Technology R&D Activities for the ITER full-Tungsten Divertor

Slides:



Advertisements
Similar presentations
1E. TsitronePWI TF meeting 13-15/11/2006 Euratom ITER divertor status Annual ITER divertor meeting (4-6 october 2006, St Petersbourg) Memorandum of undestanding.
Advertisements

EU-PWI Taskforce EU PWI TF Meeting Nov. 4 – 6, 2009, Warsaw Report on the F4E W Task Force toAssess the Option to Start Operation in ITER with a full W.
J. Roth Bilateral Agreements EU-DOE: e.g.: PISCES operation (following talk by Russ Doerner) Bilateral Agreement EU-Russia: collaboration on Material damage.
Fusion Power Associates Meeting, 5 December 2012 Slide 1/16 ITER Achieve 500 MW of fusion power. Demonstrate the scientific and technological feasibility.
Heat treatment 1. Introduction
© Olga Ogorodnikova, 2008, Salamanka, Spain Current status of assessment of Tritium inventory in all-W device O.V. Ogorodnikova and E. d’Agata.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
ASIPP EAST Tungsten-copper Divertor Development For EAST Present by D. -M. Yao EAST-Divertor Group, ASIPP-Hefei, China 25 th Symposium on Fusion Engineering.
ASIPP Zhongwei Wang for CFETR Design Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 26-28, 2013 at Kyoto University.
ASIPP HT-7 & EAST 17 th International Conference on Plasma Surface Interactions in Controlled Fusion Devices, May, 2006, Hefei China H.Li Presented.
High Performance Divertor Target Plate, a Combination of Plate and Finger Concepts S. Malang, X.R. Wang ARIES-Pathway Meeting Georgia Institute of Technology,
Page 1 of 15 Tungsten Structures for High Heat Flux Components: Opportunities & Challenges M. S. Tillack and the ARIES Team Japan-US Workshop on Fusion.
Swiss Industries - 20 th June Divertor and Blanket Systems: Design, Required technologies and Schedule M. Merola Head of the Internal Components.
Be/FS joining for ITER TBM Ryan Matthew Hunt FNST Meeting August 18, 2009 A collaboration between UCLA, SNL-Livermore, Brush-Wellman, Axsys Inc. and Bodycote.
Page 1 of 14 External Transition Joints for Tungsten Divertors D. Navaei, X. R. Wang, M. S. Tillack and the ARIES Team Japan-US Workshop on Fusion Power.
Japan-US Workshop held at San Diego on April 6-7, 2002 How can we keep structural integrity of the first wall having micro cracks? R. Kurihara JAERI-Naka.
for a neutrinos factory
ARIES High Heat Flux Components Workshop UCSD December 2008 Summary of Session 1 Near term HHFC design and R&D (ITER) Session Coordinator Richard.
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
March 3-4, 2008/ARR 1 Power Management Technical Working Group: TRL for Heat and Particle Flux Handling A. René Raffray University of California, San Diego.
11 th AFPA ITER In vessel Components P. Chappuis Guilin 1 st to 4 th Nov Slide 1 Philippe Chappuis IO Blanket Lead Engineer On Behalf of the ITER.
Japan considerations on design and qualification of PFC's for near term machines (ITER) Satoshi Suzuki 1, Satoshi Konishi 2 1 Japan Atomic Energy Agency.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft 02/24/2005 T. Ihli PL FUSION FZK - EURATOM ASSOCIATION 1 He-cooled Divertor Development in the.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Extrapolating Experimental Results for Model Divertor.
Heat Treatment of Metals
Thermal Processing of Metal Alloys
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
The E.O. Paton Welding Institute 1 NEW TECHNIQUE FOR EXPLOSION WELDING OF HIGH-STRENGTH ALUMINUM ALLOYS OF SERIES 7xxx S.Yu. Illarionov*, L.D. Dobrushin**,
Fracture and Creep in the All-Tungsten ARIES Divertor
Prototype Divertor System: Steels and Fabrication Technologies Sameer Khirwadkar (Prototype Divertor Development Division) 21-July-2008 Institute for Plasma.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
1 SOFE, Chicago, IL, June 27, 2011 Design of the ITER First Wall and Blanket A. René Raffray, Mario Merola and Contributors from the ITER Blanket Integrated.
Selection of Plasma Facing Components for ITER and ITER Operational plan V. Chuyanov (Thanks to Y. Shimomura ) ITPA Garching May
Managed by UT-Battelle for the Department of Energy Stan Milora, ORNL Director Virtual Laboratory for Technology 20 th ANS Topical Meeting on the Technology.
- heating on at required temperature - dwell at temperature - cooling
Final Meeting TW5-TSW-001 Deliverable 7 SCKCEN, L. OomsCulham, October 23–24, 2006.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
26/3/03J.E Campagne LAL Horn R&D J.E Campagne, A. Caze (Ph. D), CNGS Horn: G. Macé, S. Wallon New persons: J. Bonis, M. Omesh,… Other IN2P3 members: J.
W coating of CFC tiles for the JET new wall - Task Agreement: JW6-TA-EP2-ILC-05 Manufacturing and testing of W-coated CFC tiles for installation in JET.
Some Thoughts on Phase II for Target fabrication, injection, and tracking presented by Dan Goodin Georgia Institute of Technology February 5th & 6th, 2004.
H. Bolt, Fast Track Concept in the European Fusion Programme Harald Bolt Max-Planck Institute for Plasma Physics, Garching EURATOM Association.
Pacific Northwest National Laboratory U.S. Department of Energy TBM Structure, Materials and Fabrication Collaboration Issues R.J. Kurtz 1, and A.F. Rowcliffe.
Pacific Northwest National Laboratory U.S. Department of Energy Initial Cost Estimates for Development of DCLL TBM Ferritic Steel Structural Components.
ITER In-Vessel Coils (IVC) Interim Design Review Thermal Structural FEA of Feeders A Brooks July 27, 2010 July 26-28, 20101ITER_D_353BL2.
Heat Loading in ARIES Power Plants: Steady State, Transient and Off-Normal C. E. Kessel 1, M. A. Tillack 2, and J. P. Blanchard 3 1 Princeton Plasma Physics.
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
Session 3.2: Material – PMI and High Heat Flux Testing R. Neu: Recent PMI Experience in Tokamaks R. Doerner: PMI Issues beyond ITER M. Roedig: High Heat.
Fracture and Creep in an All- Tungsten Divertor for ARIES Jake Blanchard University of Wisconsin – Madison August 2012.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Mario Merola EU R&D on Divertor Components Presented by Mario Merola EFDA Close Support Unit, Garching, Germany.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Summary.
1 Radiation Environment at Final Optics of HAPL Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI HAPL Meeting ORNL March.
First Wall Panel - Overview
FIP/1-1 Development of Tungsten Monoblock Technology for ITER Full-Tungsten Divertor in Japan 25th Fusion Energy Conference (FEC 2014) Saint Petersburg,
Workshop on Beryllium Applications and Health & Safety
Ti/SS transitions A.Basti INFN-PISA*
Produktentwicklung und Maschinenelemente
Cedric Garion, TE-VSC-DLM, WP12
Thermo-mechanical simulations jaws + tank
By: Engr. Hassaan Bin Younis
Modified Design of Aries T-Tube Divertor Concept
FIP/1-2 25th Fusion Energy Conference October 13-17, 2014
Prototype Diamond-like Carbon (DLC) Stripper Foils for NPAs
Phase II Collimators : design status
Annual Report on the IA for Co-operation on Tokamak Programmes
Presentation transcript:

Technology R&D Activities for the ITER full-Tungsten Divertor Presented by Patrick Lorenzetto Fusion for Energy, Barcelona, Spain Use preferably the corporate colours Use the Calibri font Don't centre text. All body text should be aligned left. Don't enlarge pictures beyond their actual size/resolution. Make sure you understand how bulleted lists work. The views and opinions expressed herein do not necessarily reflect those of the ITER Organization 24th IAEA - Fusion Energy Conference San Diego (CA), 08-13.10.2012

List of co-authors Japan Atomic Energy Agency, Naka, Ibaraki, Japan B. Riccardi, P. Gavila, M. Bednarek, G. Saibene Fusion for Energy, Carrer Josep Plà 2, B3, 08019 Barcelona, Spain F. Escourbiac, T. Hirai, M. Merola, R. A. Pitts, ITER Organization, Route de Vinon / Verdon, 13115 St. Paul lez Durance, France S. Suzuki, Y. Seki Japan Atomic Energy Agency, Naka, Ibaraki, Japan A. Makhankov, N. Litunovsky, S. Mazaev, I. Mazul Center "SINTEZ", Efremov Institute, Metallostroy, St.Petersburg, 196641, Russia Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012

Content Full-Tungsten divertor design Introduction Full-Tungsten divertor design ITER full-Tungsten divertor qualification programme EU Domestic Agency R&D activities for the procurement of the Inner Vertical Target (IVT) JA Domestic Agency R&D activities for the procurement of the Outer Vertical Target (OVT) RF Domestic Agency R&D activities for the procurement of the Dome Conclusion Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012

Introduction The current ITER Baseline foresees the use of carbon fibre composite (CFC) as armour material in the high heat flux (HHF) strike point regions of the 1st divertor and Tungsten (W) on all other plasma- facing locations. Extensive Research and Development (R&D) programme in the three Domestic Agencies (DA), Europe, Japan and the Russian Federation, who will supply the first ITER divertor components. Fabrication technologies developed for the W parts can achieve much higher performance than originally specified (up to 20 MW/m2). Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012

Introduction - (i) develop a full-W divertor design, In November 2011, the ITER Council endorsed a cost containment proposal from the ITER organization (IO) to delay the decision on the choice of the divertor materials and to investigate the possibility to begin operations with a full-W divertor, and requested that a work programme be implemented to - (i) develop a full-W divertor design, - (ii) qualify the corresponding fabrication technologies and - (iii) investigate critical physics and operational issues with support from the R&D Fusion Community. This paper presents the status of progress of the technology R&D work programme implemented by IO and the DAs to prepare for the procurement of a full-W divertor. Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012

W-Divertor Design Development Three phases of design development (see poster from F. Escourbiac ITR/P5-08): Pre-detail design phase for cost estimation Preliminary design phase to finalize the structural parts Final design phase to deliver the design and 2D drawings of the structural parts and PFUs Main features of the full–W divertor remain largely unchanged to minimize impacts on other interfacing systems (e.g. cassette body), making modifications only where necessary, e.g. to mitigate as much as possible against melting during slow and fast transient heat pulse events. Design Validation by Analysis Neutronic Analysis 3-D Heat Load Distribution Study E.M., thermal and stress analyses Plasma Facing Surface Shaping Study Armour lifetime study ITER full-W Divertor Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012 6

W-Divertor Design Development Tilting of PFCs Aim: Full shadowing of PFC edges under steady state and slow transient loads; Design parameters: Tilting axis and tilting angle. Fish-Scale Aim: Full shadowing of PFU edges, under steady-state and slow transient loads; at Target Design parameter: monoblock chamfer depth. OVT Baffle Aim: Full shadowing of PFC edges, under Downward VDE loads; toroidal shape Design parameters: Set-back depth and No. of PFU consisting the set-back. Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012 7

 Strong collaboration between IO and DAs put in place. W-Divertor Qualification Program Tungsten Divertor Qualification Programme to address the most critical issues Technology Development and Validation: Demonstration of the fitness-for- purpose of the proposed technology by means of full-W small-scale mock-ups; Full-scale demonstration: Demonstration of the feasibility via full-scale prototype manufacturing and testing. HHF tests for small-scale and full-scale-prototype PFU straight part • 5000 cycles at 10 MW/m2 + 300 cycles at 20 MW/m2 HHF test for prototype PFU curved part • 5000 cycles at 5 MW/m2 ~2 m Full-scale OVT PFU or IVT PFU ~ 60 mm Small-scale mock-ups Task Agreements to support DAs activity are ready to be implemented Design development at the IO and R&D activities for full-W divertor at DAs  Strong collaboration between IO and DAs put in place. Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012 8

IVT fabrication technologies developed in EU Monoblock design concept EU Domestic Agency R&D activities for the procurement of the IVT IVT fabrication technologies developed in EU Monoblock design concept Two joining techniques have been developed in EU to bond the soft Cu to the CuCrZr heat sink tube: - Hot Isostatic Pressing (HIPing) - Hot Radial Pressing (HRPing) HIPing is done at 900C then solution annealing, quenching and age hardening (480 C for 2 h) to achieve the required mechanical properties on the CuCrZr alloy. HRPing is done at 580 C for 2 h. Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012

EU Domestic Agency R&D activities for the procurement of the IVT Thermal fatigue tests of divertor medium scale mock-ups (CFC/W divertor design variant, 12 ID pipes) Baseline tungsten monoblock concept was developed for low heat flux values (5 MW/m2) representative of the baffle region. However, un-irradiated and irradiated W mock-ups (up to 0.5 dpa at 200 °C) with 10 mm inner diameter (ID) cooling pipes sustained thermal fatigue testing at 18-20 MW/m2 for 1000 cycles. W surface condition 1000 cycles at 10 MW/m2 1000 cycles at 15 MW/m2 300 cycles at 20 MW/m2 No significant visible effect. Surface alteration but no W melting. W surface cracking with no disbonding at cooling tube interface. Surface alteration but no W melting. Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012

Pre-qualif. prototypes EU Domestic Agency R&D activities for the procurement of the IVT Launching of an extensive fabrication and testing development program to confirm the manufacturing feasibility 15 mock-ups and 2 pre-qualification prototypes by HRP (600 °C) at Ansaldo Nucleare. 3 different W grades have been used. Small scale mock-ups Pre-qualif. prototypes 25 mock-ups (of 5 different monoblock geometries) and 1 pre-qualification prototype by HIPing at Plansee. 2 full-scale IVT prototypes by HRPing and HIPing at Ansaldo and Plansee respectively. Full-scale prototypes Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012

Status of full-tungsten divertor development JA Domestic Agency R&D activities for the procurement of the OVT Status of full-tungsten divertor development in JAEA/JADA In JAEA/JADA, tungsten-armored divertor components have been developed not only for the baffle part of the ITER divertor outer target (OVT) but also for DEMO divertor components. JAEA/JADA has ever developed a small-scale tungsten-armored divertor mock-up which survived a heat flux of 20 MW/m2 for 1000 cycles (See poster from Y. Seki "ITR/P5-06"). However, the specification of the tungsten armor used in this mock-up (HIP-molded tungsten, not rolled one) is slightly different from the ITER requirement. In 2012, 12 small-scale divertor mock-ups with ITER divertor relevant tungsten armor has been developed and will be HHF tested in 2012-2013 at JAEA/JADA. Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012 12

JA Domestic Agency R&D activities for the procurement of the OVT Fabrication route developed by the JADA Specification of W: ASTM B760-86 standard material (ITER requirement). Bonding method of soft Cu interlayer: NDB ("Non-defect bonding" patented by Nippon Tungsten Co., Ltd.): Cu casting onto W monoblock; HIP bonding; Diffusion bonding. Joining of CuCrZr pipe by brazing with Ni-Cu-Mn braze alloy at 980 oC for 30 min. Quenching rate to recover the mechanical strength of the CuCrZr pipe after ageing heat treatment at 480 oC for 2 hours. Soft Cu interlayer W 986oC→867oC 867oC→622oC Vickers Hardness 1st batch 0.12oC/s 4.9oC/s 104 Hv300gf 2nd batch 0.10oC/s 3.2oC/s 94.6 Hv300gf Heater Off-->N2 gas injection to furnace N2 gas injection + Fan cooling Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012 13

JA Domestic Agency R&D activities for the procurement of the OVT Qty. W thickness [T] W longitudinal length [L] Tiles No. / mock-up Bonding method of soft Cu interlayer 3 16.5 mm 12 mm 5 NDB (Cu casting) 2 15.0 mm NDB 8 mm 7 HIP Diffusion bond W monoblock with 12/15 mm CuCrZr pipe These mock-ups will be HHF tested in an e-beam facility in JAEA mainly. Some of those mock-ups will be tested under the collaborative research program with Osaka-Univ. and Hyogo-Univ. using a plasma gun facility and e-beam facility. In addition, a collaborative experiment with FZJ under the IEA-NTFR agreement is planned to perform HHF test simulating cyclic ELM-like loading. The implementation of a formal R&D task on W divertor target is under negotiation with IO. CuCrZr tube Pure Cu interlayer Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012 14

RF Domestic Agency R&D activities for the procurement of the Dome Fabrication of PFU substrates Dome PFUs substrates consist of 316L(N)-IG steel base structures joined by full penetration laser welding onto bimetallic CuCrZr alloy / 316L(N)-IG steel covers. The bimetallic covers are manufactured from CuCrZr alloy plates and 316L(N)-IG steel plates by explosion bonding and have an hypervapotron design. 316L(N) steel base structures and CuCrZr alloy /316L(N) steel covers prepared to laser welding Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012 15

Full-scale mock-up of the outer particle reflector plate (OPRP) RF Domestic Agency R&D activities for the procurement of the Dome Armouring of Dome PFUs Dome Armour consists of flat bimetallic W/Cu tiles of ~ 2324(8W+2Cu) mm3 dimensions produced by casting technique. The tiles are bonded onto a CuCrZr alloy substrate by brazing with STEMET® 1108 Cu-based braze alloy. Brazing is performed in industrial vacuum furnaces with ohmic heaters. The heating cycle combines armour joining process with subsequent recovery of the CuCrZr alloy properties. OPRP in brazing furnace Inner PRP mock-up Heat cycle combining armour brazing and ageing heat treatment of the CuCrZr heat sink Full-scale mock-up of the outer particle reflector plate (OPRP) Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012 16

Repaired Dome mock-ups RF Domestic Agency R&D activities for the procurement of the Dome Development of armour repair technique Such W armour repair technique was developed and successfully demonstrated on Dome mock-ups with both flat and curved armoured surfaces through high heat flux testing for 1000 cycles at 3 MW/m2 + 1000 cycles at 5 MW/m2. Repaired Dome mock-ups Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012 17

Conclusion The design of a full-W Divertor is being prepared by IO leaving the baseline design largely unchanged and making modifications only where necessary, e.g. ensuring no leading edges on the plasma facing components. Manufacture and testing of small-scale mock-ups and full-scale qualification prototypes are being performed by DAs for adapting and validating the fabrication technologies developed for the CFC/W divertor to the more demanding heat load requirements of the full-W divertor. Promising preliminary results give confidence of success of this development work programme. If confirmed, such a successful outcome will be an important milestone for the decision to be taken by the end of 2013 to begin ITER operations on a full-W divertor. Technology R&D activities for the ITER full-W divertor – ITR/2-3 24th IAEA-FEC 2012, San Diego (CA), 08-13.10.2012