BE-CO work for the TS Outcome of the actions 23 – 28 Apr 2012 8 May 12P.Charrue - BE/CO - LBOC1.

Slides:



Advertisements
Similar presentations
Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Advertisements

Upgrading Software CIT 1100 Chapter4.
MCSE Guide to Microsoft Exchange Server 2003 Administration Chapter 14 Upgrading to Exchange Server 2003.
15.1 © 2004 Pearson Education, Inc. Exam Managing and Maintaining a Microsoft® Windows® Server 2003 Environment Lesson 15: Configuring a Windows.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
System and Network Security Practices COEN 351 E-Commerce Security.
BE-CO work for the TS Nov 8 Nov 11P.Charrue - BE/CO - LBOC1.
Optinuity Confidential. All rights reserved. C2O Configuration Requirements.
Chapter 10 Server Administration1 Ch. 10 – Server Administration MIS 431 – created Spring 2006.
 Contents 1.Introduction about operating system. 2. What is 32 bit and 64 bit operating system. 3. File systems. 4. Minimum requirement for Windows 7.
Using the jFed tool to experiment from zero to hero Brecht Vermeulen FGRE, July 7 th, 2015.
© 2010 VMware Inc. All rights reserved VMware ESX and ESXi Module 3.
VMware vCenter Server Module 4.
16.1 © 2004 Pearson Education, Inc. Exam Managing and Maintaining a Microsoft® Windows® Server 2003 Environment Lesson 16: Examining Software Update.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 12: Managing and Implementing Backups and Disaster Recovery.
controls Middleware – OVERVIEW & architecture 26th June 2013
Wojciech Sliwinski for BE-CO group Special thanks to: E.Hatziangeli, K.Sigerud, P.Charrue, V.Baggiolini, M.Sobczak, M.Arruat, F.Ehm LHC Beam Commissioning.
April WebEx Intel ® Active Management Technology (AMT) LANDesk Provisioning LANDesk Server Manager.
Ch 8-3 Working with domains and Active Directory.
Industrial Control Engineering UNICOS-PVSS evolution Hervé Milcent EN/ICE/SCD 07/10/
Principles of Computer Security: CompTIA Security + ® and Beyond, Second Edition © 2010 Baselines Chapter 14.
Linux Operations and Administration
Chapter-4 Windows 2000 Professional Win2K Professional provides a very usable interface and was designed for use in the desktop PC. Microsoft server system.
Configuring the MagicInfo Pro Display

© 2005,2006 NeoAccel Inc. Partners Presentation SSL VPN-Plus 2.0 Quick Start Guide.
DONE-10: Adminserver Survival Tips Brian Bowman Product Manager, Data Management Group.
Copyright© 2003 Avaya Inc. All rights reserved Upgrade to Communication Manager 2.0 with Migration to Linux 8.0 Purpose: This presentation was prepared.
Pierre Charrue – BE/CO.  Preamble  The LHC Controls Infrastructure  External Dependencies  Redundancies  Control Room Power Loss  Conclusion 6 March.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 6 Switch Configuration.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 6 Switch Configuration.
Copyright ®xSpring Pte Ltd, All rights reserved Versions DateVersionDescriptionAuthor May First version. Modified from Enterprise edition.NBL.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
IMPLEMENTING F-SECURE POLICY MANAGER. Page 2 Agenda Main topics Pre-deployment phase Is the implementation possible? Implementation scenarios and examples.
Deploying Chromebooks RICK NICHOLAS A.
Using the jFed tool to experiment from zero to hero Brecht Vermeulen Thijs Walcarius GEC 22, March 24 th, 2015.
Configuring and Troubleshooting Identity and Access Solutions with Windows Server® 2008 Active Directory®
Working with Ubuntu Linux Track 2 Workshop June 2010 Pago Pago, American Samoa.
11 MANAGING AND DISTRIBUTING SOFTWARE BY USING GROUP POLICY Chapter 5.
XA R7.8 Link Manager Belinda Daub Sr. Technical Consultant 1.
The Professional Open Source™ Company CLI Shell JBossNetwork Enterprise Manager Command Line Interface.
30/10/2000 Software Installation and Maintenance at LAL - JLab 2000 Software Installation and Maintenance at LAL Michel Jouvin LAL, Orsay
CMW-Admin Joel Lauener BE-CO-IN. CMW-Admin Administration GUI for CMW device servers (FESA, FGC, GM, PROXY, PVSS) Major changes under the hood New log.
UTC-Timing problem P.Charrue for the BE/CO/Timing team 1.
T HE BE/CO T ESTBED AND ITS USE FOR TIMING AND SOFTWARE VALIDATION 22 June BE-CO-HT Jean-Claude BAU.
Operating Systems & Information Services CERN IT Department CH-1211 Geneva 23 Switzerland t OIS Update on Windows 7 at CERN & Remote Desktop.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
7200 Samsung Confidential & Proprietary Information Copyright 2006, All Rights Reserved. 1/16 OfficeServ 7200 Enterprise IP Solutions Data Server S/W Upgrade.
Core 3: Communication Systems. Network software includes the Network Operating Software (NOS) and also network based applications such as those running.
Principles of Computer Security: CompTIA Security + ® and Beyond, Third Edition © 2012 Principles of Computer Security: CompTIA Security+ ® and Beyond,
Definition (Wikipedia)  What is deployment ? “Software deployment is all of the activities that make a software system available for use.” 1. Install.
CERN IT Department CH-1211 Genève 23 Switzerland t MSG Status update Daniel Rodrigues.
SQL SERVER 2008 Installation Guide A Step by Step Guide Prepared by Hassan Tariq.
Technical Stop feed-down P.Charrue on behalf of the BE Controls Group 5th September 2011P.Charrue - 8h30 meeting1.
FESA S. Deghaye for the FESA team BE/CO. What happened since April? followed by “Our plans”
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
LHC Logging Cluster Nilo Segura IT/DB. Agenda ● Hardware Components ● Software Components ● Transparent Application Failover ● Service definition.
LHC Section Meeting 1.eLogbook 2.LHC Controls Security Panel.
Windows Terminal Services for Remote PVSS Access Peter Chochula ALICE DCS Workshop 21 June 2004 Colmar.
VMware Certified Professional 6-Data Center Virtualization Beta 2V0-621Exam.
Upgrades of Operational Linux Platforms Vito Baggiolini BE-CO-DO 1.
- My application works like a dream…does it. -No prob, MOON is here. F
Virtualization Review and Discussion
Overview – SOE Sudo SEP 2014.
CompTIA Server+ Certification (Exam SK0-004)
CV PVSS project architecture
Network/Controls issue 15 September h00 – 9h30
BE-CO LS1 review View from TE/ABT/EC
Computing infrastructure for accelerator controls and security-related aspects BE/CO Day – 22.June.2010 The first part of this talk gives an overview of.
Downloading and Installing SQLExpress
Presentation transcript:

BE-CO work for the TS Outcome of the actions 23 – 28 Apr May 12P.Charrue - BE/CO - LBOC1

BE/CO work (1/5) Planned intervention on the DB service Tuesday 24th April – 8:00 – 8:15 – Restart of the ACCCON cluster in order to change the 10g compatibility mode ALL db accounts on the ACCCON cluster (dbabco & acc_settings) will not be available for a period of ~ 15 min. – 8:15 – 9:45 – Upgrades of the APEX repositories on ACCCON and LASERDB clusters All APEX-based applications running on both clusters – 8:15 – 9:00 – Upgrade of the Oracle application service running on cs-ccr-oas1 Controls Configuration ADF Editors => ALL DONE. NO PROBLEMS ENCOUNTERED Remove of the symbolic link "/user/pcrops/data -> /user/slops/data" as LSA will redeploy the SDDS_BROWSER => NOT DONE. POSTPONED TO NEXT TS 8 May 12P.Charrue - BE/CO - LBOC2

BE/CO work (2/5) There will be an intervention on the network Faraday cage in BA6 24 Apr 2012 all day which will impact the technical network in BA6. – See – CANCELLED by IT/CS New version of the DIAMON agent deployed in order to detect faster a lost agent => POSTPONED TO THE NEXT TechnicalStop BE/CO/IN will try to reboot as many Linux and Windows Consoles, Vistars, CCC Wall Screens, Web Servers (CS-CCR-WWW1/3) and General Purpose Samba Servers (CS-CCR-SAMBA1/GWPC) during the week and/or Tuesday (Injector related)). This is for the usual Operating System updates.  ALMOST ALL DONE. Wall Screens, Web Servers and Samba Servers were not rebooted. NO PROBLEMS ENCOUNTERED Cu/Cu Wfip repeater changed in RE38 => DONE. NO PROBLEMS ENCOUNTERED 8 May 12P.Charrue - BE/CO - LBOC3

BE/CO work (3/5) Change of the ROOT password policy in the FrontEnd – No direct root access anymore (password has been changed and will be kept secret) – Users shall login to the FECs with their personal login, they must do a first hop to a CO trusted machine. No password is required in the FECs, authentication is based on a public/private DSA keyset – Root privileges can be obtained using sudo, which is automatically enabled for everyone in the dscdev group. Root privileges can be restricted with a sudoers list. => DONE. NO PROBLEMS ENCOUNTERED Install 24Gb of RAM in CS-CCR-COLSA (was 12Gb) => DONE. NO PROBLEMS ENCOUNTERED Samba server upgraded to prevent the security hole – Herve Milcent is announcing the upgrade to his users who may prefer certain times during the LHC Technical Stop week. – The update can be performed in a few seconds and no reboot is required. In rare cases PVSS clients on Windows Terminal may have difficulty reconnecting. => DONE. NO PROBLEMS ENCOUNTERED 8 May 12P.Charrue - BE/CO - LBOC4

BE/CO work (4/5) BE/CO/HT will perform a CTR firmware upgrade intervention on the machines listed next slide. – This has already been agreed upon with Lars Jensen. This is to solve a bug and introduce new features. – As to the modifications this firmware introduces, there are mainly: 1. bug fix of a potential loss of 1ms bug. 2. fix of MEN-A20 compatibility in the VME core. 3. support of additional HPTDC functionality. – All the CTRs in the field were upgraded in Apr 2011 to the new version of the firmware. The ones that are quoted here were overlooked during that campaign. It is likely that those CTRs were in lab machines and silently sneaked into operation during the last year. – The expected time per machine is about 20'. It can be done mostly concurrently, so each machine can be scheduled at a (coincident) given time. BE/CO/HT will arrange with Lars for this. => DONE. NO PROBLEMS ENCOUNTERED 8 May 12P.Charrue - BE/CO - LBOC5

BE/CO work (5/5) Upgrade of all CMW Proxies for LHC & Injectors – Logging System, many client GUIs, WorkingSets – New Proxy version was running since start-up on two instances: LHC BBQ, PS CTM. No problems were reported/observed. In case of problem, it can be quickly rolled-back to the previous version. We found several problems/issues in the new Proxy version after deployment for PS CTM All issues were understood and fixed New version was deployed only for: LHC BBQ, LHC BETS & PS CTM Now in validation mode, if all goes fine, new version will be deployed for other instances during no-beam time Outcome: partially DONE, to be followed-up Upgrade of one JMS node in CO-PRO cluster – Many systems depending on JMS (e.g. Logging, LSA, InCA, PM, …) – New JVM setting are being tested now on other JMS instance (CMW Log). In case of problem, it can be quickly rolled-back to the previous JVM settings. One of brokers in the CO-PRO JMS cluster was upgraded to the new version of ActiveMQ Updated also JVM memory settings Outcome: DONE Upgrade of CMW Configuration Server due to a fixture in data retrieval procedure – All operational LHC front-ends. – Service was operational during 2011 run and worked without any problems. The current change has to reflect changed db connection string and new deployment procedure. Service was upgraded and is working properly Outcome: DONE 8 May 12P.Charrue - BE/CO - LBOC6