Incorporating HPRF in a Linear Cooling Channel: an Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley.

Slides:



Advertisements
Similar presentations
Incorporating HPRF in a Linear Cooling Channel: an Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley.
Advertisements

Beam Test of a High-Pressure GH 2 -Filled RF Cavity (for efficient muon beam cooling for a MC or NF, since the low-Z ionization energy-loss absorber and.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
10 June 2006MICE Collaboration Meeting CM-151 Can MICE Solid and Liquid Absorbers be Characterized to better than 0.3 Percent? Michael A. Green 1, and.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Bunched-Beam Phase Rotation- Variation and 0ptimization David Neuffer, A. Poklonskiy Fermilab.
1 26 Nov 2010 SOLID ABSORBERS Solid absorbers will provide first cooling demonstration –This is important for a number of reasons! Can use only solids.
Progress on the MICE Cooling Channel Solenoid Magnet System
Thoughts on Incorporating HPRF in a Linear Cooling Channel Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory NuFact09—IIT.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
10 October 2006 MICE CM-16 at RAL 1 Distributed versus Lumped Coupling Magnets Michael A. Green and Soren Prestemon Lawrence Berkeley Laboratory, Berkeley.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
2/7/2002 RolMUCOOL/MICE1 20b. Gaseous Energy Absorber, 21a. High Pressure RF Cavities New Money for New Approaches DOE Small Business Innovation Research.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
MICE absorber and Window / flow Design Wing Lau, Giles Barr & Stephanie Yang Oxford University MICE Meeting Berkeley, Oct 2002.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
-Factory Front End Phase Rotation Optimization David Neuffer Fermilab Muons, Inc.
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
RF background, analysis of MTA data & implications for MICE Rikard Sandström, Geneva University MICE Collaboration Meeting – Analysis session, October.
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Mahzad - 8/9/2007 AAC Presentation 1 High Pressure RF Studies Mahzad BastaniNejad Muons, Inc., Old Dominion University Muons, Inc.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
Design Concepts for Magnetic Insulation Diktys Stratakis Advanced Accelerator Group Brookhaven National Laboratory NFMCC Meeting – LBL January 28, 2009.
Feb 15, 2008S. Kahn -- RF in HCC Channel1 Examination of How to Put RF into the HCC Steve Kahn Katsuya Yonehara NFMCC Meeting Feb 15, 2008 Muons, Inc.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Mar 19, 2008 S. Kahn -- RF in HCC Channel 1 Examination of How to Put RF into the HCC Steve Kahn NFMCC Meeting Mar 19, 2008.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Aug 9, 2008S. Kahn -- HCC Magnet Plans1 HCC Magnet Future Plans Steve Kahn Aug 9, 2008 NFMCC Friday Meeting.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MCTF Andreas Jansson MUTAC Meeting 8-10 April MCTF EXPERIMENTAL ACTIVITES - towards demonstrating 6D cooling.
Recent progress of RF cavity study at Mucool Test Area Katsuya Yonehara APC, Fermilab 1.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
The integration of 420 m detectors into the LHC
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Hybrid Fast-Ramping Synchrotron to 750 GeV/c J. Scott Berg Brookhaven National Laboratory MAP Collaboration Meeting March 5, 2012.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Progress of high pressure hydrogen gas filled RF cavity K. Yonehara APC, Fermilab 11/02/111 Joint MAP & High Gradient RF Workshop, K. Yonehara.
Progress of High Pressure Hydrogen Gas Filled RF Cavity Test Katsuya Yonehara Accelerator Physics Center, Fermilab Muon Accelerator Program Review Fermilab,
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
Progress on Beryllium Cavity Design R. Fernow, D. Li, R. Palmer, D. Stratakis, S. Virostek as told to Michael S. Zisman Center for Beam Physics Accelerator.
Stress and cool-down analysis of the cryomodule
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
M. Migliorati, C. Vaccarezza INFN - LNF
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Presentation transcript:

Incorporating HPRF in a Linear Cooling Channel: an Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory and Juan Gallardo Advanced Accelerator Group Physics Department Brookhaven National Laboratory NFMCC Meeting—U.-Mississippi January 14, 2010

NFMCCmtg:Zisman2 Introduction We have evidence that vacuum RF cavity gradient performance degrades in a strong magnetic field —alternative approach of HPRF does not o though it has other potential issues It seems prudent to begin investigating the technical aspects of implementing HPRF in a linear cooling channel MCTF

January 14, 2010NFMCCmtg:Zisman3 HPRF Issues Many differences between HPRF and “standard” linear cooling channel —energy loss distributed rather than limited to discrete absorbers —loss medium gaseous rather than liquid hydrogen or LiH o likely requires some modularity for safety reasons —must match gradient to energy loss, even if max. gradient can be higher o cannot take full advantage of high maximum gradient MCTF

January 14, 2010NFMCCmtg:Zisman4 Hybrid Channel Strategy Primary purpose of HPRF is to avoid degradation from magnetic field —use gas only to deal with this task o requires much lower pressure than to reach material limit For the Study 2a case, we need gradient of ~15 MV/m —from HPRF test cavity, expect this to require only ~34 atm at room temperature o or ~9 atm at 77 K —need eventually to confirm with 201-MHz cavity o Tollestrup has pointed out that 34 atm may be overkill At this pressure, GH 2  E is ¼ of LiH  E —reduce LiH thickness by 25% to maintain same overall  E o not exactly right due to different beta weighting –but, a reasonable starting point for re-optimizing channel performance

January 14, 2010NFMCCmtg:Zisman5 Initial Evaluation (1) Looked at performance of proposed “hybrid” channel (Gallardo) —results encouraging, but not yet optimized o not much change in performance between gas-filled hybrid (red line) and vacuum (black line) channels –isolation window does have a substantial effect 

January 14, 2010NFMCCmtg:Zisman6 Initial Evaluation (2) Took quick look at effect of adding even one more Ti isolation window (Gallardo) —it hurts! —maintenance can be accommodated with gate valves o safety considerations may dictate more subdivisions –need to explore using lower Z window material  hydrogen embrittlement must be evaluated for each choice

January 14, 2010NFMCCmtg:Zisman7 Window Thickness Optimization Initial estimates used flat windows (uniform thickness) —engineering guidance (Lau) says that window can be thinner in the middle —implemented in ICOOL (crudely) o it helps substantially Isolation window (as seen by engineer) Isolation window (as seen by physicist)

January 14, 2010NFMCCmtg:Zisman8 Use of Be Isolation Windows Since Ti (or stainless steel) cause losses, look at using Be windows —use design concept from previous slide o even 17 windows looks almost acceptable –is this too good to be true?

January 14, 2010NFMCCmtg:Zisman9 Window Material Comparison To make sure we were not fooling ourselves, ran cases with both Be and Ti —the difference is obvious Will next look at Al and AlBeMet windows as time permits —Al is okay in terms of hydrogen embrittlement; not yet sure about other materials

January 14, 2010NFMCCmtg:Zisman10 Pressure Dependence (1) It is not clear that 34 atm is really needed —10-15 atm may suffice for 15 MV/m Looked at performance effects vs. pressure —varied LiH thickness to (roughly) keep same energy loss —windows sized for 34 atm always —Study 2a value was ~0.06  /p

January 14, 2010NFMCCmtg:Zisman11 Pressure Dependence (2) Looked at optimizing LiH thickness at fixed pressure of 20 atm —safety window thickness also scaled to 20 atm case —transmission is not very sensitive to LiH thickness

January 14, 2010NFMCCmtg:Zisman12 Comments on Implementation Modular system, with independent gas supplies and isolation windows, seems feasible —if low-Z isolation windows are okay Materials issues must be carefully considered —hydrogen embrittlement must be evaluated for all structural materials o also Cu, Be, and LiH; Al and Be-Cu alloys are particularly resistant Operating at LN temperature reduces P by factor of ~4 —but complicates engineering of channel o insulating vacuum, cooling of RF cavities, differential contraction,... —not convinced this is worth the trouble

January 14, 2010NFMCCmtg:Zisman13 Possible Implementation (A) Proposed concept with buffer vacuum illustrated here —compared with previous (NuFact09) talk, can conclude that Juan is better at drawing than I am Gas only in cavity and beam pipe; permits cryogenic operation if needed Cavity must be a pressure vessel!

January 14, 2010NFMCCmtg:Zisman14 Possible Implementation (B) A more “MICE-like” version is illustrated here Gas fills entire vessel; likely incompatible with cryogenic operation Cavity can be a thin-walled vessel

January 14, 2010NFMCCmtg:Zisman15 Implementation Issues (A) Pressure-vessel code issues must be dealt with for cavities and beam pipe —walls must be thick enough to withstand pressure RF window must be pressurized on both sides to 34 atm —Moretti believes this can be done with special epoxy “plug” o used successfully in MTA tests of 805-MHz HPRF cavity Vent/fill line design must avoid  P on LiH windows Cryogenic operation probably possible —need to insulate fill/vent lines outside vacuum area —need to accommodate differential contraction (e.g., between sections) o usually use bellows for this, but may not be possible with 34 atm of gas On the plus side, can likely keep hydrogen zone contained within apparatus

January 14, 2010NFMCCmtg:Zisman16 Implementation Issues (B) Cavity and tuners could be similar to MICE implementation Bellows connections between sections may not be permitted Vent/fill line must avoid  P on LiH windows Cryogenic operation more difficult —would require a vacuum-insulated outer layer —warming individual sections would be problematical unless bellows are permissible Outer vessel is a (substantial) pressure vessel Area outside containment vessel probably a hydrogen zone —special requirements for electrical equipment, lights and switches, hydrogen sensors,...

January 14, 2010NFMCCmtg:Zisman17 Summary Continuing to look at implications of using HPRF in linear cooling channel New “hybrid” approach (GH 2 and LiH) looks feasible —assuming HP gas option tolerates intense ionizing radiation o to be tested in MTA...eventually Looked briefly at issues of two alternative implementation schemes —both would be challenging —low-Z isolation flanges look benign o need to check AlBeMet and Al Cryogenic operation would reduce P by a factor of ~4, but at the expense of many engineering challenges —probably not cost effective for hybrid approach (and less necessary)

January 14, 2010NFMCCmtg:Zisman18 Acknowledgments Thanks to: Wing Lau (Oxford) for guidance on isolation window design Steve Virostek (LBNL) for discussions of implementation issues