Integration TestBed (iTB) and Operations Provisioning Leigh Grundhoefer.

Slides:



Advertisements
Similar presentations
4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
Advertisements

German Cancio – WP4 developments Partner Logo WP4-install plans WP6 meeting, Paris project conference
Software Project Transition Planning
Assessment of Core Services provided to USLHC by OSG.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
GIG Software Integration: Area Overview TeraGrid Annual Project Review April, 2008.
Open Science Grid Software Stack, Virtual Data Toolkit and Interoperability Activities D. Olson, LBNL for the OSG International.
OSG Operations and Interoperations Rob Quick Open Science Grid Operations Center - Indiana University EGEE Operations Meeting Stockholm, Sweden - 14 June.
OSG Services at Tier2 Centers Rob Gardner University of Chicago WLCG Tier2 Workshop CERN June 12-14, 2006.
EMI INFSO-RI EMI Quality Assurance Processes (PS ) Alberto Aimar (CERN) CERN IT-GT-SL Section Leader EMI SA2 QA Activity Leader.
Pacman issues affect Core software Infrastructure Testbed Preparing demos Preparing interoperability tests This is a critical time for establishing good.
Integration and Sites Rob Gardner Area Coordinators Meeting 12/4/08.
OSG Middleware Roadmap Rob Gardner University of Chicago OSG / EGEE Operations Workshop CERN June 19-20, 2006.
The Disk Resource Manager A Berkeley SRM for Disk Cache Implementation and Testing Experience on the OSG Jorge Luis Rodriguez IBP/Grid Mini-Workshop Apr.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
May 8, 20071/15 VO Services Project – Status Report Gabriele Garzoglio VO Services Project – Status Report Overview and Plans May 8, 2007 Computing Division,
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks PPS All sites Meeting: Introduction & Agenda.
05/29/2002Flavia Donno, INFN-Pisa1 Packaging and distribution issues Flavia Donno, INFN-Pisa EDG/WP8 EDT/WP4 joint meeting, 29 May 2002.
March 11, 2008 USCMS Tier-2 Workshop Oh Dear God Alain made a PowerPoint presentation 1.
NA-MIC National Alliance for Medical Image Computing UCSD: Engineering Core 2 Portal and Grid Infrastructure.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
OSG Tier 3 support Marco Mambelli - OSG Tier 3 Dan Fraser - OSG Tier 3 liaison Tanya Levshina - OSG.
Open Science Grid An Update and Its Principles Ruth Pordes Fermilab.
INFSO-RI Enabling Grids for E-sciencE OSG-LCG Interoperability Activity Author: Laurence Field (CERN)
Grid Operations Lessons Learned Rob Quick Open Science Grid Operations Center - Indiana University.
State of the OSG Software Stack Alain Roy OSG Software Coordinator.
Ruth Pordes November 2004TeraGrid GIG Site Review1 TeraGrid and Open Science Grid Ruth Pordes, Fermilab representing the Open Science.
GCRC Meeting 2004 BIRN Coordinating Center Software Development Vicky Rowley.
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
Providing a coherent view of SFT products to potential new users Stefan Roiser PH/SFT.
OSG Integration Activity Report Rob Gardner Leigh Grundhoefer OSG Technical Meeting UCSD Dec 16, 2004.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Antonio Retico CERN, Geneva 19 Jan 2009 PPS in EGEEIII: Some Points.
Site Validation Session Report Co-Chairs: Piotr Nyczyk, CERN IT/GD Leigh Grundhoefer, IU / OSG Notes from Judy Novak WLCG-OSG-EGEE Workshop CERN, June.
Alain Roy Computer Sciences Department University of Wisconsin-Madison Condor & Middleware: NMI & VDT.
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
Report from the WLCG Operations and Tools TEG Maria Girone / CERN & Jeff Templon / NIKHEF WLCG Workshop, 19 th May 2012.
The OSG and Grid Operations Center Rob Quick Open Science Grid Operations Center - Indiana University ATLAS Tier 2-Tier 3 Meeting Bloomington, Indiana.
Production Oct 31, 2012 Dan Fraser. Current Production Focus Transition to RPMs 52(44) sites using RPM based installs 52(44) sites using RPM based installs.
Operations Activity Doug Olson, LBNL Co-chair OSG Operations OSG Council Meeting 3 May 2005, Madison, WI.
EMI INFSO-RI Software Quality Assurance in EMI Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
OSG Area Coordinator’s Report: Workload Management Maxim Potekhin BNL May 8 th, 2008.
OSG Deployment Preparations Status Dane Skow OSG Council Meeting May 3, 2005 Madison, WI.
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
April 25, 2006Parag Mhashilkar, Fermilab1 Resource Selection in OSG & SAM-On-The-Fly Parag Mhashilkar Fermi National Accelerator Laboratory Condor Week.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL DOE/NSF Review of US LHC Software and Computing Fermilab Nov 29, 2001.
Area Coordinator Report for Operations Rob Quick 4/10/2008.
Thoughts on How to Distribute the Bare Minimum for Analysis Natalia Ratnikova, Fermilab 16 May, 2006 Software Development Tools Meeting.
INFSO-RI Enabling Grids for E-sciencE Operations Parallel Session Summary Markus Schulz CERN IT/GD Joint OSG and EGEE Operations.
Tier 3 Support and the OSG US ATLAS Tier2/Tier3 Workshop at UChicago August 20, 2009 Marco Mambelli –
Components Selection Validation Integration Deployment What it could mean inside EGI
CERN Certification & Testing LCG Certification & Testing Team (C&T Team) Marco Serra - CERN / INFN Zdenek Sekera - CERN.
SRM-DRM ITB Service Integration Plan Jorge Rodriguez OSG Integration Workshop at UC Feb 15-18, 2005.
The Great Migration: From Pacman to RPMs Alain Roy OSG Software Coordinator.
OSG Status and Rob Gardner University of Chicago US ATLAS Tier2 Meeting Harvard University, August 17-18, 2006.
Monitoring and Information Services Core Infrastructure (MIS-CI) Service Description Mark L. Green OSG Integration Workshop at UC Feb 15-17, 2005.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
OSG Facility Miron Livny OSG Facility Coordinator and PI University of Wisconsin-Madison Open Science Grid Scientific Advisory Group Meeting June 12th.
Open Science Grid Configuring RSV OSG Resource & Service Validation Thomas Wang Grid Operations Center (OSG-GOC) Indiana University.
GridCat ITB Service Integration Plan Bockjoo Kim OSG Integration Workshop at UC Feb 15-17, 2005.
1 Open Science Grid Middleware at the WLCG LHCC review Ruth Pordes, Fermilab.
Open Science Grid Interoperability
Bob Jones EGEE Technical Director
Open Science Grid Progress and Status
9/18/2018 Department of Software Engineering and IT Engineering
Leigh Grundhoefer Indiana University
Monitoring and Information Services
gLite The EGEE Middleware Distribution
Presentation transcript:

Integration TestBed (iTB) and Operations Provisioning Leigh Grundhoefer

2/15/052 Architecture, Requirements and Services into the OSG Deployment Activity Integration Test Bed Provisioning Blueprint (ARCH) Release Description Technical Groups VO’s Service Development (Sponsored Activities) ITB 0.3 Operations OSG 0.4 Release Candidate

2/15/053

2/15/054 Service Description Provide a functional description of the service Describe resource requirements Describe dependencies Describe the integration validation test

2/15/055 Installation and Configuration Discuss site-level install & configuration procedures (if applicable) Describe ITB-level service installation & configuration (if applicable) – GridCat and Monalisa fall into this category Delivery method –e.g. Tools used (Pacman, RPM, via GRAM) Configuration high points –Main set of issues that require attention

2/15/056 Test and Validate The service is considered tested after: –site level test (post-install): –resource provider test: –application test: –service monitor? each of these should be described in terms of functionality and scale

2/15/057 Support and Documentation Information created in the twiki for the iTB Release Support to Or directly to the service providers Known Issues updated for the iTB Release

2/15/058 OSG Integration Activity OSG Deployment Activity Metrics & Certification Application validation VO Application Software Installation OSG Integration Activity Release Description Middleware Interoperability Software & packaging Functionality & Scalability Tests Readiness plan adopted Service deployment OSG Operations-Provisioning Activity Release Candidate Readiness plan Effort Resources feedback

2/15/059 Provisioning Installation cache setup pacman packages pre-compiled binaries source code ( compiled on the site ) RPM capable Configuration mechanisms VDT setup questions VDT installed configuration_X OSG installed configure_osg

2/15/0510 Provisioning Documentation Translate OSG information to production operations area Provide timelines for Support Centers and Resources Versioning Deploy or upgrade grid-wide services

2/15/0511 Common Questions Why can’t we move services through more quickly? Why can’t the software/software work the first time?