LFB, LLRF, TFB Alessandro Drago Annecy, 16-19 March 2010.

Slides:



Advertisements
Similar presentations
Lorentz force detuning measurements on the CEA cavity
Advertisements

Ion instability at SuperKEKB H. Fukuma (KEK) and L. F. Wang (SLAC) ECLOUD07, 12th Apr. 2007, Daegu, Korea 1. Introduction 2. Ion trapping 3. Fast ion instability.
1 Design of a Mixed-Signal Feedback Damper System Michael J. Schulte * Some slides are provided by Craig Deibele (Oak Ridge National Laboratory) and Anil.
SESAME Storage Ring RF-System
Longitudinal instabilities: Single bunch longitudinal instabilities Multi bunch longitudinal instabilities Different modes Bunch lengthening Rende Steerenberg.
RF Stability Working Group Jorn Jacob (ESRF), John Byrd (LBNL) General Issues RF phase and amplitude noise –filtered by cavity and translate into timing.
1/19/06 Klystron Linearizer PEP-II MAC Review January 19, 2006 D. Van Winkle, Claudio Rivetta, Dmitry Teytelman, John Fox, Themistoklis Mastorides, Jim.
DESIGN OF A 7-CELLS, HOM DAMPED, SUPERCONDUCTING CAVITY FOR THE STRONG RF FOCUSING EXPERIMENT AT DANE David Alesini, Caterina Biscari, Roberto Boni, Alessandro.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
ME 270 Final Project Presentation Operational Amplifiers.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Tomasz Czarski, Maciej Linczuk, Institute of Electronic Systems, WUT, Warsaw LLRF ATCA.
RF Cavity Simulation for SPL Simulink Model for HP-SPL Extension to LINAC4 at CERN from RF Point of View Acknowledgement: CEA team, in particular O. Piquet.
LLRF Cavity Simulation for SPL
SESAME STORAGE RING RF-SYSTEM SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH.
Grzegorz Jablonski, Technical University of Lodz, Department of Microelectronics and Computer Science XFEL-LLRF-ATCA Meeting, 3-4 December 2007 XFEL The.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
RF Cavity Simulation for SPL
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
Booster Dampers Update Nathan Eddy PIP Meeting 4/30/14.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
9/6/2007 PEP-II LER RF High Current MD Report Dan Van Winkle, Claudio Rivetta, Kirk Bertsche, Themis Mastorides.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
LLRF_05 - CERN, October 10-13, 2005Institute of Electronic Systems Superconductive cavity driving with FPGA controller Tomasz Czarski Warsaw University.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
KEKB crab RF architecture & controls K.Nakanishi KEK Dec. 16, 2010 LHC-CC10 1.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Diamond LLRF Activities Pengda Gu For DLS RF Group.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
Beam dynamics in crab collision K. Ohmi (KEK) IR2005, 3-4, Oct FNAL Thanks to K. Akai, K. Hosoyama, K. Oide, T. Sen, F. Zimmermann.
Feedback Simulations with Amplifier Saturation, Transient and Realistic Filtering Mauro Pivi, Claudio Rivetta, Kevin Li Webex CERN/SLAC/LBNL 13 September.
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
By. Jadhav Avinash J Roll no - 2K13E11. Reference: Hewlett Packard Agilent Technology Wikipedia GwINSTEK.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
BE-RF-FB THE LINAC4 LOW LEVEL RF 02/11/2015 LLRF15, THE LINAC4 LOW LEVEL RF2 P. Baudrenghien, J. Galindo, G. Hagmann, J. Noirjean, D. Stellfeld, D.Valuch.
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Feedback System Design Alessandro Drago SuperB Meeting January 2000 SLAC.
LFB, LLRF, TFB update Alessandro Drago XIII SuperB General Meeting Isola d’Elba, 5/30-6/
Feedback Systems Update Alessandro Drago SuperB General Meeting Perugia June 2009.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
RF acceleration and transverse damper systems
Dither Luminosity feedback versus Fast IP feedback
Bunch-by-bunch feedbacks and Low Level RF
Working groups status report on Feedbacks
Feedback systems and Low Level RF
ILC LLRF Status Ruben Carcagno, Brian Chase
Feedbacks for low emittance accelerators
Cavity-beam interaction and Longitudinal beam dynamics for CEPC DR&APDR 宫殿君
LLRF Functionality Stefan Simrock How to edit the title slide
Limits on damping times
Feedback Systems in Circular Colliders
Presentation transcript:

LFB, LLRF, TFB Alessandro Drago Annecy, March 2010

Introduction Activities on different design aspects are in progress with analysis of the last parameters data set LFB: Longitudinal beam / RF / b-b-b fb preliminary simulations Low Level RF spec’s discussion Transverse feedback upgrades Conclusions

Simul2 longitudinal simulator Developed by Mauro Migliorati in 1992 Written in FORTRAN Longitudinal beam + RF + LFB behavior code Modern data I/O interface re-written in Matlab including (“embedded”) the previous FORTRAN program Data base input by editor: this, for some data, is not the fast way to insert new inputs With large amount of beam current and bunches the every simulation run can take more than 40 minutes - so to test many different data set can be very time consuming

11 RF modes in data base

LER – baseline parameters - full current (2.447A) – b.space 2 – rad.loss 2MeV/turn – no injection kick – no feedbacks  the beam is lost ph*.dat contains the phase of a bunch as a function of the number of turns, phsp*.dat contains the longitudinal invariant of the motion. In order to see the exponential growth of the instability it is easier to work with the invariant since the phase is subject to the synchrotron oscillations. 30k turns

LER – 70% current – b.space 2 – rad.loss 2 MeV/turn – no inj.kick – no LFB

LER – 70% current – b.space 2–rad.loss 0.8 MeV/turn – no inj.kick – no LFB Decreasing the radiation loss/turn  LFB is clearly needed

FIR filter (LER) with phase response at exactly -90 degrees Synchrotron frequency 2.8kHz Down sampling factor =14 Taps = 6 coefficient = deltaT = e-5 sec

Changing synchrotron phase response to +45 degree FIR filter coefficient:

degree: good damping ! ~10E-3

Exactly -90 degree: better damping (500w) ! <10E-3

Full current, fb on: 500W

Simulation data: full current (2.447A), 978 bunches, lfb on, power amplifiers=1kW  multibunch longitudinal motion damped FIR filter implemented

Full current, fb on, 5kW, much better damping time

High current case (4A), but spaced by 2, lfb on, 1kW power is not more sufficient and the beam is lost

High current case (4A), sp.by 2, lfb on, also 2kW power is not sufficient and the beam is lost again

High current case (4A), sp.by 2, lfb on, increasing the power, 2.5kW is now sufficient to control the beam longitudinal dynamics

High current case (4A), sp.by 2, lfb on, with 5kW the power controls more efficiently the beam longitudinal dynamics

LLRF - Low Level RF System description (from CDR2 by Sacha Novokhatski) A low-level RF system provides control and feedback for stable multi- bunch high current operation. There are several feedback loops. BLOCK DIAGRAM OF LLRF CIRCUITS

LLRF System description (from CDR2 by S.N.) The direct loop is required for lowering the cavity impedance to reduce multi-bunch oscillations of the beam. Functionally the direct loop keeps the gap voltage constant as set by a DAC reference over an 800 kHz bandwidth. The loop compares the combined baseband field signals of a station's cavities to the reference generated by the gap module. The resultant error signal is up-converted to RF and drives the klystron. The direct loop contains a PID controller with an integral compensation for smoothing out the ripple caused by the klystron high voltage power supply and lead compensation that increases the bandwidth and gain of the loop. The direct feedback loop options control the optional functions of the direct loop: frequency offset tracking, integral compensation and lead compensation. The frequency offset tracking loop takes out the phase shift caused by detuning of the cavities during heavy beam loading. It is used as a diagnostic for adjusting the waveguide network. The comb loop provides additional impedance reduction for the cavities at specific synchrotron frequency sidebands around the revolution harmonics of the beam. It operates over a bandwidth of 2 MHz and includes a 1 turn delay. The tuner loop tunes and maintains each cavity at resonance. It corrects for thermal frequency variations and compensates cavity beam loading by keeping the phase relationship between forward power and cavity field, as seen by the cavity probe, constant. The relevant phases are measured by digital IQ detectors and the loop is completed in software controlling the tuner position via a stepping motor. The HVPS loop adjusts the voltage to the klystron to provide sufficient output power to operate the station under whatever gap voltage or beam loading is requested. Functionally the loop keeps the klystron operating at about 10% below saturated output power. The loop measures the drive power at the input to the klystron and compares it to the ON CW drive power set-point. Based on the error the set-point for the high voltage power supply is adjusted up for excessive drive and down for insufficient drive. This is a slow loop with about a 1 Hz bandwidth. The DAC loop is a slow (0.1 Hz bandwidth) loop in software which functionally keeps the measured gap voltage of the station equal to it's requested "Station Gap Voltage" by adjusting the DAC in the gap voltage feed-forward module. The ripple loop is intended to remove amplitude and phase ripple in the klystron output power but at the time it is only utilized to keep the low bandwidth phase across the klystron and drive amplifier constant as the klystron voltage is varied. The gap feed forward loop is required to tell the direct loop to ignore the effects of the ion-clearing gap in the beam bunch train. Functionally the loop learns about the variation in the klystron drive caused by the beam gap and adds an equal variation in the reference signal so that the error signal driving the klystron stays unchanged. This loop adapts fully in about 1000 beam revolutions. The longitudinal feedback woofer is the third cavity impedance reduction loop along with the direct loop and the comb loop. It derives it's information from the lowest beam oscillation modes detected by the longitudinal bunch-by- bunch feedback system and uses one RF station in each ring as a powerful longitudinal kicker.

SuperB LLRF design project Olivier and Christophe are going to study a preliminary LLRF design proposal. A discussion of the specifications is started.

SuperB bunch-by-bunch feedbacks bunch 2.1 ns Operator interface realtime and offline analysis programs DPU 16bit DAC FPGA 12bit ADC DPU 16bit DAC FPGA 12bit ADC  250W/500W x x 6*RF LP RF (476MHz) Inj.Trigger User trigger LAN Comb gen. a*RF W AM Phase detector x 3*RF LPAmplitude detector 31.5cm longitudinal transverse

TFB front end tests on DAFNE In collaboration with KEK (M.Tobiyama) And, partially, with SLAC (J.Fox)

TFB front end components In collaboration with KEK (M.Tobiyama) Qpsk generator circuit designed for SuperKEKB

Two iGp feedback systems (but without source code!) with 12-bit ADC and 16 bit DAC have been ordered to Dimtel inc., and will be tested in the next DAFNE run Two new LFB front end Are also been bought to be tested in the next DAFNE run

Conclusions the new beam parameters have been inserted in the Simul2 longitudinal simulator data base The simulator can accept the new data set without changes to the code – Preliminary runs have be done in the last week Having radiation loss as in the table, a bunch-by-bunch longitudinal feedback is necessary to run at full beam current (2.447A) or more The LFB FIR filter has been designed and damps well The longitudinal power shall be at least 1kW (=4x250 W amplifiers) The option high current (4A) asks for more power, of the order of 2.5kW – this corresponds to ten 250W amplifiers A discussion on the LLRF spec’s is started in collaboration with the Grenoble team For the vertical FB, a first upgrade of the iGp system with 12-bit ADC and full compatibility with the old software will be tested in the next DAFNE run Other design and test activities are in progress for the LFB and the TFB with the goal to be tested in the next DAFNE runs starting from May of this year.