Challenging routing and scheduling  Equipment utilization rates are low  Material handling slow and inefficient  Complexities often reduce span of supervision  Special attention for each product or customer  Accounting and purchasing are more involved Disadvantages of Process Layouts

6-16 Fixed Position Layouts  Fixed Position Layout: Layout in which the product or project remains stationary, and workers, materials, and equipment are moved as needed.  Nature of the product dictates this type of layout  Weight  Size  Bulk  Large construction projects

6-17  Cellular Production  Layout in which machines are grouped into a cell that can process items that have similar processing requirements  Group Technology  The grouping into part families of items with similar design or manufacturing characteristics Cellular Layouts

6-18 DimensionFunctionalCellular Number of moves between departments manyfew Travel distanceslongershorter Travel pathsvariablefixed Job waiting timesgreatershorter Throughput timehigherlower Amount of work in process higherlower Supervision difficultyhigherlower Scheduling complexityhigherlower Equipment utilizationlowerhigher Table 6.3 Functional vs. Cellular Layouts

6-19  Warehouse and storage layouts  Retail layouts  Office layouts  Service layouts must be aesthetically pleasing as well as functional Service Layouts

6-20 Line Balancing is the process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements. Design Product Layouts: Line Balancing

6-21 Cycle time is the maximum time allowed at each workstation to complete its set of tasks on a unit. Cycle Time

6-22 Determine Maximum Output

6-23 Determine the Minimum Number of Workstations Required

6-24 Precedence diagram: Tool used in line balancing to display elemental tasks and sequence requirements A Simple Precedence Diagram a b cd e 0.1 min. 0.7 min. 1.0 min. 0.5 min.0.2 min. Figure 6.11 Precedence Diagram

6-25  Arrange tasks shown in Figure 6.10 into three workstations.  Use a cycle time of 1.0 minute  Assign tasks in order of the most number of followers Example 1: Assembly Line Balancing

6-26 Workstation Time RemainingEligible Assign Task Revised Time Remaining Station Idle Time a, c c none ac-ac bb de-de- de-de Example 1 Solution

6-27 Efficiency = 1 – Percent idle time Calculate Percent Idle Time

6-28  Assign tasks in order of most following tasks.  Count the number of tasks that follow  Assign tasks in order of greatest positional weight.  Positional weight is the sum of each task’s time and the times of all following tasks. Some Heuristic (intuitive) Rules: Line Balancing Rules

6-29 cd abe fgh Example 2

6-30 Station 1Station 2Station 3Station 4 ab e f d g h c Solution to Example 2

min.2 min.1 min. 30/hr. Bottleneck Bottleneck Workstation

6-32 Parallel Workstations 1 min. 2 min. 1 min. 60/hr. 30/hr. 60/hr. 2 min. 30/hr. Parallel Workstations

6-33 Information Requirements: 1.List of departments 2.Projection of work flows 3.Distance between locations 4.Amount of money to be invested 5.List of special considerations 6.Location of key utilities Designing Process Layouts

ABC Figure 6.13 Example 3: Interdepartmental Work Flows for Assigned Departments

6-35  PowerPoint Author’s note:  The following three slides are not in the 9e text, but I like to use them for alternate examples.

6-36 Process Layout - work travels to dedicated process centers Milling Assembly & Test Grinding Drilling Plating Process Layout

6-37 Gear cutting Mill Drill Lathes Grind Heat treat Assembly Functional Layout

Assembly Lathe Mill Drill Heat treat Heat treat Heat treat Gear cut Gear cut Grind Cellular Manufacturing Layout