The Development of Hardware Correlator in SHAO Zhijun Xu Shanghai Astronomical Observatory, CAS IVTW,10 - 13 November 2014, Groningen/Dwingeloo, the Netherlands.

Slides:



Advertisements
Similar presentations
SCARIe: Realtime software correlation Nico Kruithof, Damien Marchal.
Advertisements

Connecting Academic Networks The ORIENT, TEIN and GÉANT Projects: International Research Networks John Chevers, DANTE International eVLBI Workshop Shanghai,
Next Generation Workshop Chinese VLBI Software Correlator Development and its Applications Zheng Weimin, Yang Yan, Zhang Dong, Chen Zhong, Shu Fengchun,
The CVN Real Time Correlator Zhang Xiuzhong, Chen Zhong Shanghai Astronomical Observatory China 4th e-VLBI Workshop Sydney
Shanghai Astronomical Observatory 2009 East Asia VLBI Workshop1 A few Astronomical Observations of CVN Wang Weihua Shanghai Astronomical Observatory.
Numbers
Signal Processing for Aperture Arrays. AAVS1 256 antenna elements distributed over –4 stations –64 elements each.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
CVN software correlator development and its applications Zheng Weimin*, Zhang Juan, Tong Li, Tong Fengxian, Liu Lei, Chen Zhong, Shu Fengchun, Wang Guangli.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
New correlator MicroPARSEC Igor Surkis, Vladimir Zimovsky, Violetta Shantyr, Alexey Melnikov Institute of Applied Astronomy Russian Academy of Science.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
上海天文台 Shanghai Astronomical Observatory e-VLBI Progress in China Zhang Xiuzhong, team of Chinese VLBI Network Shanghai Astronomical Observatory Chinese.
VLBA Sensitivity Upgrade Project Status Jon Romney NRAO, Socorro 7 th US VLBI Technical Coordination Meeting Haystack Observatory 2009 November 3–4.
上海天文台 Shanghai Astronomical Observatory Recent VLBI Activities in China Zhi-Qiang Shen (Shanghai Astronomical Observatory) 2009 East Asia VLBI Workshop.
DBBC - EVN CDR Meeting, Bologna May 2005 DBBC Project G. Tuccari, S. Buttaccio, G. Nicotra - Istituto di Radioastronomia CNR, Sezione di Noto - Italy M.
TOW 2007: Correlator Theory Kerry Kingham - U.S. Naval Observatory Roger Cappallo – Haystack Observatory Mike Titus - Haystack Observatory.
IVS-4th General Meeting, Concepción- Chile, Jan 2006 DBBC - A Flexible Platform for VLBI Data Process G. Tuccari, S. Buttaccio, G. Nicotra - Istituto di.
Hirabaru, Koyama, and Kimura NICT APAN NOC Meeting January 20, 2005 e-VLBI updates.
Real Time Correlator in FPGA Xu ZhiJun, Zhang XiuZhong Shanghai Astronomical Observatory China 4 th IVS General Meeting January 9, 2006.
Latest GNSS results of the CMONOC network and its application in earthquake monitoring Junping Chen, Yize Zhang, Yibing Xie, Weijie Tan, Sainan Yang, Bin.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
Update on the Software Correlator Nico Kruithof, Huseyin Özdemir, Yurii Pydoprihora, Ruud Oerlemans, Mark Kettenis, JIVE.
上海天文台 Shanghai Astronomical Observatory 4th IVS General Meeting Spacecraft Tracking with Chinese VLBI Network Xiuzhong Zhang and Chinese VLBI Network Team.
Chinese Real Time VLBI Correlator Xiang Ying, Xu Zhijun, Zhu Renjie, Zhang Xiuzhong, Shu Fengchun, Zheng Weimin Shanghai Astronomical Observatory China.
Demonstration of 16Gbps/station broadband-RF VLBI system Alan Whitney for the VLBI2010 development team MIT Haystack Observatory 22 October st Intl.
上海天文台 Shanghai Astronomical Observatory VLBI correlators of Shanghai Astronomical Observatory ZHENG Weimin, Zhang Xiuzhong Shanghai Astronomical Observatory,
Possible eVLBI connection between Eastern Asian Observatories Noriyuki KAWAGUCHI National Astronomical Observatory, Japan eVLBI Workshop
3rd International VLBI Technology Workshop November Groningen/Dwingeloo, The Netherlands DSCC VLBI PROCESSOR (DVP) J.E. Clark 1, C. García-Miró.
上海天文台 Shanghai Astronomical Observatory CVN in Chang’e-3 lunar exploration mission ZHENG Weimin Shanghai Astronomical Observatory, Chinese.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
Netherlands Institute for Radio Astronomy 1 APERTIF beamformer and correlator requirements Laurens Bakker.
VGOS GPU Based Software Correlator Design Igor Surkis, Voytsekh Ken, Vladimir Mishin, Nadezhda Mishina, Yana Kurdubova, Violet Shantyr, Vladimir Zimovsky.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
EXPReS, NEXPReS, UniBoard
Astronomical Data Processing & Workflow Scheduling in cloud
Concepts for a Next-Generation VLBA
Signal Processing for Aperture Arrays
VLBI in China and the Collaboration with NL
Geodetic VLBI activities in China
Celestial and atmospheric H2O detection by direct RF sampling
The Development of Broadband VLBI Technologies in SHAO
JIVE UniBoard Correlator (JUC) Firmware
Testing Multibit Encoding Schemes
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
HOW TO ADD PRIVATE CHANNELS ON ROKU ROKU provides a thousands of channels for the various users. In addition to these channels there are number of channels.
ELC 200 Day 17.
IP Culture in China: the view from Shanghai
Simultaneous Multi-Frequency Obs. -Phase Compensation, mm-VLBI
THANK YOU!.
The Uniboard  FPGA Processing for Astronomy
Thank you.
Thank you.
UNIBOARD : VLBI APPLICATION CHARACTERIZATION
Performance What hardware accelerators are you using/evaluating?
Shanghai VLBI Center Activities
17/04/2019 Future VLBI systems Tasso Tzioumis| Facilities Program Director– Technologies for Radio Astronomy CSIRO Astronomy and Space Science IVTW.
Integrated Neighbourhood Teams
C.2.10 Sample Questions.
DBBC Stutus Report November 2007
C.2.8 Sample Questions.
C.2.8 Sample Questions.
Advanced Radio Astronomy in Europe Contract no.:
Information technology
Presentation transcript:

The Development of Hardware Correlator in SHAO Zhijun Xu Shanghai Astronomical Observatory, CAS IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

VLBI in China IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

CE-1 & CE-2 Hardware Correlator IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

CE-1 & CE-2 Hardware Correlator IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

CE-3 Hardware Correlator IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

CE-3 Hardware Correlator IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

Uniboard Correlator IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

Uniboard Correlator IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

Correlator Data Explosion ModuleFunctionVolume Data Playback256MHz *1bits*1station*32channel 8Gbps/chip Quantification256MHz*16bits*1station*32channel 128Gbps/chip Fringe Stopping256MHz*16bits*1station*32channel*2complex 256Gbps/chip FFT256MHz*16bits*1station*32channel*2complex /2symmetry 128Gbps/chip FSTC256MHz*16bits*1station*32channel*2complex /2symmetry 128Gbps/chip MAC256MHz*32bits*10baseline*8channel*2complex /2symmetry 640Gbps/chip LTA(32bits*32channel*2complex*10baseline*1024fftsize /2symmety)/1s integration 10Mbps IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

Uniboard Correlator v2 IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

Correlator Data Explosion ModuleFunctionVolume Data Playback256MHz *1bits*1station*32channel 8Gbps/chip Quantification256MHz*16bits*4station*8channel 128Gbps/chip Fringe Stopping256MHz*16bits*4station*8channel*2complex 256Gbps/chip FFT256MHz*16bits*4station*8channel*2complex /2symmetry 128Gbps/chip FSTC256MHz*16bits**4station*8channel*2complex /2symmetry 128Gbps/chip MAC256MHz*32bits*10baseline*8channel*2complex /2symmetry 640Gbps/chip LTA(32bits*32channel*2complex*10baseline*1024fftsize /2symmety)/1s integration 10Mbps IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

Some Result From same source and sample by 2 CDAS2 (16channel 2bits 512MHzBW) IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

Further Thoughts IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

Further Thoughts IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

ROACH-2 IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

Further Thoughts IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

CE-3 Red Hardware Correlator Black Software Correlator IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

CE-3 IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

CE-5T1 IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

Hardware Correlator Team IVTW, November 2014, Groningen/Dwingeloo, the Netherlands

Thank You ! IVTW, November 2014, Groningen/Dwingeloo, the Netherlands