FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.

Slides:



Advertisements
Similar presentations
CSC Test Beam Data Analysis Alexander Khodinov and Valeri Tcherniatine.
Advertisements

Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
SBS Hadron and Electron Calorimeters Mark Jones. SBS Hadron and Electron Calorimeters Mark Jones Overview of GEn, GMn setup Overview of GEp setup The.
SBS Hadron and Electron Calorimeters Mark Jones 1 TexPoint fonts used in EMF. Read the TexPoint manual before you delete this box.: AAA A.
The MAD chip: 4 channel preamplifier + discriminator.
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
E. Atkin, E. Malankin, V. Shumikhin NRNU MEPhI, Moscow 1.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
Digital Hadron Calorimetry using Gas Electron Multipliers Andy White University of Texas at Arlington.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
MDT-ASD PRR C. Posch30-Aug-02 1 Specifications, Design and Performance   Specifications Functional Analog   Architecture Analog channel Programmable.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
D. Peterson, “The Cornell/Purdue TPC”, ALCPG, Snowmass, 23-August The Cornell/Purdue TPC Information available at the web site:
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Xiaodong Wang ( 王晓冬 ) School of Nuclear Science and Technology Lanzhou University, Lanzhou, China MPGD activities at Lanzhou University July 5, 2013.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
Straw spatial resolution (beam test 2007 and 2008) A.Zinchenko, S.Shkarovskiy.
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
Luca Spogli Università Roma Tre & INFN Roma Tre
PNPI, R&D MUCH related activity ● Segmentation ● Simulation of the neutral background influence ● R&D of the detectors for MUCH ● Preparation to the beam.
1 Participation of the Joint Institute for Nuclear Research (Dubna) in PANDA experiment at Future GSI Facility Nuclear Structure Physics Physics with Antiprotons.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
Proportional chambers with cathode readout in high particle flux environment Michał Dziewiecki.
Single tube detection efficiency BIS-MDT GARFIELD Simulation GARFIELD Simulation Anode wire voltage as a function of the distance from the wire Electric.
HMPiD upgrade variant; simulation status N. Smirnov Physics Department, Yale University, May, 06. CERN visit.
29-Feb-16S.Movchan Straw status1 Choose of FEE chip for NA62 straw detector Beam tests results 2007 and 2008 (Straw spatial resolution) Comparison FEE.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Electronics for Range System Prototype Tests A. Piskun ITEP, Moscow, 28 April, 2010.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
SP- 41 magnet ZDC RPC (TOF) DC ST Target T0 detector MPD / NICA and / Nuclotron Experiments Picosecond Cherenkov detectors for heavy ion experiments.
PANDA experiment at FAIR (JINR Participation) project PANDA A.G.Olshevskiy for JINR PANDA team VBLHEP – DLNP – LIT - BLTP.
BMBF-JINR PANDA Meeting, Dubna, November 15, 2013 G.Alexeev (for muon group) Status of Project and Related Topics * Report to the Muon Review Panel ( CERN,
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
1 The Scintillation Tile Hodoscope (SciTil) ● Motivation ● Event timing/ event building/ software trigger ● Conversion detection ● Charged particle TOF.
G.Alexeev for Dubna group ITEP, April 28, 2010 Muon System Status Report from Dubna Hardware : * Full Scale prototype - in preparation to be put in work.
STATUS of BIG PROTOTYPES A. Piskun (for Dubna group) Protvino, 7 June 2011 _________________________________________________ Full Scale Prototype Range.
Work on Muon System TDR - in progress Word -> Latex ?
Electronics for Range System Prototype Tests
Novosibirsk, September, 2017
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
MDT second coordinate readout: status and perspectives
FSC status and plans Pavel Semenov IHEP, Protvino
PANDA Muon Group Meeting, Protvino 7 June 2011 G
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
MDT and analog FEE mass production:
Analog FE circuitry simulation
First results from prototype measurements
Dubna/JINR Status & Plans
KRB proposal (Read Board of Kyiv group)
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
IHEP group Shashlyk activity towards TDR
News on second coordinate readout
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Pre-installation Tests of the LHCb Muon Chambers
RPC Front End Electronics
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009

Status : * Basic elements of ‘on chamber’ FE electronics : - 8-channel amplifier Ampl-8.3 -> NIM, A 462 (2001) channel discriminator Disc-8.3 -> NIM, A 423 (1999) channel FE board ADB-32 -> NIM, A 473 (2001) 269 * Performance of above FE was proven in experiments : - Forward Muon System of D0/FNAL (50’000 channels) - Muon Wall 1 of COMPASS/CERN (8’500 channels) - Straw tracker of Thermolization/IHEP/Protvino (10’000 channels) * FE electronic R&D units developed and tested on stand with MDTs : - QTC-16, charge-to-time converter (for analog r/o, 16 channels) - A2QTC-16, QTC-16 with double cascade of Ampl A2-16, double cascade of Ampl-8.3, 16 channels - A2DB-32, universal analog/digital unit, 32 channels (to be tested) * Estimated number of FEE channels in PANDA Muon System : - Digital y/n : 32’000/wires + 50’000/strips = 82’000/total - Analog : pending R&D with large prototypes

PANDA Target Spectrometer 2600 MDTs Dipole RICH µ - Filter 700 MDTs FRS 900 MDTs ECAL Muon and Hadron Detection in PANDA by Range System TOTAL : about 4200 MDTs

Mini Drift Tube ( MDT ) module HV connector Gas connector 8 wire connectors

26 September 2006G. Alexeev DLNP, JINR muons 0.5 GeV1.0 GeV Monte Carlo generated events with Geant 4: 1x1x1 m 3 Range System 17x17 cm 2 beam spot Beam particles – red Secondaries - green Beam

26 September 2006G. Alexeev DLNP, JINR pions 0.5 GeV1 GeV

Pion/muon separation in RS at 0.8 GeV

Stand alone (no ECal) FRS response to hadrons Analog signal “Digital” signal (hits) Better than analog mode!

Test stand : different types of MDTs and FE electronics MDT module Ampl- 8.3 QTC part

An artistic view of tested MDTs G10 board, 4 strips, 1cm wide each 4 layers, 4 strips on each layer

Track reconstruction with 1cm x 8 cm strips  Tracks are near vertical and close to the center  σ ≈ 0.5 mm

Wire and strip signals Signals after the AMPL-8.3 on 50 Ohm load Single eventAveraged

Strip Signal Amplification Card (A2-16) Ampl 8.3 fro m MD T Trace 1: Anode signal, K≈60 mV/μA Trace 2: Strip signal, inverted, K≈480 mV/μA A2-16 card (two cascade Ampl-8.3 with 16 analog outputs). To Amplitude Analysis Amplifiers AMPL-8.3

26 September 2006G. Alexeev DLNP, JINR Proposal for the analog R/O of the MDT signals of the PANDA MUON TRACKER QTC Signal AMPL. TDC (F1) Serial data Interface ` Analog R/O for MDT (strips &/or pads) Using well known Wilkinson principle for Charge-to-Time Conversion Using F1 TDC chip as proven solution for pipe-line R/O THR in THR out TIME I in I out Q

Analog switch V discharge QIntegrator Comparator OUT Comparator IN THR out THR in 1 0 discharge completed Charge time circuit integration completed Conversion time F1-TDC card from Amplifier QTC block diagram

QTC analog input Voltage on integrator QTC digital output to TDC

QTC calibration for different rates (dead times) ~ 1.5 μs ~ 1.0 μs

26 September 2006G. Alexeev DLNP, JINR QTC card (16 channels) Calibration curve

ADB-16 (preamp) QTC, version 2

MDT signals analog R/O of the PANDA MUON TRACKER QTC TDC Signal Serial data Interface ` Analog R/O for MDT (strips &/or pads) Using well known Wilkinson principle for Charge-to-Time Conversion Using TDC chip as proven solution for pipe-line R/O THR in THR out TIME I out Q 16ch I in Ampl 8.3 AA-QTC card 16 ch

A2DB-32 Board * double cascade amplification (0,1-10 uA input signals +/-, Ampl-8.3) * 32 channels analog output +/- (>=50 Ohm load ) * 32 channels logic output (ECL, LVDS – Disc-8.3)

Full scale RS prototype (2m x 4m) for 2 nd coordinate strip R/O (manufactured, pending for r/o electronics) 45 short MDTs (360 wire r/o channels, maximum) 24 long MDTs (192 wire r/o channels, maximum) 4 m long strips, 1 cm width (192 strip r/o channels) 2 m long strips,1 cm width (360 strip r/o channels)

1530 mm 1000 mm 1060 mm RS prototype for beam test Fe volume ~ 1 m3 ( ~ 8 t ), 288 MDTs 1 m long 2000 channels of wire r/o channels of strip r/o

Plans for 2009 * Equip the full scale prototype with FE electronics for wire and strip r/o * Design and manufacture preamp board for strip r/o (based on Ampl-8.3) * Assemble and test A2DB-32 unit on stand with MDTs and full scale prototype at CERN * Develop r/o scheme for the RS (1 m 3 ) prototype based on experience gained with full scale prototype

Answers to I.Konorov’s QUIZ FEE : Detector performance : * Signal amplitude, expected noise A: 1-10 uA for wire signal and 0,1-1 uA for strip signal, expected noise is negligible for wires (just cosmic rate) and is expected the same for strips (but R&D with large prototypes required) * Time resolution A: for planned gas mixture (Ar:Co2=70:30) max.drift time ~ 250 ns gives a scale of “MDT’s time jitter” * Hit rate/channel. Distribution over detector A: hit rate/channel (occupancy) is small, mostly events are generated in Forward Spectrometer (FRS in case of Muon System) ; exact answer is pending the results of R&D and MC FEE : * front-end chip, ADC/TDC amplifier Ampl discriminator Disc-8.3; no ADC/any TDC (LVDS input, 32 channels)

* FEE partitioning and location in the spectrometer, radiation conditions ADB-32 boards (ampl+disc card, 32 channels) are located on the periphery of iron absorber (exact location still to be agreed with GSI); no special ‘rad.hard’ requirements – proposed fee has passed radiation test at muon systems (D0/FNAL, COMPASS/CERN)